• Title/Summary/Keyword: construction methods

Search Result 5,829, Processing Time 0.035 seconds

Analysis of Factors for Selecting Construction Methods for Underground Structures (지하구조물의 공법선정을 위한 요인분석)

  • Kang, Hyun-Jung;Rhim, Hong-Chul;Park, Sang-Hyun;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.37-40
    • /
    • 2007
  • As a demand for underground structure is increasing with more parking and retail spaces required. Various construction methods are reviewed and selected for each specific site for economical and fast construction. In this study, factors for selecting construction methods were categorized for substructure construction. Construction processes of substructure are consisted of methods for excavation, earth retaining systems, and placement of slabs. Factors for the selection of substructure construction method are the condition of surrounding, geotechnical, information and constraint by comfortness for others nearby. After survey for the construction data of 5 different sites, analysis about reliable substructure construction selection method was suggested.

  • PDF

A Study On The Construction Methods In PSC Rail Beams (PSC 궤도빔의 가설공법에 대한 검토)

  • Ahn, Yong-Mo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1293-1299
    • /
    • 2010
  • Daegu urban railroad line 3 is introduced with straddle-type monorail system within the country at the first time. This system is long line with 24km in total length which has not the results of construction in Korea. The rail beam of monorail bridge to be constructed/ installed in the city is adopted on the basis of the PSC rail beam. It is required to apply the steel rail beam at rapid/ curved line parts or location to be required the long span bridge as passing river and intersection. The composition of span bridge is various and the height of bridge is change with each section and exist the different curve radius due to all section is passes in the city. The rail beam shall be considered the ground conditions and then consider the construction methods. It is analyzed to construction period of PSC rail beam to be linked with period of infrastructure construction and construction of steel rail beam, structure construction of station etc. It is compared to crane construction methods and launching girder as alternative construction methods and propose to upper construction methods which is superior in economic and construction.

  • PDF

A Study of Object Recognition for the Efficient Management of Construction Equipment

  • Hyeok-Jun Ryu;Suk-Won Lee;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.587-591
    • /
    • 2013
  • Measuring the process of construction operations for productivity improvement remains a difficult task for most construction companies due to the manual effort required in most activity measurement methods. There are many ways to measuring the process. But past measurement methods was inefficient. Because they needed a lot of manpower and time. So, this article focus on the vision-based object recognition and tracking methods for automated construction. These methods have the advantage of efficient that human intervention was reduced. Therefore, this article is analyzed the performance of vision-based methods in the construction sites and is expected to contribute to selection of vision-based methods.

  • PDF

Railway Underground Crossing Method Using PC Slab (직접 PC슬래브설치를 통한 철도지하횡단 공법의 적용 연구)

  • Min, Kyung-Ju;Lee, Bang-Woo;Park, Byung-Yong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2439-2449
    • /
    • 2011
  • Existing grade crossings between railway and roadway area gradually changed to grade separation systems by the law. In the case of new roadway construction which crosses railways, it shall be grade separation system in principle. With the railway underground crossing method, many practices have been developed which can minimize rail displacements and avoid rail release. With these methods, the effects to the train can be reduced. The underground crossing methods can be identified as open-cut methods and non open-cut methods. The open-cut methods include temporary support methods and special rail construction methods. Also the non open-cut methods includes pipe roof methods, front jacking methods, messer shield methods, NTR methods and JES methods. Among these, the most suitable method is applied considering safety, economy, class of each rail system (train passing frequency and velocity), etc. In the non open-cut methods, the cost and duration shall be increased to keep existing rail system during construction. In the open-cut methods which use plate girders, the rail speed shall be restricted due to the displacement and vibration of the girder. In this study new grade separation methods were developed. With this method, the safety during construction can be increased. This method refines temporary support methods, but pc slab girder with huge stiffness is applied instead of plate girders. With this method, the rail displacement can be reduced and higher safety can be obtained during construction. Also construction cost and duration can be minimized because the temporary work and the overburden soil depth can be reduced.

  • PDF

A Study on the Comparison of the Construction Process between the PC Modular Construction Method Using 3D Infill and the Existing Construction Method (3D Infill을 활용한 PC 모듈러공법과 기존공법과의 시공프로세스 비교 연구)

  • Chung, Joon-Soo;Lim, Seok-Ho;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.87-88
    • /
    • 2023
  • In accordance with changes in the domestic construction environment, interest in off-site construction methods (factory-manufactured construction methods) including modular construction methods is rapidly increasing. Among various off-site (OSC) construction methods, the front runner is the steel-based box-type modular construction method. Compared to the existing wet construction method, the steel modular construction method is increasing in terms of securing economic feasibility by shortening the construction period and increasing the prefabrication rate. However, due to the recent rise in raw materials and a sharp rise in the exchange rate, the economic feasibility of the wet method is deteriorating compared to the wet method. Therefore, a hybrid between 9-Matrix-based OSC construction methods is considered as a solution, away from the steel-box type combination, and a comparative study of the construction process between each construction method is being conducted. It was analyzed that the PC modular construction method shortened the construction period by 9% compared to the existing steel modular construction method. On the other hand, when comparing the construction period of the Gayang-dong demonstration complex calculated assuming that all modules are applied, it is estimated that there will be a 12% reduction in construction period compared to the steel modular method and a whopping 43% compared to the RC method.

  • PDF

THE PRELIMINARY INVESTIGATION OF CURRENT CONSTRUCTION PAYMENT PRACTICES IN THE UK CONSTRUCTION PROJECTS

  • C.H. Wong;A. Kaka;C. Fortune;D. Langford
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.800-809
    • /
    • 2007
  • Current payment methods have many faults which are detrimental to the formation and completion of a project. This includes the use of unfair payment terms, pricing strategies and payment mechanisms between the contracting parties. This resulted in being criticised and remain in doubt, the use of current payment methods to reward good contractors and to distinguish poorly performed construction firms. In order to have an insight into this issue, a structured survey was conducted amongst UK construction practitioners. It was found that traditional pricing methods (i.e. lump sum and unit price), payment methods (i.e. interim valuation) and retention still dominate current practice. The empirical findings show that there are significant differences in the use of pricing and payment methods (when making and receiving payments) in construction. Significant differences also found in the factors affecting the choice of pricing methods when making (and receiving) construction payments. The paper concludes with analysis of the findings and future direction of research in payment systems is also provided.

  • PDF

Justification of construction methods in middle school textbooks (교과서에서 나타난 작도방법의 정당화)

  • Kang, Mee-Kwang;Hwang, Seur-Gi
    • Proceedings of the Korea Society of Mathematical Education Conference
    • /
    • 2010.04a
    • /
    • pp.151-163
    • /
    • 2010
  • This study is to provide improved teaching methods on classical geometric construction education by a straightedge and compass in school mathematics. In this paper, justifications of construction methods of Korean textbooks, for perpendicular bisector of an segment and angle bisector are discussed, which can be directly applicable to teaching geometric construction meaningfully. Based on these considerations, several implications for desirable teaching methods concerning geometric construction were suggested.

  • PDF

A CONCEPTUAL FRAMEWORK FOR CONCURRENT CONSTRUCTION PLANNING

  • Euysup Shim;Kenneth Reinschmidt
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.440-448
    • /
    • 2009
  • Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.

  • PDF

Integrating Real Options with Earned Value methods as a decision support tool for the financial evaluation of alternative construction methods

  • Bonsang Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.129-132
    • /
    • 2013
  • Determining on a particular construction method is typically decided in the initial phases of a project. However, changing conditions during actual construction may require a different method or technology to be employed. Providing an option for project managers to change construction provides flexibility that can increase value to the overall project. This research provides the ability to modify construction methods as a real option, which allows its value to be modeled. The research also formalizes a way to integrate a binomial lattice model with the Earned Value Method's S-curve. The integrated model provides a decision support tool that planners can use to determine whether to exercise the option depending on the status metrics provided by EVM.

  • PDF

Study on Construction-Standard-Production-Rate for Waterproof Work Based on Site Construction Status (현장시공실태에 따른 방수공사 표준품셈 개정 연구)

  • Oh, Jae-Hoon;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.304-305
    • /
    • 2018
  • Development of waterproof methods and materials resulted in the huge changes in waterproof construction materials. In consequence, the construction-standard-production-rate underwent overall revision in 2018. Especially, from the development of the specification standard and construction methods, the waterproof construction which had lower applicability in the existing construction production rate was revised. The construction methods which did not have applicability were removed. In addition, as there was a material difference based on parts, the constructionstandard-production-rate was revised by distinguishing vertical part and floor. Furthermore, by suggesting more clear work extent, the practicability in creating the standard for calculation of the estimated price in the construction field will increase.

  • PDF