• 제목/요약/키워드: construction labor productivity

검색결과 178건 처리시간 0.03초

구조방정식 모형을 이용한 노동생산성 저하요인의 영향 분석 (A Study on the Analysis of Factors Influencing Labor-Productivity using Structural Equation Modeling)

  • 곽동진;임진식;권경수;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.187-188
    • /
    • 2013
  • Meanwhile, the importance of managing factors affecting labor productivity has been recognized and emphasized. However, in the previous study, qualitative evaluation only took place for these factors. In this study, therefore, identified and quantified the priority of factors decreasing labor productivity, and established basic data.

  • PDF

건설현장에서 외국인 노동자의 생산성에 관한 연구 -생산성 및 생산성 저해인자 평가를 중심으로- (A Study on Productivity of Foreign Labors in Domestic Apartment Construction Site -Focused on Evaluation of Productivity and Productivity Impediment Factor-)

  • 최희복;신윤석;강경인
    • 한국건축시공학회지
    • /
    • 제5권1호
    • /
    • pp.75-79
    • /
    • 2005
  • The Korean society faces a new issue of accepting foreign workers. Foreign labors in construction industry reached about 400,000 recently. Thus they have become one of the essential resources to fill up insufficient labor supplies in construction industry. And it is important how to manage foreign labors efficiently. However there are few studies focused on this subject. Purpose of this study is to research productivity of foreign labors in the domestic construction site. So investigate the value of foreign labors. Also this study forecast elements effect on foreign labors productivity in the construction industry. And research what element is more important to improve productivity and what element is more difficult to manage. In the result, this study is expected to prospect effective method of foreign labor's management in the domestic construction industry, so contribute to utilize foreign labors more efficiently.

외국인 근로자의 심리적 생산성 요인 분석 (The Analysis of the Psychological Productivity Factors of Construction Foreign Laborers)

  • 양기남;신대웅;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.200-201
    • /
    • 2015
  • As manpower shortage of national construction site is continuing, a manpower of foreign laborers are steadily increasing. The construction industry impacts the purpose for productivity of laborers as labor-intensive industry against different industry. Therefore, there is a need of analysis of foreign laborer's productivity. This study analyzes to use foreign labor's psychological productivity factors as a basic standard by comparing to Korean's. Construction foreign laborers seem to put bigger priority on "accomplishment of task," and "job satisfaction," than Korean workers, according to the response results in Likert 5-point Scale Measurement with 11 kinds of psychological causes in theories regarding productivity factors. Thus, this study expects to use as baseline data for productivity management of construction foreign laborers.

  • PDF

건설업 실태분석을 통한 건설업생산성의 발전전망에 관한 연구 (A Study on the Development Prospects of Building Construction Productivity through Construction Status Analysis)

  • 박홍태;전준태;이양규
    • 한국재난정보학회 논문집
    • /
    • 제8권3호
    • /
    • pp.242-257
    • /
    • 2012
  • 우리나라의 인구변화의 양상은 사망률의 감소, 평균수명의 연장으로 고령화, 여성화 추세이며, 더불어 출산율의 저화와 고령화 인구의 비율이 더욱 증가되고 있다. 어려운 인력수급으로 건설노무자는 외국인에 의해 충원되고 있으며 미국, 유럽, 중국 등과 FTA의 체결로 노동집약적 산업이 쇠퇴하면 건설노무자의 일자리는 지속적으로 줄어들게 된다. 이것은 건설 기능인력의 부족현상과 기능 인력의 노무비 증가로 국가의 경제적 사회적 환경에 중대한 영향을 주어 건설업 생산성 저하의 주요 요인이 되고 있다. 따라서 이 연구는 건설업 생산성을 위해 최근 자료로부터 국내 건설경기 동향, 산업별 생산성 지수, 산업별 취업자 추이, 연령 계층별 기능인력 추이, 여성 기능 인력 추이, 노동시간 추이, 외국노동자 인력 추이, 건설업의 수주동향 분석, 업체규모별 수주동향, 건설경영분석지표로부터 노동생산성에 관한 종업원 1인당 부가가치 분석으로 건설업생산성 발전전망을 제시하였다.

On-Site Manpower Increasing Impact on Labor Productivity

  • Chang, Chul-Ki
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.139-147
    • /
    • 2005
  • During a typical construction project, a contractor nay often find that the time originally available or normally expected to perform its work has been severely reduced. To finish the project by the completion date, the contractor is forced to find a way to speed up the progress of its work to compensate for the reduction in available time. The most frequent initial reaction of contractors to this situation is to increase on-site manpower by working longer time (overtime), adding more workers (overmanning), or implementing shift work (shift work) to increase the rate of progress. The goals of this study were to investigate how these three methods affect labor productivity and to quantify their impact on labor productivity by analyzing real project data collected from sheet metal contractors and mechanical contractors in the US.

A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF

시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석 (Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction)

  • 하기주;최민권;이동렬;하민수;하재훈;김외곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

PDA 및 바코드 기술을 이용한 건설 노무정보의 수집 및 활용 (Collection and Utilization of the Construction Labor Information Using PDA and Barcode)

  • 오세욱;김영석;이준복;김한수
    • 한국건설관리학회논문집
    • /
    • 제5권5호
    • /
    • pp.65-75
    • /
    • 2004
  • 건설 프로젝트에 있어 노무관리는 주요 공사관리 요소임에도 불구하고 다양한 사업주체의 참여, 작업공정의 복잡성 및 일회성 채용 방식 등으로 인하여 효율적으로 운영되지 못하고 있는 실정이다. 대부분의 현장에서 수집되고 있는 노무정보들은 해당 현장의 기간별 노무자 투입정보 및 노무비 지급을 위한 공수 산정의 기초 자료로 활용될 뿐, 단위작업과의 연계를 통한 다양한 공사관리 정보로 활용되지 못하고 있는 한계성을 지니고 있다. 건설 프로젝트를 수행함에 있어 단위작업을 중심으로 발생되는 노무자의 작업정보는 해당 프로젝트의 생산성, 공정 및 원가정보와 연계되는 원천데이터로 정의될 수 있으므로 보다 적극적인 노무관련 정보의 수집과 가공을 위한 관리체계의 개발이 요구된다. 따라서 본 연구에서는 정보기술을 활용하여 단위작업을 중심으로 발생되는 노무관련 정보를 수집하고 이를 생산성 데이터로 가공하여 공정 및 노무비용과 연계하는 정보기술 기반의 노무정보관리 시스템을 제시하고자 한다.

한국 건설 산업 생산성의 국제경쟁력 분석 (An Analysis of the International Competitiveness of Productivity in the Korean Construction Industry)

  • 원종성;이강
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.75-83
    • /
    • 2008
  • 2003년 이전 국내 건설 국제경쟁력 비교연구에서 우리나라 건설 생산성이 미국, 영국, 일본 등의 선진국에 비하여 낮은 것으로 보고되었다. 그러나 2003년 이후 우리나라 해외 건설수주 물량도 매년 크게 늘고 있으며, Petronas Tower, Burj Dubai와 같은 세계 최고층 건물을 수주, 건설하는 등 양적 질적으로 괄목할 만한 발전을 이루고 있다. 이 시점에서 우리나라 건설생산성의 현주소를 재평가할 필요성이 있다. 본 연구에서는 우리나라와 해외선진국과의 건설생산성을 비교하여 우리나라 건설산업의 국제경쟁력을 평가하고자 한다. 국내 통계자료와 외국 통계자료를 바탕으로 노동자 1인 기준 단위시간동안 생산하는 총 공사액을 분석하여 각 국의 건설노동생산성을 측정하고 한국과 일본의 완공된 건축물을 대상으로 층당 소요되는 공사일수와 건축물의 지하층비율을 분석하여 시공경쟁력을 평가하였다. 분석결과, 우리나라의 건설생산성이 아직 건설 선진국인 미국이나 일본보다는 뒤쳐져 있으나 영국보다는 앞서는 것으로 분석되었다.

보 철근공사 조립공법별 작업시간분석 (Work Time Analysis of Rebar Fabrication Method in Beam Construction.)

  • 김주용;김민규;김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.8-9
    • /
    • 2019
  • The rebar work is a labor intensive construction work with a high labor cost ratio. It is difficult to manage the productivity, construction time, and safety of rebar work. The problem of productivity decreased in rebar construction is due to a lack of workers according to the aged workers. Partial prefabrication rebar can be an alternative solution to productivity decreased in rebar work. The characteristic of partial prefabrication method is that time consuming component such as stirrup of beam assemble in factory and others assemble in site. Therefore, in this study, the time required for each rebar assembly method is measured and analyzed to confirm the possibility of productivity improvement.

  • PDF