A Study on Establishing a Digital Twin Model for Automated Layout Robots (먹매김 시공 자동화 로봇의 디지털 트윈 모델 구축 방안 연구)

  • Park, Gyuseon;Lee, Dohyeon;Jang, Minho;Kim, Taehoon;Lim, Hyunsu;Cho, Kyuman
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.155-156
    • /
    • 2022
  • In the process of developing an industrial robot, various simulations should be conducted to evaluate the driving, movement, and performance of the robot. Space and time constraints exist to manufacture existing robots and implement various simulations, and efficiency is reduced due to high costs. To solve this problem, many simulations can be conducted by implementing the same movement and working environment as the real environment in virtual reality using digital twin technology. This study proposes a process for establishing a digital twin model of automated layout robots. Using the digital twin model, it is expected that it will not only evaluate the hardware performance of the robot in the future, but also verify the robot's algorithms such as motion planning and work process, identify and solve potential problems in advance, and prevent problems caused by software.

  • PDF

Implementing an Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance and Rehabilitation in California, USA

  • Kim, Changmo;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.376-380
    • /
    • 2015
  • Life-Cycle Cost Analysis (LCCA) for highway projects is known as an effective analytical technique that uses economic principles to evaluate long-term alternative investment options, especially for comparing the values of alternative pavement design structures and construction strategies. In the Unites States, the 2012 Moving Ahead for Progress in the 21st Century Act (MAP-21) amended the United States Code to mandate that the United States Government Accountability Office (GOA) conducts a study of the best practices for calculating life-cycle costs and benefits for the federally funded highway projects in 2013. The RealCost 2.5CA program was developed and adapted as an official LCCA tool to comply with regulatory requirements for California state highway projects in 2013. Utilization of this California-customized LCCA software helps Caltrans to achieve substantial economic benefits (agency cost and road user cost savings) for highway projects. Proper implementation of LCCA for roadway construction and rehabilitation would deliver noticeable savings of agency's roadway maintenance cost especially in developing counties where financial difficulties exist.

  • PDF

Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

Development of Tunnel Construction Cost Model Using System Dynamics (시스템 다이내믹스를 이용한 터널공사비 모델 개발)

  • Park, Yong-Woo;Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.4
    • /
    • pp.468-475
    • /
    • 2012
  • Construction cost of tunnel is decided on construction area, site conditions, and construction methods. However, there is few research on developing models to estimate early construction costs. Therefore, this paper presents a model for early estimation tool for NATM tunnel using system thinking. The effect factors for tunnel construction cost were defined and the causal map is developed. Then empirical case analysis were performed to identify the cost difference due to tunnel length, excavation volume, and rock quality. The proposed model would be an alternative to estimate early construction cost of NATM tunnel.

Identification of Factors Influencing the Operability of Precast Concrete Construction Shipment Request Forms

  • Jeong, Eunbeen;Jang, Junyoung;Kim, Tae Wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.145-152
    • /
    • 2022
  • Recently, interest in the precast concrete (PC) construction method has been increasing. The PC construction process consists of i) design, ii) production, iii) transportation, and iv) installation. A PC field manager at the site submits a shipment request form to the factory one to three days before the installation of the PC component. Numerous matters should be considered in writing a shipment request form. Incorrect shipment request forms may cause standby resources, waste of resources, premature work conclusion, or excessive work. These issues can lead to an increase in construction costs, replanning of PC component installation, or rework. In order to prevent such problems, PC component installation should be simulated based on the shipment request form. Accordingly, this study aims to identify factors influencing the operability of shipment request forms for PC construction. To this end, this study derived factors influencing i) initiation of the activity, ii) addition or deletion of activities, and iii) an increase or decrease in the activity execution time. As a result, this study identified flow, the features of PC components, condition of PC components, unloading location, installation location, input equipment and labor, number of anchors, number of supports, weather, strike, and accident. Further studies should verify the factors derived in this study based on focus group interviews.

  • PDF

Cradle to Gate Emissions Modeling for Scheduling of Construction Projects

  • Sharma, Achintyamugdha;Deka, Priyanka;Jois, Goutam;Jois, Umesh;Tang, Pei
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.975-983
    • /
    • 2022
  • This paper presents an innovative way of integrating scheduling and project controls with the environmental impact of a construction project to track, monitor, and manage environmental emissions at the activity level. As a starting point, scheduling and project controls help monitor the status of a project to provide an assessment of the duration and sequence of activities. Additionally, project schedules can also reflect resource allocation and costs associated with various phases of a construction project. Owners, contractors and construction managers closely monitor tasks or activities on the critical path(s) and/or longest path(s) calculated through network based scheduling techniques. However, existing industry practices do not take into account environmental impact associated with each activity during the life cycle of a project. Although the environmental impact of a project may be tracked in various ways, that tracking is not tied to the project schedule and, as such, generally is not updated when schedules are revised. In this research, a Cradle to Gate approach is used to estimate environmental emissions associated with each activity of a sample project schedule. The research group has also investigated the potential determination of scenarios of lowest environmental emissions, just as project managers currently determine scenarios with lowest cost or time. This methodology can be scaled up for future work to develop a library of unit emissions associated with commonly used construction materials and equipment. This will be helpful for project owners, contractors, and construction managers to monitor, manage, and reduce the carbon footprint associated with various projects.

  • PDF

Energy Consumption Characteristics and Evaluation of Thermal Insulation Performance in Accordance with Built Year of Apartment Complex (공동주택의 준공연도에 따른 단열성능 평가 및 에너지소비 특성에 관한 연구)

  • Choi, Doo Sung;Lee, Myung Eun;Chun, Hung Chan
    • KIEAE Journal
    • /
    • v.14 no.3
    • /
    • pp.79-86
    • /
    • 2014
  • Studies have shown that the thermal performance of buildings changes depending on the year of construction completion. It leads to increased energy consumption of buildings and significant financial burden on users. Thus, this study has calculated the thermal insulation performance of 86 apartments quantitatively, using temperature difference ratio and sensible heat flux. Also, energy consumption characteristics depending on the year of construction completion and thermal insulation performance were analyzed by comparatively analyzing the results of insulation performance evaluation and heating costs. The analysis results are as follows. As for thermal insulation performance, it was around 70% lower in the apartments completed before 1985, compared to apartments completed after 2010. As for heating costs, the apartments with the highest heating cost incurred 1.5 higher heating cost than the apartment with the lowest heating cost. In terms of the insulation performance evaluation, the difference was 2.5-fold.

Designing Racks for Transporting Flat Glass Products in a Construction Industry (건설 산업용 판유리 운반을 위한 랙 설계)

  • Kwon, Kyung Jin;Hong, Soondo;Kim, Kap Hwan
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.42 no.4
    • /
    • pp.270-279
    • /
    • 2016
  • A glass product manufacturing company transports a large number of flat glass products from a manufacturing firm to a building construction site. The products are transported using specially designed racks, which assure fewer glass breakages during the deliveries. This study determines the sizes of the racks which minimize the total logistics cost including costs for rack purchasing, handling, transportation, and inventory costs. The determination of the rack size should consider tradeoff relationships between the amount of glasses piled in a rack and the number of racks loaded on a truck, and affects the required number of racks and the truck operational cost. A truck loading algorithm is proposed to maximize a high truck utilization, and an enumeration method is proposed to determine the optimal combination of rack sizes considering the total logistics cost. The numerical example is solved by using a real data.

Mechanized tunnels lining prefabricated segments production methods

  • Elaheh Banihashemigargari;Amir H. Rezaeifarei
    • Geomechanics and Engineering
    • /
    • v.32 no.5
    • /
    • pp.503-512
    • /
    • 2023
  • In tunneling projects, a significant part of the costs is spent on segment production. By more economically producing, the cost of tunnel construction can be greatly reduced, especially in long and large-diameter tunnels. In the present study, the effect of using the Carousel method in the improvement of the production system performance compared to the conventional Static system has been studied. To carry out the research, a quantitative comparison of cost and production time was carried out for two production methods using the available documentation. The opinions of experts have been obtained using questionnaires and qualitative comparison of cost, time and production quality was done by implementation of statistical analysis. The SPSS software and the univariate t-test were used to analyze the questionnaires. According to the results of statistical analysis with SPSS, the use of the Carousel method will reduce production time and costs along with increasing manufacturing quality. According to the documentation analysis, the Carousel method reduces the cost of production by almost 30% and leads to a reduction of the production time to approximately 40% of the Static moulds system. The Carousel method has a higher production rate, efficiency, and better performance. Research into quantifying the benefits of Carousel method in the production system performance is very limited. This comparison is based on real information from the under construction Tabriz Metro project. This article can be very helpful in choosing the best production method.