A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki;Ahn, Bang-Ryul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.37-42
    • /
    • 2008
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan($2004{\sim}2006$) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, 1,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

Analysis and Realistic Estimation of Maintenance Cost of Construction Equipment Expenses (건설기계 경비의 관리비 구성 분석 및 현실화)

  • Kim, Kyung-A;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.503-508
    • /
    • 2007
  • The Equipment Expenses section of the Poom-Saem, that is used for Construction Cost Estimation on public sectors in Korea, has been rarely revised, and so does not reflect changes of construction equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of maintenance costs(Interest, Storage, Insurance, Tax), the equipment expenses section of the Poom-Saem and the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. Based on results from analysing figures related with the estimation of maintenance costs, the maintenance cost is redefined. Then, construction equipment was classified into 6 exclusive construction equipment and general one, and realistic figures of the maintenance cost, which consists of interest, storage, insurance, tax, are suggested respectively. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation that helps to estimate appropriate construction costs and the ground work of related studies.

  • PDF

Estimation of Construction Equipment Expenses - Bulldozer and Loader - (표준품셈의 기계경비 산정 현실화를 위한 자료 조사.분석 -불도우저와 로우더를 중심으로-)

  • Huh, Young-Ki;Kim, Kyung-A;Ahn, Bang-Ryul;Tae, Yong-Ho;Park, Hee-Sung;Kim, Chang-Wan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.155-166
    • /
    • 2008
  • The Equipment Expenses section of the Poom-Saem that is used for Construction Cost Estimation of public sectors in Korea has been rarely revised, and so does not reflect changes of Construction Equipment technology and construction methods, since it was established based on data from Japan and the U.S in the early 1960s. In order to make reasonable estimation of equipment expenses for a bulldozer and a loader, the domestic and overseas documentary records were investigated. Further, 16 construction sites were visited, and 20 Construction Equipment leasing services were surveyed. The optimum level of each item which consists of equipment costs was revealed based on the result of the analysis on the figures of equipment costs calculation from the Poom-Saem and the collected data. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.

Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry (건설업 산업안전보건관리비 사용 실태조사 및 분석)

  • Sung-Yun Kang;Oh-Se Wook;Kim-Chang Won;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.219-224
    • /
    • 2007
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan(2004${\sim}$2006) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, l,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

  • PDF

The Life Expectancy Making Model for Construction Equipment (건설장비 수명결정 모델)

  • Lee, Yongsu;Kim, Cheol Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.453-461
    • /
    • 2012
  • Life analysis is conducted for economic analysis of equipment or facilities. The purpose of life analysis is to predict future indicators for scrapping construction equipment, and establish and utilize a wide variety of business strategies according to data predictions. First, this study shows the methods to figure out average life, life expectancy and life prediction of construction equipment and the analysis of life making methods, using survival curves. Second, the study proposes and examines the life expectancy making model depending on revenues and expenses. The result of the study reveals that the economic life of the same equipment varies with expenses, revenues and the initial cost. The life expectancy making model for construction equipment reflects respective management status for equipment and will help efficient management for companies.

How to Use Standard Market Prices for Ordinary Management System of Construction Equipment Prices in Poom-Saem (시가표준액을 활용한 건설공사표준품셈 건설기계가격 상시관리 방안)

  • Ahn, Bang-Ryul;Huh, Youngki;Kim, Dae Young;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.98-99
    • /
    • 2014
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.

  • PDF

Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material (표준품셈 관부설 및 접합공사 품 개정 요인 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

A Study on the Improvement of Depreciation Management for Construction Equipment Considering Economic Efficiency (경제성에 의한 건설중장비 감가상각관리 개선)

  • Lee, Yongsu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.357-366
    • /
    • 2012
  • Construction equipment has applied to depreciation over the years, however, the price index for construction equipment is not properly reflected in existing quantity per unit and the local tax law. Thus, this study shows the analysis of the corporate tax law, the local tax law and business accounting standards, characteristics of the domestic depreciation system and depreciation methods, and the capital recovery factor of construction equipment applying the theory for economic efficiency. It also presents cases of depreciation on the basis of quantity per unit and tax law using straight-line depreciation method and declining balance method. It is proposed that the relations of the application system of permissible period for construction equipment and the existing system be explained and the application system of permissible period for construction equipment be imposed. Furthermore, it proposes the development of depreciation tables of construction equipment monthly expenses based on the domestic price index and applications. In addition of that, it proposes the analysis of pros and cons of the methods suggested and application limits of the study and subsequent improvement plans. This study should reflect more rational and objective reality in quantity per unit and tax law.

Artificial Intelligence-Based Construction Equipment Safety Technology (인공지능 기반 건설장비 안전 기술)

  • Young-Kyo Lee
    • Journal of Advanced Navigation Technology
    • /
    • v.28 no.4
    • /
    • pp.566-573
    • /
    • 2024
  • Applying autonomous driving technology to construction sites is very difficult due to safety issues. However, the application of various positioning and sensing devices, such as cameras and radars, to construction equipment is very active. Based on these technological trends, the government is making various efforts, including the Serious Accident Punishment Act and support for industrial safety management expenses, to reduce the incidence of accidents caused by construction equipment and industrial vehicles. And, related industries have been developing various safety equipment over the past few years and applying them to the field. In this paper, we investigate the current status of safety equipment-related technologies currently applied to construction equipment and industrial vehicles, and propose a direction for the development of safety technology in construction equipment based on artificial intelligence. Improving the safety and work efficiency of construction equipment based on the technology proposed in this paper should be reviewed through simulation in the future.