• 제목/요약/키워드: construction documents

검색결과 502건 처리시간 0.033초

동영상을 활용한 봉제 교육 연구 (Using Videos as a Teaching Tool in Sewing)

  • 권상희
    • 패션비즈니스
    • /
    • 제26권1호
    • /
    • pp.105-118
    • /
    • 2022
  • This study investigated the effective pedagogical strategies for sewing by examining the efficacy of sewing videos as supplemental learning materials and demonstration tools. Sewing videos were created for face-to-face apparel construction courses, and students' opinions on sewing videos as an educational tool were collected. Videos with subtitles were offered to Apparel Construction Course 1, whereas videos with narration and subtitles were offered to Apparel Construction Course 2. As "supplemental learning materials," students rated videos as more effective for learning and satisfying than "documents with text and images." The effectiveness and satisfaction scores for Apparel Construction Course 2 were significantly higher than those for Apparel Construction Course 1. Furthermore, videos were utilized significantly more than documents, and most students preferred videos over documents. The main benefits of videos as supplemental learning materials were repetitive learning at the learner's convenience and the detailed presentation of the sewing process. Students regarded narration as more effective and satisfying than subtitles. Narrations were expected to be offered along with subtitles. As "demonstration tools," students rated videos as more effective for learning and satisfying than traditional "sewing samples." Students preferred "demonstration with videos" to "demonstration with sewing samples." The main benefits of video demonstration were a close-up view, presentation of the entire sewing process, and shorter wait time without the need for group teaching. Students wanted more sewing videos and narrations to be offered, and various sewing machine feet to be used in the videos. Educational methods for sewing were suggested based on student opinions.

Systematic Literature Review for the Application of Artificial Intelligence to the Management of Construction Claims and Disputes

  • Seo, Wonkyoung;Kang, Youngcheol
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.57-66
    • /
    • 2022
  • Claims and disputes are major causes of cost and schedule overruns in the construction business. In order to manage claims and disputes effectively, it is necessary to analyze various types of contract documents punctually and accurately. Since volume of such documents is so vast, analyzing them in a timely manner is practically very challenging. Recently developed approaches such as artificial intelligence (AI), machine learning algorithms, and natural language processing (NLP) have been applied to various topics in the field of construction contract and claim management. Based on the systematic literature review, this paper analyzed the goals, methodologies, and application results of such approaches. AI methods applied to construction contract management are classified into several categories. This study identified possibilities and limitations of the application of such approaches. This study contributes to providing the directions for how such approaches should be applied to contract management for future studies, which will eventually lead to more effective management of claims and disputes.

  • PDF

RISK FRAMEWORK FOR NEXT GENERATION NUCLEAR POWER PLANT CONSTRUCTION

  • John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.451-458
    • /
    • 2013
  • This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.

  • PDF

1894-1910년 한국과 일본 근대기록구조의 중층성과 종속성 - 전북지역 전략적 인프라구축기록을 중심으로 - (Layered and Dependent Structure of the Modern Official Documents in Korea and Japan (1894 - 1910): Focusing on the Documents Related with the Strategic Infrastructure Construction of Jeonbuk Province)

  • 김경남
    • 한국기록관리학회지
    • /
    • 제15권3호
    • /
    • pp.55-86
    • /
    • 2015
  • 본고의 목적은 1894년부터 1910년까지 한국과 일본 공문서관리시스템의 중층적 종속적 구조를 밝히는 것으로, 기록사료학적 관점에서 분석하고자 한다. 연구대상 시기는 일제가 한국의 기록관리제도를 장악하여 조선을 침탈해가던 시기로서 그 내용은 일본내각과 군부가 대륙침략전쟁을 위하여 한국에 구축한 인프라 관련 기록과 통감부 설치와 관련하여 결재된 원본문서이다. 특히 일본제국이 청일전쟁 동학농민전쟁을 진압하기 위해 전주를 중심으로 한 전북지역에 전략적으로 구축한 인프라기록을 중심으로 검토하였다. 이를 위해 갑오개혁기와 통감부시기에 걸쳐 일본정부가 한국을 지배하기 위해 작성한 정책 예산 인사 결정 관련 상위레벨의 결재 원본 출처와 편성 실태를 밝히고, 한국 내각과 통감부가 작성한 하위레벨 공문서 실태를 분석하였다. 그 결과 본 논문에서는 이 시기 한국의 공문서관리제도는 일국사적 관점에서만 고찰해서는 안되며, 한 일간 수직적 연관구조 속에서 중층적이고 종속적인 시스템 속에서 파악해야 한다는 점을 제기하였다.

조선후기 거창향교의 유지와 관리 (A Study on the Maintenance and Management of Geochanghyanggyo Local Confucian School during the Latter part of Joseon Dynasty)

  • 송혜영
    • 건축역사연구
    • /
    • 제30권2호
    • /
    • pp.45-54
    • /
    • 2021
  • During the latter part of Joseon Dynasty, Local Confucian School(Geochanghyanggyo) had served as a government school and left many official documents on the educational construction. The construction of Local Confucian School(Geochanghyanggyo), which was recorded in official documents, was diverse, and most of them were reconstructed. Construction-works recorded in an official document was drafted in two ways. One was in the same format as the accounting records and the other was written in the diary format by date. The construction cost was mainly financed by selling the land owned. Of course, with the help of the government, they could receive some of the essential timber and expenses for the construction. The management and maintenance of educational construction was entrusted by a manager called 'Chaji(次知)'. Then there were employees called 'Jeonjik(殿直)' and 'Gojik(庫直)' and they were paid for their work.

시소러스 브라우저 자동구현을 위한 Metadata를 이용한 색인어 처리방안에 대한 연구 (A Theoretical Study on Indexing Methods using the Metadata for the Automatic Construction of a Thesaurus Browser)

  • 서휘
    • 한국도서관정보학회지
    • /
    • 제35권4호
    • /
    • pp.451-467
    • /
    • 2004
  • 본 연구에서는 시소러스 브라우저를 자동으로 구성하기 위한 방법에 대한 이론적인 연구와 함께 시소러스 브라우저 구성과정의 핵심인 자동색인과 용어 간 계층을 자동으로 형성하는 클러스터링 알고리즘에 대한 선행 연구결과를 제시하였다. 그리고 웹 문헌에서 전통적인 종이 형태 문헌의 서지사항에 해당하는 메타데이터를 분석하고 이를 처리하는 방안을 조사함에 의해 웹 문헌에서 색인어를 자동으로 추출할 수 있는 방안에 대하여 연구하였다. 또한 대부분의 웹 문헌에 메타데이터가 수록되어 있지 않음에 착안하여 기존의 웹 문헌에 메타데이터 자동 편집기를 이용하여 메타데이터를 수록하는 방안에 대한 연구결과를 제시하였다.

  • PDF

4D CAD와 IETM 연계를 통한 철도시설의 효율적인 공사정보관리 방안 (Methodologies for Effective Construction Information Management of Railway Facilities through Linking 4D CAD to IETM)

  • 강인석;문현석;박서영;김현수;안재규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.139-142
    • /
    • 2008
  • Construction Management by using 4D CAD system analyzes operations information based on 3D and 4D objects. But it is difficult to provide a variety of documents linked by 4D objects in a lump from 4D CAD system based on visual object, and to get an optimal decision-making information to conduct business. Therefore, it is necessary to construct effective construction information management systems and to organize integrated information through linking non-objects to objects. This study suggests methodologies of effective construction management for railway facilities through building of framework for practical application and methodologies to link 4D objects to IETM documents. Accordingly, it is possible to establish a systematic decision-making for an effective construction management of railway facilities, and this provide integrated methodology for linking non-objects to objects.

  • PDF

원전 생애주기 관리대상 기기의 정보 흐름 규명을 통한 설계정보 추적성 구현방안에 대한 기초 연구 (A basic Study on Establishment Plan of Design Information Traceability through Design Information Flow Identification for Controlled Equipment during the NPP Lifecycle)

  • 임병기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.183-184
    • /
    • 2017
  • Some of the information created during the design phase of an New NPP life cycle is useful only for the execution of the construction phase; however, much of the information greatly impacts the longer-term operational phase. To most make use of design and construction information produced by data based design system during the construction and operation phase, This research is identified controlled data and drawn design information of controlled equipment from documents generated during the life-cycle stages. This study aimed to analyze related documents to assure traceability of controlled equipment from design phase through O&M and then suggested DB(Data Base) based control method on technical information of major equipment throughout nuclear power plant lifecycle.

  • PDF

건설공사 안전관리자 업무 분장 실태조사 연구 (A Study on the Actual Conditions of Safety Manager's Work in Construction Projects)

  • 김한얼;안재홍;임형철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.371-372
    • /
    • 2023
  • If the participants in construction site safety management perform their duties in accordance with the provisions of the Industrial Safety and Health Act, the burden on safety managers would be minimal. However, the lack of specific work guidelines for each participating entity and the greater responsibility of the safety and health general manager than the management supervisor have resulted in safety managers' workload being increased due to the problem of management supervisors' neglect of safety management. In this study, we conducted a survey of the safety manager's duties and related documents during the construction project initiation, early stages, ongoing work, and disaster occurrence/investigation, and conducted interviews to improve and enhance the division of duties.

  • PDF