• Title/Summary/Keyword: construction expenses compensation

Search Result 9, Processing Time 0.025 seconds

The study on the depreciated compensation system for residual land (잔여지 감가보상에 관한 연구)

  • Park, Yong-Han
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.8 no.2
    • /
    • pp.307-312
    • /
    • 2013
  • The compensation system for residual land in our country is largely composed of the three sub-systems, that is, the purchasing compensation, depreciated compensation and construction expenses compensation. Among those, the purchasing compensation system mainly has problems in eligibility for compensation of the land, meanwhile, there is almost no problem in construction expenses compensation system. This study aims to examine the current depreciated compensation system for the residual land and its accompanying problems, and also review and compare those systems in USA and Japan with that of our country, and thereby discover the ways for the alternative solution for the compensation system in the viewpoint of policy.

3차원 두부방사선 규격사진 구현시 컴퓨터를 이용한 두부위치의 보정방법에 관한 연구

  • Choy, Kwang-Chul;Kim, Kyung-Ho;Kim, In-Dal
    • The Journal of the Korean dental association
    • /
    • v.36 no.2 s.345
    • /
    • pp.135-143
    • /
    • 1998
  • Cephalogram is one of the most important tool in researching growth and development of craniofacial area, orthodontic diagnosis and treatment planning. But its inherent distortion of actual length and angles during projecting three dimensional object to two dimensional plane might cause errors in quantitative analysis of shape and size. three dimensional high quality images can be obtained using computerized tomogram and have reported in literatures. Considering its expenses and amount of exposure to radiation, limitations still remain to be solved in its application to routine practice. construction of three dimensional image using principle of orientator can be obtained by biplanar stereoradiography. Theoretically two images, lateral and P-A can be used to construct three dimensional image provided that those are taken at same time by two different focal spots. As two images(lateral and P-A) obtained by conventional cephalogram have different head posture, those need compensation to construct three dimensional images. This study introduced principle of computerized head posture compensation and showed that conventional cephalogram could be used to construct three dimensional image and could be applied to routine orthodontic practice.

  • PDF

Investigation of job-related back injuries reported in the Pohang region (포항지역 사례를 중심으로 한 직업성 요통재해 현황 조사에 대한 고찰)

  • 최경임;정민근;민경록
    • Proceedings of the ESK Conference
    • /
    • 1996.04a
    • /
    • pp.91-97
    • /
    • 1996
  • This study is to analyze trends of back injuries reported for medical expense compensation in a territorial jurisdiction of Pohang regional office of Ministry of Labor. Back unjuries claimed in the Plhang region accounted for approximately 15% of all industrial accident and 0.96 billion won were spent to compensate for medical expenses in 1994. A majority of back injuries occurred in manufacturing, construction, and transportation, and, 98% of all back injuries during 1992-1994 were strain/sprain, herniated inter-vertebral dise(HIVD), and fracture. To achieve and effective back injury prevention, supplenentary reporting form should be provided to include the information about job description (e.g., weight of an object, task duration and working posture), employee's medical and work history, and working conditions.

  • PDF

A Study on Business Value for the Creation of a Private Park regarding Long-term Non-executed Urban Parks - Focused on Long-term Non-executed Neighborhood Park in Gwangju Metropolitan City - (장기미집행 도시공원의 민간공원 조성을 위한 사업성 연구 - 광주광역시 장기미집행 근린공원을 중심으로 -)

  • Kim, Ho-Gyeom;Kim, Dong-Chan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.81-91
    • /
    • 2016
  • The study shows solutions of long-term unexecuted urban park and activation plans to facilitate the business promotion of Private Park Developers. This study conducted a feasibility analysis to determine if the business of a special case is applicable. The result of this study is as follows about three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park. First, the three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park are the forest type Neighborhood Parks. Businesses of a special case's park developing cost(average 0.4%) have a relatively low percentage. It is most affected by Land Compensation(average 33.8%) and building construction expenses(average 59.1%). Second, long-term unexecuted urban parks' Land Compensation and building construction expenses seed capital are excessive. The Bongsan Park balance floor space index is 179 percent; a reasonable profit floor space index is 220 percent. The Mareuk Park balance floor space index is 351 percent; a reasonable profit floor space index is 420 percent. The Jungoe Park balance floor space index is 327 percent; a reasonable profit floor space index is 400 percent. Third, to facilitate the business of special cases in deliberating, Bongsan Park should change its second class general residential area. Jungoe Park must change the quasi-residential area and semi-residential area. Mareuk Park must change the general commercial area. In this way, the feasibility of promoting private park projects will be improved.

Construction Plan of 3D Cadastral Information System on Underground Space (지하공간 3차원 지적정보시스템 구축 방안 연구)

  • Song, Myungsoo;Lee, Sungho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.57-65
    • /
    • 2014
  • Recently, Construction business is changing from on the ground to underground space because of deficit of developing space, creation of green space and of incremental of land compensation expenses. Meanwhile, 3D Topographic, Marine and Cadastral maps need to have Spatial Interrelation. Also, understanding of the information is also needed. Spatial information object registration system is impossible to contact and understanding intelligence mutually because the former one is managed as automatic ID system. Therefore, 3D Object information ID System of underground space is managed based on Object Identifier. Construction of Spatial information integration ID System is required and it will offer Division Code (Ground, Index, Underground) and depth information. We are defined and classified Under Spatial Information in this paper. Moreover, we developed the integration ID System based on UFID for cadastral information Construction. We supposed underground spatial information DB Construction and a developed the way of exploiting 3D cadastral information system through the study. The research result will be the base data of Standard ID system, DB Construction and system Development of National spatial data which is considered together with spatial interrelation.

A Study on the Domestic and Foreign Laws connected with Landscape Plant and Planting (조경식물의 식재 관련 국내.외 법제도에 관한 연구)

  • 신익순;김영수
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.1
    • /
    • pp.47-61
    • /
    • 1997
  • This study was conducted to grasp the present condition of the name and the related text of the domestic laws (97 statutes, 1 examination, 1 guide, 3 ordinances, 1 leading case) in force which were connected with landscape plant and planting. Examining the general tree-planting system of America, the related foreign laws(1 constitution, 44 statutes, 31 ordinances, 6 leading cases) were arranged in the name and the text and classified by nations of regional groups and it was considered to the mutual relation with lots of laws which are scattered with the various laws. To examine the points at issue of the related domestic laws and to study the related foreign laws, the remedies for the domestic laws being at issue were proposed. That is : A change of the landscape planting concept, the introduction of the landscape planting cost compared with the total construction cost, the unification of the landscape planting ordinances as the unit of city, the clarification of the completion period for the depect of the replaced trees. putting the conservation and production of the top soil under an obligation the adoption of a licence system for the tree planting within the river area, the introduction of the allotment system for landscape architectural expenses, the encouragement of making a hedge, the settlement for the problems of the trees loss compensation, the necessity for the quality test to the landscape planting works, the intensification of the punitive rules to the illegal felling and planting of the trees in the greenzone area, the application of the Labor Standard Act to the landscape planting laborers. The laws relating to landscape plant and planting are prescribed dispersedly in the many other related laws and it is concluded to be impossible for the legislation of the singular law which is applied uniformly to the department of the tree-planting. Hereafter it should be required to analyze concretely in detail the each text of the related laws by means of the joint studies between the professional landscape architects and the lawyers.

  • PDF

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 - (부울경 광역도시철도망 구축 필요성에 관한 연구 - 국도 7호선 중심으로 -)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.771-778
    • /
    • 2011
  • Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.

A Feasibility Study on Acquisition System of the Urban Parks under the Special Use Permit - Focused on the Neighbourhood Parks Unexecuted in Long-term in Suwon City - (도시공원에서의 개발행위 특례 적용을 위한 사업수지분석 연구 - 수원시 장기미집행 근린공원을 중심으로 -)

  • Kim, Sung-Yong;Lee, Chang-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.38 no.4
    • /
    • pp.54-63
    • /
    • 2010
  • The recently-introduced Special Use Permit system is an exceptional approval system for private park developers to develop unexecuted urban park sites into urban parks with the implementation of profit-generating businesses within the boundary of preserving the original function of the park under an agreement with local authorities. This thesis studies the application of this system. This is a feasibility study of cases that have contributed to the acceptance of intended park sites by developing some parts of park sites as public housing, focused on unexecuted urban park areas for the long term in Suwon City based on the Special Use Permit, and creating other sites as park area. First, it has been judged that realization of business is possible at 300 percents of the floor area ratio in case of flatland neighborhood park which has high appraised land values. It is judged that realization of business is possible within a 10 percents size of private land at 200 percents of the floor area ratio in case of woodland and waterside neighborhood parks that have low appraised land values on the outskirts of the city. Second, through working expenses combining compensation and money for park construction, a balance of business profit can be understood within about 50 percents of total expenditures. Because the public contribution ratio by the Special Use Permit can be presumed as about 50 percents of total expenditures, it implies that windfall profits by the Special Use Permit can be adequately collected.

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF