• Title/Summary/Keyword: construction information model

Search Result 2,174, Processing Time 0.03 seconds

A Study on the development of Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.3
    • /
    • pp.69-76
    • /
    • 2009
  • The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.

  • PDF

A Field Survey on the Development of Safety Management Information System in the Construction Management (건설사업관리(CM) 안전관리 정보시스템 개발에 관한 조사연구)

  • Kim, Young-Soo;Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.2
    • /
    • pp.75-87
    • /
    • 2004
  • This study suggests a safety management model for construction management (CM) suitable to domestic conditions so that inefficiency resulted from the operation of construction projects by public and private indtitutes according to different systems can be eliminated for the securing of systematic and efficient safety managment. Based on the suggested safety management model, this study also develops a safety management information system that can efficiently and consistently manage and maintain a large quantity of information, and give necessary supports in a speedy way in the managing of construction projects.

Exploring Effective BIM Workflow Among Practitioners by Technology Acceptance Model: A Case Study on the Construction of Facade

  • Guo, Jingjing;Yang, Jinze;Peng, Senlin;Mao, Chao
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.201-209
    • /
    • 2017
  • Facade structure system plays an important role in modern architecture and design. Many contractors start using Building Information Modeling (BIM) to help design and lay-out façade walls in recent years. However, there are still some users refuse to accept BIM on façade construction. Therefore, we employed Technology Acceptance Model (TAM) to assess the users acceptable of BIM work flow, with using a practical case of facade construction in Chongqing Wanda City. The factors that will affect the builder's decision of whether using BIM or not when construct façade, and the relationship among them will be found via this model. Through the analysis using TAM, this research found that the direct factors influencing the completely acceptance of BIM in façade construction is the BIM quality and Result Demonstrating, and the parameter impacting the intuition engendering is the Exterior Condition. Therefore, this paper proposes a more systemic model of BIM acceptance in curtain wall to analyze the user's acceptance. The solution can also offer a reference for future research and construct on façade structure. The acceptance model has the significance that it can help to analyze the reason why users refuse to use BIM in façade construction, thus to help users accept BIM.

  • PDF

A Study on the Framework of the Continuous Improvement Model of Construction Process using Construction Failure Information (건설실패정보를 활용한 건설 프로세스의 지속적 개선 모델의 개념적 틀에 관한 연구)

  • Jeon Yong-Seok;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.195-204
    • /
    • 2005
  • The construction failures can be decreased by continuously improving the construction process based upon the information of construction failures. Herein, the information of construction failures can be utilized as the key factor far identifying the ineffective process and providing the improved construction process that can prevent failures. The objective of this research is to suggest a model for improving construction process continuously by using the information of construction failures. An extended review and analysis of literatures related to the construction failure are performed to investigate the definition, type, cause, and lesson teamed of failure. This research also identifies that process modeling methodology and case-based reasoning are applicable to the construction process improvement, and then it suggests a framework of CIMCP(continuous improvement model of construction process based on the module of case-based reasoning such as case retrieval, case index, and case adaptation.

Improvement Model of Defect Information Management System for Apartment Buildings (공동주택에 대한 하자정보 관리시스템의 개선 모델)

  • Kang, Hyunwook;Park, Yangho;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.13-21
    • /
    • 2019
  • The purpose of this study is to suggest an Improvement Model of defect information management system. The improvement model adapts methods for the residents to input defect information correctly and share to defect information with construction company. The adapted research method is review for existing defect information management system and suggested for data flow diagram of improvement model. The results of this study are as follows: The basic design of the information input window of the defect information management system for connecting with big data was made. And 5 point scale was applied to evaluate the convenience, simplicity, accuracy, necessity, and usability of the improvement model. It is evaluated that the economic effect caused by using the improvement model is saved by about 151 million KRW compared to the existing method. The Improvement model is used utilize big data in correct defect management and decision making.

An Evaluation Model for the Expected Value of the Construction Project Management Information System (건설관리 업무의 정보시스템화 기대가치 평가 모델)

  • Hwang In-Ae;Yoo Jung-Ho;Song Sang-Hoon;Yoo Won-Hee;Park Jong-Won;Kim Woo-Young;Lee Hyun-Soo;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.541-544
    • /
    • 2003
  • The Information System(IS) planning for construction project management must be performed through decomposing the construction management business process upon considering the information technology in a construction company. Following this background, this paper proposes a model for evaluating the expected value of IS planning for construction project management. The model is made to analyze the effectiveness and to evaluate the opportunity of IS planning for task and information, then finally to quantify the value. Lastly, this model can be used to plan IS for construction project management.

  • PDF

Development of Information Management Model for Construction Electronic Manual using Collective Intelligence (집단지성을 활용한 건설 전자매뉴얼의 정보 관리 모델 구축)

  • Park, Moon-Seo;Kim, Jung-Seok;Yu, Jung-Ho;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.62-72
    • /
    • 2011
  • As the construction industry is becoming large and complex, it is difficult to understand the overall business workflow and provide the required information. Accordingly, researches on the introduction of Interactive Electronic Technical Manual (IETM), used in manufacturing/maintenance industry, is being carried. In the case of construction projects, Frequent changes of relevant information occur according to changes in the project environments, so it is difficult for administrators to gather and organize the information. Therefore, this research suggests the Information Management Model for Construction Electronic Manual using Collective Intelligence to support the information changes, by expand the information mangers from the system administrators to the whole users and verify the model by applying the model to Urban Regeneration Electronic Manual.

Development and Application of Failure-Based Learning Conceptual Model for Construction Education

  • Lee, Do-Yeop;Yoon, Cheol-Hwan;Park, Chan-Sik
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.11-17
    • /
    • 2011
  • Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning conceptual model.

DEVELOPMENT AND APPLICATION OF FAILURE-BASED LEARNING MODEL FOR CONSTRUCTION TECHNOLOGY EDUCATION

  • Do-Yeop Lee;Cheol-Hwan Yoon;Chan-Sik Park
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.99-106
    • /
    • 2011
  • Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning model

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantit (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • 박홍태;박찬정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF