The management of defects in barracks facilities is carried out in such a way that defects found by the facility's manager are listed and requested to be repaired by the contractor. However, the standards and methods for the inspection of defects in the management of these defects are not specified in detail, so it is difficult to check the defects in detail. In response, the study first analyzed the current status of the number of defects that occurred in 2021 at official residences and barracks of certain units. As a result of the analysis, the number of defects that were not taken care of and that were not taken until the previous month was more than 10 cases on average per month. In order to reduce the number of such defects, major improvements in the field, timing, and safety inspection were found after the inspection of the military's facilities and safety, and the analysis of the manual of maintenance management. In addition, items for improvement of the checklist were derived through an analysis of the repair of defects caused by the unit's official residence and a total of 10 barracks facilities. Based on this, a checklist was proposed to manage defects in barracks facilities through interviews with military facility managers.
본 연구는 교정시설에 대한 시설관리자 측면의 요구사항 도출 및 중요도 분석을 목적으로 수행되었다. 이를 위해 2000년 이후 준공된 교정시설 11곳을 사례대상으로 선정한 후, 선정된 교정시설의 시설관리자에 대한 설문조사를 통해 요구사항을 도출하였다. 이렇게 도출된 요구사항을 기초로 시설관리자 설문조사를 통해 중요도 지수조사한 후 AHP기법을 활용하여 요구사항의 중요도를 분석하였다. 상기와 같은 목적과 방법에 따라 진행된 본 연구의 결론을 요약하면 다음과 같다. 1) 교정시설에 대한 시설관리자 측면의 요구사항은 배치 및 동선, 건축마감, 기계설비, 전기설비의 총 4가지 분야로 도출되었다. 2) 각 분야별 요구사항의 중요도 분석 결과를 정리하면 다음과 같다. 배치 및 동선분야는 건물배치계획(10.9%)이 주요 요구사항으로 선정되었다. 건축마감분야는 차음성개선(14.1%)이 주요 요구사항으로 선정되었다. 기계설비분야는 개별 냉 난방시스템 구축(11.9%)이 주요 요구사항으로 선정되었다. 전기설비분야는 제어장치 개선(12.2%)이 주요 요구사항으로 선정되었다.
고속도로 신설 및 확장공사는 국가의 기반시설을 설치하기 위한 대규모 공공사업으로 정확한 산출근거에 의해 공사비용을 산정하여 적정 예산을 책정하여야 한다. 그러나 현재 고속도로 신설 침 확장공사의 구조물 해체 비용은 단지 구조물 설치 비용에 표준품셈에 명기된 일정 비율($10\~70\%$)을 곱하여 산정되고 있다. 해체 비용 산정에 이용되고 있는 표준품셈 상의 일정 비율은 과거 실적데이터를 기반으로 구축된 것이 아니라 해외 산정방식을 참고로 공사 관리자의 주관적 경험을 적용하여 도출된 것이다. 설치비에 일정비율을 곱하여 해체 비용을 산정하는 기존 방식은 프로젝트의 특성 및 건설현장의 주변 여건을 고려할 수 없으므로 노무량 및 장비 투임량의 변화를 고려할 수 없는 문제점을 가지고 있다. 따라서, 본 연구에서는 다양한 현장 조사 및 실측을 통한 해체 공사비 원가 분석을 수행하여 구조물 해체를 위한 적정원가 산정기준을 제시하고 기존 비율단가 적용방식의 적정성을 검토하고자 한다.
This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.
시공 현장 일단위의 진도 관리는 프로젝트 전체의 일정 관리와 성공적인 건설 프로젝트 완료에 상당한 영향을 미친다. 그러나 현재의 현장 진도 관리는 작업 담당자에 의하여 수기로 작성되기 때문에 객관적 입장의 유지가 어렵고, 일과 후 추가업무로 작성되어 내용의 누락 등 오류가 발생하는 경우가 있다. 인적 오류로 인한 잘못된 기록 작성의 문제를 해결하기 위하여 기존 연구들은 객체 인식 기반 현황의 시각화 또는 자동 BIM 데이터 수정 기술을 개발하였다. 그러나 특정 장비의 사용 또는 고정된 위치에서 장비사용을 전제로 하는 방법적 한계로 인하여 건물 시공 현장 전체를 파악하는 데에는 제약이 있다. 이러한 한계를 극복하기 위하여 본 연구는 작업자가 휴대하는 스마트기기를 활용하여 촬영한 사진의 객체 인식 기술과 WIFI 기반의 실내 사용자의 측위 기술을 활용하여 추출된 정보를 BIM 데이터의 속성으로 반영하고 즉각적인 현황 파악과 향후 지속적 데이터 활용이 가능한 방법을 제안한다. 실제 시공 현장 관리에 적용 가능한 방법과 기술의 성능을 확인하였고, 기존 개발된 기술 대비 실용도가 높아 건설 현장 관리의 신속화와 정보 작성과 처리의 정밀화에 이바지할 것으로 기대된다.
TBM으로 시공되는 터널은 기계에 의해 전단면 굴착(full face tunnelling)이 이루어지므로, 굴착면에 접근하는 것이 매우 제한적이다. 이러한 한계를 극복하고 TBM 터널에서 굴착면 전방의 지반상태를 정확히 예측할 수 있는 기술은 매우 드물다. 본 연구는 TBM에서 전기비저항을 사용하여 굴착면 전방의 이상지반을 예측할 수 있는 TBM 비저항 예측(TRP)시스템을 개발하고, TBM 현장에서의 적용성과 예측 정확성을 검증하기 위해 EPB 쉴드 TBM으로 시공 중인 지하철 터널에서 현장 실험을 수행하였다. TBM 비저항 예측 시스템은 전극을 사용하여 지반의 전기비저항을 측정하고, 이를 바탕으로 역해석을 수행하여, 이상지반의 위치와 두께 및 전기적 특성을 예측한다. 전극이 부착된 강관을 유압으로 굴착면에 압입하여, 전극이 지반과 완전히 접촉하도록 장치를 제작하였다. 또한, 전극이 챔버 내부를 관통하여 나아가도록 하는 동시에 토사유출을 방지하도록 설계하여 현장에서의 전방예측을 가능하게 하였다. 1차 실험 결과, 굴착면 근접 지반과 굴착면 전방 지반의 전기비저항 및 유전율이 동일하게 나타나 이상지반이 존재하지 않음을 예측하였다. 2차 실험 결과, 굴착면 전방 약 1 m 지점부터 상대적으로 낮은 유전율 비를 가지는 이상지반 구간이 약 5 m 길이로 존재함을 예측하였다. 이는 각각 지표에서 물리탐사 또는 시추를 통해 조사된 지반상태 및 TBM 굴착 중 예측 구간에서 반출되었던 버력을 관찰한 기록과 잘 일치하였다.
본 논문에서는 국내 외 관련 문헌 자료 및 규정에 대한 고찰과, 20년 이상 된 수조 구조물 현장의 사례 조사를 통해 수밀 콘크리트와 침투방지재의 염소이온 투과에 대한 실험적 평가 등을 통하여 결론을 도출하고. 방수층 및 부식저항기술을 음용수조 구조물(상수조 등)의 각 시설물별 방수 방식에 대한 성능을 동시에 만족하여야 할 필요성을 정립하는 것이다. 이는 수조 구조물들이 방수 및 침투방지재가 확실히 필요하다는 사실을 확언 할 수 있고, 또한 여러 가지의 콘크리트 침식을 발생시키는 요소와 원인들에서부터 장기적인 내구성을 화보할 수 있다.
This study aims to investigate and analyze the overall recognition of the photovoltaic system for the application of BIPV(Building Integrated Photovoltaic) in Korea. For this purpose, a survey was carried on through questionnaires answered by 6 groups of experts such as construction engineers, registered architects, mechanical engineers, electrical engineers, university or college professors, and others who are ranked high in their companies or universities or colleges and who mostly seem to be eager to participate in the development of the PV system and to make a business of the system. The results of the survey are as follows: 1. About 95% of those experts who answered the questionnaire have known about renewable energy, and 93% of them are interested in solar energy as alternative energy 2. Host experts have a lot of information on the solar energy system, but have scanty information on the PV system. 3. The experts in the educational and research field have researched for the reasonable period of the participation in the development of the PV system and the period of making a business of the system. They judge that companies in the mechanical and electrical field will participate in the development of the PV system and will make a business of the system in 5 years. 4. The experts have thought that the PV system is designed not for economy but for the environment of the earth and that PV system technology in Korea is much lower than that in the advanced countries. 5. The experts hesitate to participate in the development of the PV system and to make a business of the system because they have little confidence in the economy of the PV system now and because they have thought that they will bear a great financial burden of construction cost 6. The experts judge that it is most desirable to apply the PV system to the rooftops of buildings. And they are greatly interested in the BIPV.
건설 현장의 자재 위치 추적 기술은 건설 프로젝트의 생산성을 극대화시킬 수 있는 중요한 기술로서 현재 국내외적으로 많은 연구가 수행 중에 있다. 최근 들어 RFID(Radio Frequency Identification) 시스템을 이용하여 공급 사슬망 전반에 걸친 건설 자재에 대한 실시간 위치 추적에 대한 연구가 각광을 받고 있다. 그러나 짧은 인식거리, 저조한 인식율등의 문제로 바코드 대체 수준으로 그 활용이 미비한 상황이다. 본 논문에서는 인식거리르 보다 길게 하는 900MHz 대역의 RFID 시스템과 인식된 데이터를 무선 통신(Zigbee)을 사용하여 전달하는 RFID/USN 연동시스템 개발과 그 활용 방안을 제안한다. RFID/USN 연동 시스템을 건설현장의 자재관리에 시험적으로 적용, 실중 테스트를 수행함으로써 첨단 센싱 기술 및 전파식별 기술에 대한 현장 활용 가능 여부, 실증 테스트 시 발생하는 기술적 애로 사항 및 다양한 활용 방안을 도출하는 것을 목적으로 한다. 또한 원격지에 있는 현장 관리자를 위하여 기존 인프라네트워크를 이용하여 실시간 자재 및 장비의 위치 데이터를 관리자가 원할 경우 언제 어디서든 실시간으로 전달 가능하도록 이동통신망(CDMA: Code Division Multiple Access)과의 연동 시스템을 현장에서 적용 및 점검한다.
노후 콘크리트포장의 가장 일반적인 보수 방법은 복합 구조체 포장구조인 접착식 덧씌우기 방법이 일반적으로 사용되고 있으며, 이와 같은 복합 구조체는 신 구 콘크리트 간 부착력에 따라 공용 중 차량하중, 환경하중 하에서 일체화된 역학적 거동의 확보유무에 따라 장기 공용성 확보에 커다란 영향을 받게 된다. 현재 상용화 되고 있는 접착 덧씌우기 공법들은 우수한 신구 접착력을 확보하기 위하여 다양한 장비를 이용한 경계면 처리 방식과 더불어 재료자체의 접착력을 향상시키고자 폴리머 등의 혼화재료를 사용하고 있다. 그러나 이들 공법들은 현장 적용 시 객관화된 명확한 적용기준 없이 각 공법에서 제시하고 있는 시공장비 및 사용재료에 의존하여 적용 중이며 이러한 각 개별공법의 기준으로 인하여 현장 관리자들의 품질관리에 어려움이 있는 실정이다. 따라서 본 연구에서는 신구 콘크리트 간 부착력 확보에 가장 핵심적인 현장요소인 경계면 처리 방식과 재료의 부착력 확보에 가장 크게 기여하는 폴리머 함량을 변수로 현장시험을 실시함으로써 시공 전 기존 면처리 공정에서의 효과 분석 및 폴리머 혼입률 변화에 따른 부착강도 성능과의 상관성 검토를 통하여 부착강도의 성능을 개선 할 수 있는 현장시공방법을 도출하고자 하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.