• Title/Summary/Keyword: construction methods

Search Result 5,951, Processing Time 0.034 seconds

A Study on the Economic Evaluation of Thermal Spray Methods for the Corrosion Protection of Steel (금속용사 방식공법의 경제성 평가에 관한 연구)

  • Jung Sung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.13-16
    • /
    • 2005
  • Generally, as corrosive protection processing of a steel structure, zinc galvanizing and heavy duty coating paint are applied. However, zinc galvanizing has the difficulty of restriction of a size, or on-site construction. Moreover, heavy duty coating paint has a problem with many administrative and maintenance expenses with short problem of adhesion, corrosion generating of a damage portion, and maintenance management cycle. In this study, a salt water spray test, CASS test, and the electrochemistry examination were carried out for the thermal metal spray method of construction for corrosive protection performance evaluation. Moreover, the corrosive protection life of a thermal metal spray method of construction was quantitatively calculated on the basis of this experiment. in consideration of LCC, the economical efficiency of a general corrosive protection method of construction and a thermal metal corrosive protection method of construction was compared. Consequently, although initial construction expense was estimated 16 to $30\%$ high, as for a thermal metal spray method of construction, it turns out that the administrative and maintenance expenses for 100 years became cheap 9.3 to 13 or more times.

  • PDF

A Case Study on Delay Analysis Methods in the Construction Projects (건설공사 공기지연 분석방법의 사례연구)

  • Kim, Young-Jae;Lee Woo-Chang;Hong Jung-Suk;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.129-137
    • /
    • 2004
  • When we consider the present state of construction delay claim analysis, the delay analysis methods generally used from the abroad construction industries are not applied to our industry. By reviewing the existing methods of delay analysis, this study investigated the important concepts and characteristics of the delay analysis methods. Selection of the delay analysis methods could be decided among 1)As-planned versus as-built comparison method,2)What-if method,3)But-for method.4)CPA method, and 5)DAMUDS method. In order to make clear the characteristics and mechanisms of the analysis methods, this study performed a case study.

Comparison of Construction Methods with Zoysiagrass at the New Incheon International Airport (인천국제공항 착륙대 녹지지역의 잔디식재를 위한 한국잔디류 시공법 비교)

  • 이상국;이정호;주영규
    • Asian Journal of Turfgrass Science
    • /
    • v.16 no.2
    • /
    • pp.75-83
    • /
    • 2002
  • The back-filled soil of the New Incheon International Airport construction site was reclaimed with sea sand in near the Young-Jong island. The primary study was carried out from August 1993 to June 1997 to study soil amendment and to select salt resistance turfgrass species. This study dealt with low maintenance area that included most part of open space of airport site. The second experiment, from October 1996 to August 1998, focused on soil amendment and selection of turfgrass species for alongside runway where turf area was maintained. Through two previous studies, propagation methods with zoysiagrass were tested for alongside runway and surrounding areas at 1998. The study of construction methods with zoysiagrass, vegetative propagation showed better results on visual quality and cover rating compare with seeding propagation. However, significant different between vegetative and seeding propagation was not showed on visual quality and drought tolerance after one year of plot establishment. The cover rating by seeding construction methods reached in excess of 70% of limitation suggested by the Incheon International Airport Cooperation. Zoysia net and sprigging net methods were the most suitable where there requires rapid and high rate of ground cover. Seeding propagation should be acceptable to obtain a resonable cover rating where there allows relatively longer period of completion. Therefore, it should be possible to attain a proper rating of ground cover on the site of open space, alongside runway or areas similar to the New Incheon International Airport which is being built on dredged seashore sand. However, the methods of soil amendment, selecting salt tolerance species, and proper construction procedure should be considered at the a time.

Development of PC modular Construction System using 3D Infill (3D Infill을 활용한 PC모듈러 시공시스템 개발)

  • Chung, Joo-Soo;Lim, Seok-Ho;Heo, Byung-Wook;Chae, Ji-Yong;Park, Jin-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.14-15
    • /
    • 2020
  • The need for off-site construction has increased in the construction industry in Korea in recent years due to the enforcement of the 52-hour workweek, the increasing age of workers on construction sites, the deepening dependence on overseas workers, and the stagnation of productivity in the construction industry. Thus, studies on OSC started in April 2020. In addition, as a national policy study advocating the modular construction method, which is one of the OSC methods, was completed in the first half of 2019. 70 housing units in two complexes that satisfied the Housing Act requirements have been supplied to citizens. However, although modular construction methods have been recognized as a dramatic construction method that achieves shortened construction schedules and solves the issues of cost reduction and the shortage of technical workers on sites by combining the advantages of the manufacturing industry and applying the economies of scale, realistically it has issues due to the rising cost of steel and a low pre-fabrication ratio. Moreover, the construction time of core parts, such as those built by pouring concrete, has become a factor that hinders the shortening of construction times. Thus, this study aims to propose a precast concrete(PC) modular construction system, which fuses three-dimensional infill as an interior finish material and a three-surface PC module that can acts as a structure for a construction method that is economical and can shorten construction time.

  • PDF

The Trend of CM at Risk in the U.S Construction Market (미국 CM at Risk 시장 동향 및 시사점)

  • Chang, Chul-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.67-73
    • /
    • 2006
  • Alternative project delivery methods including design-build and CM at Risk have evolved as a means of meeting owner's diverse needs and implementing project efficiently with limited budget and time in more competitive construction environment. It is time to consider adopting alternative project delivery methods, especially CM at Risk, for domestic construction industry to enhance competitiveness and to provide various options for owners so that they can select more appropriate project delivery methods for the facility being planned. This research report derives suggestions from investigating how CM at Risk has been evolved in the US construction market. Besides the analysis of CM at Risk market in the US construction industry, the characteristics of companies whose market share are in Top 100, the type of facility usually built by this method were investigated. Based on the analysis of CM at Risk in the US, the prepositions in adopting CM at Risk to domestic construction industry and the possibility of adopting this method have been identified.

  • PDF

Construction of Visual Space using Relief Texture Mapping (Relief Texture 매핑을 이용한 가상공간 구축)

  • 이은경;정영기
    • Proceedings of the IEEK Conference
    • /
    • 2003.07e
    • /
    • pp.1899-1902
    • /
    • 2003
  • Recently several methods have been developed for the virtual space construction. Generally, most of the methods are geometric-based rendering technic, but they are difficult to construct real-time rendering because of large data. In this paper, we present a three dimension image-based rendering method that enable a constant speed of real-time rendering regardless of object complexity in virtual space. The Proposed method shows good performance for the virtual space construction with high complexity.

  • PDF

Basic Train of Thoughts for the Construction of Low Cost Scenery Spots

  • Duanmu, Shan
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.1
    • /
    • pp.213-218
    • /
    • 2001
  • To many developing countries like China, the practical way to constant development of city construction is low consuming. The basic methods of low-cunsuming landscape construction: 1) Low building consumption: Decreasing construction quantity. Using low-costing material. Designing low-consuming landscape. Reusing of building material. 2) Low energy consumption: Decreasing water consumption. Consuming and enrichment of earth fertilizer. Decreasing electrical consumption. 3) Low maintenance: Adapting natural material. Using local plants. Special design to decrease maintaining. Because of many reasons, China has not yet adapting Low-consuming Landscape Construction.

  • PDF

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

Worker Safety in Modular Construction: Investigating Accident Trends, Safety Risk Factors, and Potential Role of Smart Technologies

  • Khan, Muhammad;Mccrary, Evan;Nnaji, Chukwuma;Awolusi, Ibukun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.579-586
    • /
    • 2022
  • Modular building is a fast-growing construction method, mainly due to its ability to drastically reduce the amount of time it takes to construct a building and produce higher-quality buildings at a more consistent rate. However, while modular construction is relatively safer than traditional construction methods, workers are still exposed to hazards that lead to injuries and fatalities, and these hazards could be controlled using emerging smart technologies. Currently, limited information is available at the intersection of modular construction, safety risk, and smart safety technologies. This paper aims to investigate what aspects of modular construction are most dangerous for its workers, highlight specific risks in its processes, and propose ways to utilize smart technologies to mitigate these safety risks. Findings from the archival analysis of accident reports in Occupational Safety and Health Administration (OSHA) Fatality and Catastrophe Investigation Summaries indicate that 114 significant injuries were reported between 2002 and 2021, of which 67 were fatalities. About 72% of fatalities occurred during the installation phase, while 57% were caused by crushing and 85% of crash-related incidents were caused by jack failure/slippage. IoT-enabled wearable sensing devices, computer vision, smart safety harness, and Augment and Virtual Reality were identified as potential solutions for mitigating identified safety risks. The present study contributes to knowledge by identifying important safety trends, critical safety risk factors and proposing practical emerging methods for controlling these risks.

  • PDF

An Algorithm for Scheduling Repetitive Projects with Resource Continuity and Different Batch Sizes

  • Shim, Euysup;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.565-578
    • /
    • 2013
  • Batch production is common in repetitive construction projects, and it is not unusual for different batch sizes to be used by contractors in one project. While several scheduling methods, such as the Linear Scheduling Method (LSM) and the Repetitive Scheduling Method (RSM) have been proposed and used, no mathematical method for repetitive construction projects has been developed, and it is difficult to consider different batch sizes with the existing methods. An original mathematical algorithm for scheduling repetitive projects with different batch sizes is proposed in this study. This algorithm is illustrated with assumptions of resource continuity and single path in a project and introduces new terms, control batch and critical batch. The algorithm logics and mathematical equations are validated by comparison with the outcomes from a graphical scheduling approach through a simple and practical hypothetic project. As a result, it is expected that the proposed algorithm can be easily adapted and extended to computer software for scheduling, and can be a starting point for research on batch size management in repetitive construction projects.