In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.
The purpose of this study is to propose different construction costs based on the number of kindergarten classrooms. Literature review reorganized the space program for kindergartens. For suggesting the room sizes of each spaces, this paper collected the three types of analysis; 1) the previous researches, 2) field survey, and 3) construction drawings. Based on the results, building sizes for the individual class sizes were presented. And, this paper made a standard priced BOQ(Bill of Quantity) through analysis on the existing priced BOQ. Finally, the recommendable construction costs were proposed by applying the building sizes to the standard priced BOQ. The practitioners of school districts and government organizations can make appropriate budgets considering the building sizes.
The 1th International Conference on Construction Engineering and Project Management
/
pp.699-704
/
2005
Normally, monetary penalties for breach of agreement will be stipulated in the contract. The contractor parties, who fail to fulfill the agreement, are required to pay the other parties a certain amount or proportion of money as a fine. However, it is worth our study - whether or not the scope of monetary penalty implementation and bases for determination of a fine will cover the losses of social and administrative costs incurred by the interruption of the contract. This research is about the best timing for government to cancel the freeway repair work contracts. Under the goal of the maximum social welfare, the limitation of government spending for the social and administrative costs invoked by interruption of contracts will have to be considered to attain the best timing of contracts' suspension or deferment. According to the factors of social and administrative costs, the best time point is calculated to reduce the loss of the aforesaid costs, which can also be used as theoretical basis for the future road-widening construction at home.
건설사업은 복합, 중장기적인 사업특성상 프로젝트의 기획부터 시공 완료 단계까지 정확한 공사비 예측 및 확인, 정산 절차가 매우 중요하며, 기획에서 실시설계, 물량산출의 전 단계에 이르기까지 공사비와 관계된 리스크요인의 검토와 판단이 강조되고 있다. 그러나 공공주택의 입낙찰 금액의 심사 및 실행예산 편성 시 실적데이터에 의한 공사비 초과요인에 대한 검토와 조치, 공사비 리스크의 적절한 대응이 이루어지지 않고 있는 실정이다. 이에 본 연구에서는 2004년~2010년 준공분 공공주택 40개 현장의 준공정산서를 대상으로 세부공종별 실적공사비 항목을 사업초기 실행예산을 기준으로 비교하여, 실적공사비의 변동관계에서 나타나는 편차 및 변동 폭을 분석함으로써 불규칙적 공사비 리스크요인을 파악하고 정량적 분석을 실시하였다. 연구결과 연도별, 연면적별, 지역별, 공사금액별, 분양/임대방식별 다양한 공사비 리스크 요인 및 결과를 도출하였다. 연도별 정책과 경기 변동에 따른 공사비 리스크를 알 수 있었으며, 지역별, 연면적별 공사특성에 따른 공사비 리스크 항목을 도출하였다. 공사금액별 리스크 분석에서는 최저가낙찰제의 문제점을 알 수 있었으며, 공사비 초과 리스크 비중은 외주비와 자재비 항목에서 가장 크게 발생하는 것으로 나타났다. 직접공사비 중 외주비 리스크는 지붕공사와 타일공사가 높게 나타났고, 자재비 리스크는 철근, 시멘트가 높게 나타났다. 본 연구결과는 향후 공공주택 실행예산 편성 시 분류 방식에 따라서 공사비 리스크 검토 공종 및 관리요소 분석을 위한 자료로 활용할 수 있을 것으로 판단된다.
건설안전사고 발생을 근본적으로 축소하기 위해 설계단계 설계안전성 검토를 도입해 시행하고 있다. 따라서 본 연구에서 안전을 고려한 설계를 위해 선정된 공법이 안전사고를 줄일 수 있으나 공기와 공사비에 미치는 영향을 검토하여 여러 측면의 효과를 확인하고자 하였다. 추락재해 요인을 내포하고 있는 건물외벽 마감재 바탕 구조물 시공공법을 안전을 고려해 선정한 후 공기와 공사비 측면에서 비교분석하였다. 그 결과 안전뿐만 아니라 공기나 공사비 측면에서도 효과가 있는 것으로 나타났다. 따라서 설계단계 설계안전성 검토에 의해 선정된 공법이 프로젝트 전체에 긍정적인 영향을 미칠 것으로 사료된다.
건설공사 표준품셈 기계경비 부분은 1960년대 초 일본 및 미국의 자료를 근간으로 하여 제정된 이후, 극히 부분적으로만 제 ${\cdot}$ 개정되었을 뿐 그 동안의 건설기계와 공법의 발전을 반영하지 못하고 있다. 본 연구에서는 표준품셈 기계경비 중에서 기계손료의 관리비(금리, 격납보관비, 보험료, 세금)를 조사하였으며 합리적인 관리비 산출을 위해 국내 ${\cdot}$ 외 문헌조사, 건설현장 16개소 실사, 그리고 건설기계장비 임대업체 20개사를 대상으로 설문조사 및 인터뷰를 실시하였다. 수집한 자료와 현행 표준품셈의 관리비 산출에 적용되는 수치들을 비교분석한 결과를 토대로 관리비를 새롭게 정의하였다. 관리비의 구성 면에서 금리, 격납보관비, 보험료와 세금 등을 고려하여 6종건설기계와 일반기계를 구분하였고 현실적인 수치를 제시하였다. 본 논문에서 제시하고 있는 각종 자료 및 수치들은 적정한 공사 예정가격을 산정할 수 있는 기초가 될 수 있을 뿐 아니라, 관련 연구의 토대가 될 수 있으리라 기대한다.
The 2th International Conference on Construction Engineering and Project Management
/
pp.239-248
/
2007
In the highly competitive construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of on-site supervisory manpower often offset the profit gained from the project and may jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of on-site supervisory manpower and estimate construction site costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects. In the modeling the costs and allocation of on-site supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects can be accurately predicted and the assignment of supervisory manpower feasibly automated.
국내의 수로교는 쌀문화로 상징되는 농업용수를 공급하는 교량으로서 수로교를 개보수하기 위해서는 기본설계를 실시하는 것이 바람직하나 현재 생략되고 있는 실정이므로 이에 소요되는 공사비를 산정할 필요가 있다. 이 연구에서는 2003년 이후 교체한 RC구조 수로교에 대한 실적자료를 기초로 개략공사비 산정 회귀분석(RA) 모델과 사례기반추론(CBR) 모델을 개발하였다. RA 모델의 경우 단순회귀 모델이 다중회귀 모델보다 오차율이 낮았다. CBR 모델의 경우 유전 알고리즘을 이용하였으며 영향요인의 가중치, 편차, 순위조건을 최적화 대상으로 하였고 특히 영향요인 가중치의 범위를 제한하여 수로교 개보수 공사비의 예측 정확도를 제고하였다. RA 모델과 CBR 모델 사이의 오차율은 통계적 차이를 보이지 않았다. 본 논문에서 제시된 수로교 개보수 개략공사비 산정방법은 개보수사업의 시행에 따른 신속한 의사결정을 하는데 활용될 수 있을 것으로 기대된다.
In order to calculate construction costs properly, it is necessary to add the weight that reflects different worksite conditions. The implementation of the weight, however, is difficult because it is impossible to determine whether wight should be added in basic work or whether weight values are overlapped. Special worksite conditions further complicate the matter. Furthermore, overlapping implementation of weight values result in overestimation of construction costs. The current study clearly analyzed the weight value items in the current construction cost calculation standards, and analyzed the weight value items included under the basic productivity category to propose an improvement of weight standards. Basically, the estimating standards provide 140 weight value items, with different levels of weight given to each item. Among 1,333 items in the estimating standards, 140 include weight values. Some items have two types of weight values.
Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.