• Title/Summary/Keyword: construction material

Search Result 4,992, Processing Time 0.185 seconds

An Optimization Algorithm of Gypsum Board Loss for Wall Finishing in Modular Construction System (모듈러건축 벽체마감 석고보드 손실 최적화 알고리즘 개발)

  • Lee, Dong-Min;Chin, Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.101-110
    • /
    • 2014
  • The ministry of Land, Infrastructure and Transport announced that they launched the pilot project to offer Happy House built with modular construction as part of the major projects of incumbent government in 2013. The market size of modular construction is getting increasingly enlarged together with strong will of government. The major challenges that current modular construction encounters can be summed up as lack of standardization of material on the stage of design and fabrication. The portion of material costs in modular construction marks 16 to 17% higher than the existing other construction method, and account for 60 % of total construction cost, which is why material management is the most important factor. However, the imperfect standardization and specification on design causes high loss of materials on fabrication, which makes the construction wastes and total construction cost increasing in accordance with the increase of material costs. This study has been conducted to verify major modules by developing optimization algorithm on gypsum board material among wall finishing materials. It is expected that this paper contributes not only to eco-friendly construction by minimizing the waste factors of materials through these efforts, but also to removing high cost issues which had been recognized as a setback of current modular construction.

Analyzing the Impact of Price Fluctuation of Nonferrous Metal Materials on Sectoral Construction Cost (비철금속자재 가격의 변동이 업종별 건설공사비에 미치는 영향 분석)

  • Sang, Jun;Lee, Suk-Won;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.149-151
    • /
    • 2012
  • Changes in the price of materials in construction projects is one of the important variables. Therefore, measures are necessary to respond to the demand and supply of materials and price instability. In previous studies, mainly of ready-mix concrete and steel beam analysis was carried out. However, a study of non-ferrous material prices are still insufficient. So, in this study, the researcher identified the causal relationship between the construction cost and non-ferrous materials prices. Construction Cost Index was selected as a proxy variable of construction cost.

  • PDF

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

The material properties study of a construction sludge for recycling (건설오니(建設汚泥) 재활용(再活用)을 위한 재료적(材料的) 특성(特性) 연구(硏究))

  • Soung, Jin-Kyeong;Kim, Soon-Ho;Bae, Won-Tae;Jun, Myung-Hoon
    • Resources Recycling
    • /
    • v.16 no.4
    • /
    • pp.40-46
    • /
    • 2007
  • This research constructed property analysis for an high additional value construction materials. We try to utilize by the addition material of soil stabilizer. It was described to the material properties analysis of a sludge. A sample used 4 kinds of filtration cake which occurs by 4 companies and 3 kinds of sludge before filtration. ph of a sludge, a particle analysis and a scanning electron microscope observation were performed. We analyzed on the chemical ingredient by XRF, the phase by XRD, observed and analyzed the thermo-property of the sludge and the amount of the volatile constituent by TG-DTA.

Effect of particle size and saturation conditions on the breakage factor of weak rockfill materials under one-dimensional compression testing

  • Rahmani, Hamidreza;Panah, Ali Komak
    • Geomechanics and Engineering
    • /
    • v.21 no.4
    • /
    • pp.315-326
    • /
    • 2020
  • The long-term behavior of rockfill material used in the construction of infrastructures such as dams is of great significance. Because of concerns about the application of weak rockfill material in dam construction, further experimental studies on the behavior of these materials are required. In this study, laboratory experiments were performed to investigate the one-dimensional deformation and particle breakage of the weak rockfill material under stress. A one-dimensional compression apparatus was designed and developed for testing of rockfill materials of different maximum particle sizes (MPSs). The compression tests were performed under dry, wet and saturated conditions on samples of rockfill material obtained from a dam construction site in Iran. The results of the experiments conducted at the specimen preparation stage and the 1D compression tests are presented. In weak rockfill, the effect of the addition of water on the behavior of the material was uncertain as there were both an increases and decreases observed in particle breakage. Increasing the MPS of the weak rockfill materials increased particle breakage, which was similar to the behavior of strong rockfill material. In all of the MPSs examined, the settlement of specimens under wet conditions was higher than that observed under dry conditions. Also, the greatest deformation occurred during the first hour of loading.

Control of Thermal Crack in Mass Concrete Using Automated Curing System (양생자동화 시스템을 이용한 매스 콘크리트 온도균열 제어)

  • Ha, Ju-Hyung;Cho, Yun-Gu;Hyun, Tae-Yang;Lim, Chang-Keun;Seo, Tae-Seok
    • Journal of the Korea Concrete Institute
    • /
    • v.25 no.2
    • /
    • pp.195-200
    • /
    • 2013
  • New thermal crack control system for mass concrete was developed to increase quality and to save construction period and cost. The principle of this system is that the curing water having proper temperature is supplied automatically to the surface of mass concrete member to keep the temperature difference between center and surface of concrete less than generally recommended temperature difference ($20^{\circ}C$). Mock-up test was conducted to investigate the validity of newly developed curing system. As a result, no crack was founded in the specimen using automated curing system developed in this study, while many cracks occurred in another specimen without automated curing system. It was also confirmed that the strength and the durability of the concrete cured by automated curing system were improved.

A Suggest on the Reclassification and Performance Criteria of Construction Material in Korean Public Procurement - Based on the Law of Purchasing Policy for Market Support of Small and Medium Business - (공공공사 직접구매 조달품목 재분류 및 성능기준 제안)

  • Yang, Jinkook;Choi, Yongho;Lee, Eunha;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.31-37
    • /
    • 2014
  • "The Law of purchasing policy for market support of small and medium business" was legislated to support small and medium industry by expanding purchase and revised consistently for the activation. And then the government made the public construction direct purchase compulsory about design items designated by president on small and medium business based on this law. However, secureing quality, tardiness and field material staff's heavy duty were arisen from approximately 120 direct market purchase items. The legislative intent of law is in accord with Win-Win growth between major company and small and medium business. However material staff who works in the field based on this law has difficulties with material securing quality, JIT(Just In Time), cost push. This study reclassified procurement items of "the direct market purchase system" reasonably and then suggested performance criteria for evaluation. The suggested result will contribute to vatalize the direct market purchase system.

A Fundamental Study on the Causes of Defects in Landscape Construction Projects Based on the Ratio of In-House and Supplied Materials -Focused on Incheon Metropolitan City- (조경공사업에서 관급자재·사급자재 비율에 따른 하자 원인에 대한 기초연구 -인천광역시 사례를 중심으로-)

  • Sang-Won Hwang;Sung-Jin Yeom;Chung-In Park
    • Journal of Environmental Science International
    • /
    • v.32 no.11
    • /
    • pp.821-831
    • /
    • 2023
  • Recently, landscaping construction has played a significant role in enhancing the quality of life for citizens by creating and maintaining outdoor spaces. However, landscaping projects vary in material procurement depending on the contracting method, and they also present various challenges in defect occurrence and defect rectification due to their specialized nature. In this study, we classified different types of projects based on material procurement ratios and conducted on-site assessments of defect status by specific processes. We also analyzed the itemization of material ratios and defect rectification costs. The results revealed it was found that projects with a higher proportion of government-provided materials had the poorest defect status in terms of planting works and also incurred the highest defect rectification costs. Moreover, conflicts concerning the responsibility for defects arose. Currently, there are no specific guidelines for setting standards for the proportion of government-provided materials in landscaping construction contracts. Furthermore, there is ambiguity in the management of defect rectification. Therefore, it is necessary to establish a systematic landscaping construction contracting framework by providing institutional guidelines tailored to local governments or the circumstances of contracting entities and to conduct thorough reviews of construction processes.

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF