• 제목/요약/키워드: construction disposal

검색결과 361건 처리시간 0.037초

A Study on a High Efficiency Dryer for Food Waste

  • Kim, Bum-Suk;Kang, Chang-Nam;Jeong, Ji-Hyun
    • 동력기계공학회지
    • /
    • 제18권6호
    • /
    • pp.153-158
    • /
    • 2014
  • The food waste that occurs in one year is very high in our country and disposal is expensive. However, disposers for food waste are not used wisely at real life. This is because most of them some kind of problem, for example big volume, complicated construction, high cost, lots of troubles, low energy efficiency and so on. In this study, we propose the new dryer system to decrease drying times by injecting hot air in down the side of the drying bucket. The designed drying bucket has inclined inlet holes down both sides. The inlet holes have variable gradients, we adjust the inlet velocity of the hot air to find a suitable vortex in the drying bucket. We verify the properties of the proposed system though simulation. The results show the proposed dryer system can improve the drying time and save energy for food waste disposal.

친환경 리모델링 철거공사의 경제성 평가 및 사례적용 (Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project)

  • 김윤덕;김기현;차희성;김경래;신동우
    • 한국건설관리학회논문집
    • /
    • 제11권2호
    • /
    • pp.45-53
    • /
    • 2010
  • 건설폐기물의 발생량 증가와 처리방법에 대한 문제점, 그리고 폐기물 처리와 관련한 환경문제들이 사회적 이슈로 논의되면서, 건설폐기물의 처리와 그에 따르는 부차적인 문제점들이 중요한 과제로 대두되고 있다. 건설산업에서 폐기물이 가장 많이 발생하는 단계가 철거공사 단계이다. 선진국의 경우 건설 폐기물의 친환경적인 처리, 재활용률 제고, 재활용 자재의 활용 등 친환경적인 측면의 다양한 연구가 수행되고 있지만 국내의 리모델링 공사의 경우 효율성 위주의 생산성을 강조한 선철거후분리 방식의 철거공사가 실시되고 있다. 이로 인하여, 환경적인 문제뿐만 아니라 폐기물 처리비용 증가 등의 경제적인 문제점이 나타나고 있다. 이러한 문제점들을 해결하기 위해 선행연구인 친환경 리모델링 철거공사프로세스 모델 연구에서 리모델링 공사시 선행되는 철거공사 수행에 있어 친환경 철거관리의 프로세스를 제시하여 분리철거를 통해 철거 폐기물의 재활용률을 높여 친환경 철거공사가 이루어질 수 있도록 하는 연구가 진행되었다. 본 논문은 선행연구에서 제시된 친환경 리모델링 철거공사 프로세스를 바탕으로 실제 건물에 적용하여 친환경 리모델링 프로세스의 경제성에 대하여 평가해 보았다. 또한 도출된 경제성의 평가기법을 실제 사례에 적용한 결과, 친환경 리모델링 철거공사가 재래식 방식에 비하여 경제성이 우수한 것으로 밝혀졌다.

신 분류기준을 적용하기 위한 원전 해체폐기물량 및 처분 비용 산정에 대한 사전 연구 (A Pre-Study on the Estimation of NPP Decommissioning Radioactive Waste and Disposal costs for Applying New Classification Criteria)

  • 송종순;김영국;이상헌
    • 방사성폐기물학회지
    • /
    • 제13권1호
    • /
    • pp.45-53
    • /
    • 2015
  • 1978년 고리 1호기의 상업 운전을 시작으로 현재 우리나라에서는 총 23기의 원전이 운영 중에 있다. 운영 중인 원전으로부터 방사성폐기물이 계속 발생되고 누적되어 갈 것이다. 또한 원전의 수명 연장과 신규 원전의 추가 건설 이외에도 제염해체 연구시설 등 각종 원자력 시설에서 발생하는 방사성폐기물은 꾸준히 증가하고 있다. 우리나라는 최근 IAEA에서 권고하는 신 분류기준을 적용한 신분류기준에 대해 원자력안전위원회 고시를 개정하였다. 중·저준위폐기물을 IAEA 신 분류기준을 적용하여 세분화한다면, 약 98%를 차지하는 저준위 및 극저준위 방사성폐기물과 규제면제폐기물을 효과적으로 처분 할 수 있게 된다. 본 논문에서는 신 분류기준을 적용한 해외 적용 사례와 처분 방안 현황을 분석하여 국내에 적용 가능한 최적의 합리적인 적용 방안 및 해체 방사성폐기물량을 산정해 보고자 한다.

중.저준위 방사성폐기물 처분을 위한 국외 기체발생 실증실험시설 운영사례 분석 (Analysis of Case Studies on Experimental Research of Gas Generation in Foreign Countries for Low- and Intermediate-level Radioactive Waste Disposal)

  • 박진백;이선정;김석훈;김주열
    • 방사성폐기물학회지
    • /
    • 제8권3호
    • /
    • pp.229-238
    • /
    • 2010
  • 중 저준위 방사성폐기물의 처분/폐쇄 이후 기체 발생특성을 실질적으로 평가하고, 이를 이용하여 발생 기체의 종합관리방안을 수립하기 위해서는 실제 처분환경 및 특성을 고려한 장기간의 실증실험이 반드시 필요하다. 이와 관련하여, 국내에서는 월성원자력환경관리센터의 1단계 10만 드럼 처분에 대한 건설 및 운영허가 후속조치의 일환으로 현장부지에 기체발생 실증실험시설이 설치/운영될 예정이다. 이에 대한 기초자료를 확보하기 위해, 세계 각국에서 다양한 방법으로 수행된 기체 발생 관련실험에 대한 제반사항을 면밀히 검토하였다. 그 결과 우리나라와 처분방식이 동일하며, 실제 폐기물 포장드럼 및 기본 처분단위를 이용하여 대규모로 수행된 핀란드의 기체 발생 실험자료를 국내 실증실험에 대한 유용한 벤치마크로 사용할 수 있을 것으로 판단된다.

건설폐기물 자원순환체계 구축을 위한 발생원단위 적용에 관한 연구 (The Investigation on Application of Construction Waste Unit to Establish Resource Recycling System through Case Study)

  • 손병훈;홍원화
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.181-186
    • /
    • 2010
  • Research on construction waste unit was in progress in the 1995 when 'Proper Disposal and Recycling Measures for Construction Waste' was made by the Seoul Development Institute. Such an effort has been made in order to cope with the lack of natural resources in Korea and to utilize the reusable resources. Furthermore, these efforts have also increased due to the improved standing of Korea in the international community. A large number of residential buildings were built in the response to the government's policy by increasing the supply of houses between the 1970's and 1980's. In 2000, more reconstruction and redevelopment was done because of the aged buildings and change of use for those buildings. And the project has been actively promoted until now, which caused a sharp increase in the generation volume of construction waste. In Korea, 8 kinds of construction waste unit, including the standard construction manpower and materials estimation, are introduced. Currently, they provide standards to different building categories and waste properties while for construction sites different standards are applied. This study aims to measure the actual amount of construction waste after sample buildings are dismantled and analyzes the estimation of the waste quantity by using various standard units. Through comparison, this study will figure out the differences among the standard units in order to find out how to apply the standard units properly. Moreover, this research will provide practical measures to apply such units to construction sites.

BIM과 RFID 기술을 활용한 건설 폐기물 관리 방안 (Building waste management plan using BIM and RFID technology)

  • 단신;안이슬;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제12권2호
    • /
    • pp.26-39
    • /
    • 2022
  • The purpose of this study is to establish a novel system for on-site management of construction and demolition waste. Construction waste has always been one of largest waste in the world and has long lacked an effective management system. Although various countries have planned the disposal of waste at the political level, the real-time and effective management of construction sites has not been mentioned. Especially in China, the continuous development of the construction industry also generates a large amount of waste, and China is not prepared for a large amount of construction waste. In order to alleviate the huge impact of construction waste on society and the environment, this study proposes a waste management method that combines Building Information Modeling technology and Radio Frequency Identification technology. Through this research, by using information technology to manage the generation and discharge of construction waste, and record the amount and information of waste generation, also improve the management method of construction waste.

An alternative upstream method for the Zhelamuqing tailings impoundment construction of a Copper Mine in China

  • Wei, Zuoan;Chen, Yulong;Yin, Guangzhi;Yang, Yonghao;Shu, Weimin
    • Geomechanics and Engineering
    • /
    • 제19권5호
    • /
    • pp.383-392
    • /
    • 2019
  • How to safely and economically dispose mining tailings is a challenge to mine operators. This paper presents an alternative upstream method for tailings dam construction, termed as the template construction method (TCM), which has been successfully implemented at Zhelamuqing tailings impoundment since 2004. By the beginning of 2015, the tailings dam wall had reached 95 m in height for the 46 upstream raises, with the total height of the dam including the starter dyke being 128 m. The proposed TCM is relatively simple and cost-effective and provides a good way for constructing rapidly raising tailings dam based on this case.

인산암모늄을 사용한 순환골재의 pH 저감 성능 검토 (Study on Performance of pH Reduction for Recycled Aggregate by Using Phosphate of Ammonium)

  • 고산;이건철;박지웅
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.106-107
    • /
    • 2016
  • Construction waste is recycled and used for the efficient and eco-friendly disposal of construction waste increasing due to reconstruction and redevelopment project and so on. There is recycled aggregate as a typical case. And this recycled aggregate shows strong alkalinity due to calcium hydroxide, and causes many environmental problems. Therefore, this is a study on reduction in the strong alkalinity of recycled aggregate by using phosphate of ammonium in order to reduce the pH of recycled aggregate. Besides, a possibility that a pH reducing agent of recycled aggregate could be applied to a site was evaluated. As a result, it was possible to verify that pH decreased as the percentage of pH reducing agent increased. It is thought that the pH reducing agent can be applied to a site by methods such as immersion and spray using the pH reducing agent in the process of producing recycled aggregates.

  • PDF

지속가능한 도시기반시설 건설을 위한 잠재적 환경영향 발생 특성 평가 - 하수처리시설, 하수관거, 방수로를 중심으로 - (The Environmental Impact Assessment for Sustainable Urban Infrastructure Construction - A Case Study on Wastewater Treatment Plant, Sewerage System and Tailrace -)

  • 박광호;김창희;황용우
    • 상하수도학회지
    • /
    • 제20권6호
    • /
    • pp.919-926
    • /
    • 2006
  • In this study, environmental impact assessments of wastewater treatment plant (WWTP), sewerage system, and tailrace were performed using LCA methodology. The life cycle stages were divided into 3 categories; construction stage, maintenance stage and demolition & disposal stage. As a tool of impact assessment, Ecoindicator99 containing fate analysis, exposure & effect analysis and damage analysis, was used. As tile results of WWTP LCA, more than 80% of environmental impact was produced from maintenance stage. On the other hand, most of environmental impact was produced from construction stage in the case of tailrace and sewerage system construction.

현장실태를 고려한 국내 터널공사 공사비산정기준 개선 (The Improvement of Tunnel Construction Cost Standards Considering the Site Conditions in Korea)

  • 안방율;이한수;오재훈;송태석
    • 한국산학기술학회논문지
    • /
    • 제21권8호
    • /
    • pp.26-35
    • /
    • 2020
  • 터널공사는 국내 공공건설공사의 중요한 부분을 차지하고 있으며, 다양한 장비와 기술의 개발로 터널공사 시공방법이 발전하였고 현장에 적용되고 있으나 공사비산정기준은 아직까지 현장실태를 제대로 반영하지 못하고 있다. 본 연구에서는 현장실태를 반영한 공사비산정기준 수립을 위하여 관련 문헌조사 및 현장조사를 통해 합리적인 터널공사비 산정기준을 제시하였다. 먼저 현재 건설공사 표준품셈에서 정하는 터널공사비 산정기준의 각 항목들을 분석하고 현장조사를 통한 실제 현장시공의 실태와 비교 분석하였다. 주요 조사내용으로는 암판정 및 내공측량, 천공속도, 버력처리 장비조합 등 싸이클 시간과 관련된 작업 시간에 대한 조사와, 굴착 투입인원에 대한 현장별 적용실태를 확인하였다. 현장 조사결과를 바탕으로 터널굴착 1발파당 싸이클 시간, 천공기계의 천공속도, 버력처리 장비조합, 터널굴착 투입 작업인원에 대한 개선안을 제시하였다. 싸이클 시간의 경우 천공준비 시간에 암판정 및 내공측량 시간을 반영하였으며, 천공기계 속도는 컴퓨터 점보드릴의 천공속도를 반영하였다. 버력처리는 상차장비의 규격을 현장 시공실태에 맞추어 개정하였으며, 터널굴착 투입 작업조를 현장실태에 맞추어 개선안을 제시하였다. 본 연구를 통하여 현장 시공실태를 반영한 공사비산정기준이 제시되었으며, 터널공사 적정공사비 확보에 일조할 것으로 기대된다.