In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.
Journal of Construction Engineering and Project Management
/
제2권2호
/
pp.45-52
/
2012
This study introduces a methodology to evaluate different types of non-nuclear technologies to see how they are competitive to the nuclear technology for quality control (QC) and quality assurance (QA) in soil condition measurement for highway pavement construction. The non-nuclear methods including the Electrical Density Gauge (EDG) and the Light Weight Deflectometer (LWD) were tested for their performance against a nuclear gauge, and traditional methods were used as baselines. An innovative way of comparing a deflection gauge to a density gauge was introduced. Results showed that the nuclear gauge generally outperformed the non-nuclear gauge in accuracies of soil density and moisture content measurements. Finally, a framework was developed as a guideline for evaluating various types of non-nuclear soil gauges. From other perspectives rather than accuracy, it was concluded that the non-nuclear gauges would be better alternative to the nuclear gauge when the followings are considered: (1) greater life-cycle cost savings; (2) elimination of intense federal regulations and safety/security concerns; and (3) elimination of licensing and intense training.
The 1th International Conference on Construction Engineering and Project Management
/
pp.1231-1236
/
2005
Global construction projects manifest more risks than do other industries. Often, firms doing business in construction markets find these risks intimidating. To secure corresponding profits, many global contractors attempt to forecast the effects of risks and establish risk management strategies. However, one key problem with present-day risk management methods is that they are basically analytical or mathematical-oriented approaches which are not easy to adopt in real business. Based on preliminary investigations and evaluations of current tools, this research elicits more practical algorithms for risk checklist by constructing risk scenarios over the whole period of project execution. For the application of the algorithms, a "SE/RF" (Source-Event/Regular-Floating) checklist is suggested, which sorts out risk sources and their subsequent events, as well as dividing various risk factors into either regular or floating categories. In addition, the "PIS" (Probability-Impact-Significance) method is introduced, in place of traditional "PI" (Probability-Impact) methods, by adding the additional criterion of "risk significance" to determine the degree of risk exposure in a more realistic way. As a result, we draw the significant finding that the "PIS" method presents a closer evaluation regarding degree of risk exposure as compared to the level of expert judgments than those from traditional methods. Finally, we provide an integrated procedure for international project risk management with all of the research achievements being incorporated.
The government's financial subsidy system for the construction project of urban rail transit needs to be revised. In 1998, the central government raised its subsidy rate to 50$\%$ of the total cost of construction. The 'method for differentiating subsidies depending on construction type and transit System' is suggested here, so that a subsidy rate can be raised for the construction of Light Rail Transit, which costs less to construct. Such methods will force local governments to make decisions regarding construction method and project size in a more rational manner.
This study deals with problems of technical assistance through accidents analysis and questionnaires on small-sized construction sites which are difficult to understand real condition and administrate legally and indicated following efficient methods of technical assistance. (1) Ensuring access to the small-sized construction sites. (2) Delegation technical assistance service to civilian and supporting selected. (3) Raising of the person's safe consciousness concerned with the small-sized construction sites. (4) Safety consulting for the head office of small-sized construction sites.
Construction schedule plays a key role in project management due to its influence on the project success. Thus, it is important to identify factors affecting construction delay. The major objective of this study is to identify and evaluate factors affecting construction delay in apartment projects in Vietnam. The findings confirmed that financial difficulties of owners and contractors, contractors without adequate experience, non-available materials on time, slow site clearance, inappropriate construction methods, defective works and reworks, and lack of capable owners/project managers are the major causes of delay in apartment projects.
Mainly, this research is consisted management of construction works. And this research is explained how make manage of workers health and methods of safety work in construction sites. As a result, writter researches to make ideas for manage to use that analyse each type of workers they are old workers, foreigner workers and general technicians.
현재의 건설사업 과정은 사업 참여자들 간의 비효율적인 의사소통이 소유자의 요구를 정확히 반영하지 못하기 때문에 효율적인 건설관리가 어려운 상황이다. 이를 해결하기 위해 최근 참가자들 간의 수평적 관계 형성을 통해 협력과 신뢰구축을 가능하게 하는 린 건설기반 통합 프로젝트 발주방식이 적용되고 있다. 린 건설 기반의 IPD는 건설 산업의 생산성 향상에 효과적임에도 불구하고, 기존 연구에서는 린 건설 기반의 IPD 를 적용하는 구체적인 방법이 부족하다. 본 연구는 린 건설 기반의 IPD 프로젝트가 어떻게 성공했는지 분석했다. 이 연구는 IPD 프로젝트가 성공으로 이어질 수 있는 영향 요인을 도출하기 위해 먼저 기존 연구와 보고서를 통해 분석되었다. 영향 요인을 기반으로 단일 사례 분석을 통해 실제 적용 방법을 분석하였다. 연구의 범위는 이전의 분석을 바탕으로 IPD 프로젝트의 각 성공요인에 대한 적용 방법을 제시하는 것으로 제한되었다. 본 연구는 향후 국내 건설 기반 IPD 프로젝트의 실행에 사용될 수 있다.
자원개발 등의 이유로 시베리아나 알래스카와 같은 극한(寒)지 진출이 국내는 물론 세계적으로도 증가 추세에 있다. 이에 따라 본 연구에서는 남극 제2기지 건설사업을 대상으로, 극한지 건설사업 진출을 위한 위성영상 활용방안을 도출하고자 하였다. 남극을 포함한 극한지는 지역적 특성상 원격지이고 접근이 어렵다는 특성에 따라 위성영상의 활용은 필수적이라 할 수 있다. 본 연구에서는 극한지 건설 프로세스 전반에 대한 검토와 극한지 위성영상 활용사례 분석 및 관련 논문 등 문헌리뷰를 통해 건설 단계별 위성영상 활용가능항목 및 활용방안을 제시 하였다.
국내 OSC가 활성화되기 위해서는 설계 및 엔지니어링, 공장제조, 현장조립 등 각 단계별로 적용되는 기술의 혁신도 중요하지만, 기존 건설 생산방식과 차별화되는 관리 및 운영방식의 개발도 필요하다. 하지만, 현재 국내에서 진행되고 있는 OSC 관련 연구는 공법 개발과 같은 기술개발 측면의 연구가 주를 이루며, OSC 프로젝트의 성공을 위한 관리 방안 도출과 관련한 연구는 미진한 실정이다. 따라서, OSC 프로젝트의 핵심성공요인의 명확한 이해에 기반한 프로젝트 관리 방안 도출에 대한 연구가 요구되는 바이다. 이에 본 연구의 목적은 해외에서 선행된 OSC 프로젝트의 성공요인과 관련한 다수의 연구들을 분석하여 국내 OSC 프로젝트의 성공적 관리를 위한 핵심 시사점을 제시하는 것이다. 이를 통해 향후 국내에서 확산될 OSC 프로젝트의 성공 가능성 제고에 기여하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.