The management of subway business in large cities has recently become more difficult because of increased construction and operation costs. To cope with this situation, it is necessary to examine the methods of obtaining returns on development profits of land value rises that occur due to subway construction along subway lines, For this purpose, we examined the actual situation of rises in land values brought about by the construction of subway line #3 and line #4 in Seoul with application of three methods. In this research, we have calculated a basis of the development profits produced by the construction of subway line. According to the results, development profits produced by the subway construction differ depending on the method adopted. If, however, we accept line comparison analysis method, the total development profits amount to 557,3 billion won that is equivalent to 37 percent construction cost.
The 1th International Conference on Construction Engineering and Project Management
/
pp.886-891
/
2005
The frequent maintenance required on some asphalt concrete (AC) pavement sections has made reconstruction with Portland Cement Concrete Pavement (PCCP) a feasible alternative. However, many constructability issues need to be addressed in order to realize the full potential of this alternative. Accelerated paving encompasses three classes of activities: methods to accelerate the rate of strength gain, methods to minimize the construction time, and traffic control strategies to minimize user delay. Three major AC intersections with severe rutting problems were reconstructed with PCCP. The entire reconstruction of each intersection, including demolition of the AC pavement and its replacement with PCCP, took place over a period of three days, starting on Thursday evening and opening the intersection to the traffic on Sunday afternoon. This paper discusses the use of PCCP for accelerated reconstruction of major urban intersections with minimal user and traffic disruption, using innovative construction techniques and traffic management optimization principles and demonstrates that concrete pavements can be constructed efficiently and quickly.
근래에 들어 한옥에 대한 인식의 변화와 더불어 한옥에 살고자 하는 선호도가 증가하는 등 한옥에 대한 관심이 급증을 하고 있는 가운데 정부에서는 한옥에 대한 제도를 개선하고 예산을 반영하는 등, 한옥관련 사업을 다각도로 추진하고 있다. 그러나 상대적으로 높은 공사비는 한옥의 대중화 및 지속적 발전에 장애요인중의 하나가 되고 있다. 이를 개선하고자 정부에서는 '한옥기술개발'의 R&D사업을 추진하고 있으며, 그에 따라 본 논문은 '한옥기술개발'의 일환으로 실제 지어진 전통한옥과 신한옥의 생산성을 토대로 효율적인 공사비 저감의 방향을 제시하고자 한다. 분석방법으로 한옥공사의 15개 대공종 중 주요공종을 선정하였다. 전통한옥과 신한옥 공사 중 주요공종에서의 생산성을 분석하여 재료와 공법의 변화가 생산성에 미치는 영향을 분석하였다. 그 결과, 분석한 주요공종 모두에서 생산성이 향상됨을 확인하였다. 또한 생산성의 향상이 공사비 저감에 어떠한 영향을 끼쳤는지 분석하였다. 주요공종 중 지붕/홈통의 공종은 주로 재료의 변화, 목공사와 마감공사는 공법의 변화, 기초공사와 창호는 재료와 공법 모두의 변화로 인하여 공사비 저감을 이루었다.
The aims of this study are proposal for architectural design guidelines and reviewing the remodeling tendencies in the campus facilities. To achieve these purposes, the architectural remodeling characteristics of 23 campus facilities have been investigated, and the technical construction methods were also analyzed for each one of these facilities. The results from this study are as follows : (1) The requests from the changes of academic plan and the degradation and obsolescence are highly occupied the causes of architectural remodeling in campus facilities. (2) In technical construction methods, the horizontal and vertical additions are effective in campus facilities remodeling. (3) According to the recent campus remodeling tendencies, the campus facility remodeling plan and schedule should be included in campus facility master plan.
Since timbering of a cut in association with underground excavtion work is introduced to domestic, in spite of limitation of special quality in this method, time change, variety of construction, Strut Method is still considered with general methods. Experts have developed methods which is improved in limitation of special quality by continuous studies of normal strut method in basic, and it has been applied to construction site Consequently, this study introduced improved Strut Method to help experts when they select resonable methods with regard to construction site, conditions
The 3th International Conference on Construction Engineering and Project Management
/
pp.642-648
/
2009
Determining the total duration for a construction project is an integral part of project management in the construction industry. This is to ensure the project and all its associated activities can be carried out and completed within the time frame stipulated. There are several commonly used scheduling methods and techniques in project management, some of which involves manual calculation while others involve computer software. This paper looks into the various time determination methods, extracting out their differences and similarities. It also seeks to draw out the problems when determining time for projects, especially those encountered of case studies. Based on the results from the case studies, there were delays on certain projects even though time determination had been carried out rigorously prior to the commencement of the projects. This paper seeks to develop a time determination model, which incorporates risk management techniques into the calculations in order to improve the method for time estimation to minimize the chances of project delay.
Recently, various maintenance materials and construction methods have been developed to secure the sustainable performance of structures. However, waterproofing of underground structures where groundwater infiltration is present is very difficult. In particular, the location of underground structures such as subways is very deep, and it is difficult to apply waterproof materials and construction methods in the case of structures accompanied by vibration. Therefore, we intend to study materials and methods for waterproofing leakage resistance in special environments such as underground structures.
Construction work is a labor-intensive industry, which is required systematic production activities using materials, manpower, and equipment. Among them, manpower resources play a very important role in achieving efficiently production in the organization. Construction work is highly dependent on construction craft workers, and the level of proficiency can be directly related to the construction productivity and quality. However, a rapidly aging construction craft workers in Korea, is being replaced by a foreign construction craft workers because of advoidance of new laborers in the construction site. In the future, if the continuous development and management of construction manpower is not made properly, it may be lead to adverse effects such as setbacks in production, delayed completion, faulty construction, industrial disasters, and decreased productivity in construction site. In this study, it was proposed four important factors for work capacity management of construction craft workers. These were ensuring of physical strength through the health management of construction craft workers, securing of proficiency through career management, ensuring of productivity through work capacity and establing of informatization through work capacity management. By introducing a systematic system, it is possible to improve construction craft workers' professionalism, enhancing the level of welfare, reflecting the realities of labor costs, increasing the quantitative and qualitative levels of construction craft workers, Futhermore it was demanded the continued interest and policy support for the realization of effective management of construction craft workers.
Since water leakage and cracks are not the source of serious problems such as long-term lowering of performance and durability of a stricture, including damages to operating facilities of a structure, damages to internal finishing materials, exhibition, and goods, and pollution of residential environment, they might have led to development of positive coping skills; however, an instant loss of lives or property due to earthquake, explosion, typhoon, or a fire was indeed neglected. In these days, repair materials for leakage cannot help but being taken in temporary way without any noticeable countermeasure. This kind of repair is socially criticized many times that is defective construction even if this costs a lot. It was not arrange the standard for construction methods of sealer of injection type for leakage maintenance, even it has been used various type of construction methods for leakage part. In conclusion, we suggest that the construction methods of sealer of injection type for leakage maintenance for leakage to establish the leakage repairing technology as increase of structure demand. Therefore, it would be possible to provide a stage-by-stage solution by developing systematic research activities among the industry, schools, and research institutes to spread maintenance management techniques globally through technical solution to water leakage and cracks, acquisition of structural safety with prolonged durability for life cycle, reduction of water leakage repair expense s, and so on.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.