A Study on the Loss Reduction Method of Reinforcing Bar through Case Study

  • Park, U-Yeol;Jung, Hyeon-Ok;Kang, Tai-Kyung;Cho, Hun-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • 제10권4호
    • /
    • pp.123-132
    • /
    • 2010
  • Rebar work accounts for approximately 30% of the total construction costs for rebars and concrete. Recently, the high rising prices of rebars have become one of the principle factors of rising construction costs. Therefore, construction companies are putting much effort into loss reduction of rebars. Consequently, in this study, we wished to present loss reduction methods of rebars before the preparation of the placing drawings. To devise such methods, we collected previous case studies and analyzed methods that were applied for loss reduction. As a result of the analysis, we were able to find the following methods for loss reduction of rebars: method of reducing the number of splices at the mat foundation, method of reducing splice length at the internal columns or walls of the underground parking lot, method of reducing cap-ties of internal beams of basement floors excluding perimeter beams, and method of reducing anchorage length at the internal column or wall of the underground parking lot. Based on those analysis results, we presented our own loss reduction methods of rebars. Applying our methods resulted in considerable loss reduction.

A Study on Entering Water Temperature in Vertical Closed Ground Loop System Considering the Economical Feasibility in Load of the Office Building (사무시설에 수직형 지열원 냉 난방시스템의 경제성을 고려한 인입온도(EWT)에 관한 연구)

  • Lee, Byung-Doo;Lee, Dae-Woo;Lee, Se-Jin
    • Proceedings of the SAREK Conference
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.579-585
    • /
    • 2009
  • Recently, Vertical-Closed Loop system using geothermal which is the most efficient among the building cooling and heating systems is coming into wide spread due to assistance of domestic policies. However, there is a limitation that a design of ground heat exchanger taking 60% of construction cost is done by GLD and GLHEPRO programs without specific guidelines and consideration on Entering Water Temperature(EWT). For getting an optimal EWT, we analyzed the costs for construction of ground heat exchanger and cooling and heating for 15 years. In the results, reduction of construction costs as the length of ground heat exchanger shortens was much greater than increase of the electrical power consumption as COP gets low. EWT that COP of heat pump can be 3.76 or above was below $31^{\circ}C$ in cooling and was over $5^{\circ}C$ in heating.

  • PDF

Construction Cost Segregation Process using Building Information Modeling

  • Zhou, Rong;Li, Huimin;Zhang, Chengyi;Lv, Lelin;Tian, Junrui;Cakir, Sevilay Demirkesen
    • International conference on construction engineering and project management
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1106-1113
    • /
    • 2022
  • Cost segregation helps reduce tax liabilities by reclassifying real property to personal property and accelerates tax depreciation of a property. A typical cost segregation study requires much time and high costs. This study proposed a BIM integrated cost segregation process that can be applied to any commercial building project. The proposed BIM-based cost segregation process was verified in a new commercial construction project. It approved that this approach can: (1) increase the cash flow for the owner and provide assistance to tax-paying enterprises; (2) enable the contractor to use it as an added value in the bidding process; (3) realize data sharing in a common platform to improve the cost segregation study efficiency and reduce costs and errors; (4) contribute to the asset management in the life cycle of buildings while filling in the blank of cost segregation process. Future studies will focus on the automation of cost segregation and asset management in building construction's life cycle.

  • PDF

MODEL-BASED LIFE CYCLE COST AND ASSESSMENT TOOL FOR SUSTAINABLE BUILDING DESIGN DECISION

  • Iris X. Han;W. Zhou;Llewellyn C.M. Tang
    • International conference on construction engineering and project management
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.311-317
    • /
    • 2011
  • There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

  • PDF

Enhancing Productivity and Quality in Korean Modular Housing through Smart Factory Integration

  • Youngwoo, KIM;Sunju, KIM
    • The Journal of Economics, Marketing and Management
    • /
    • 제12권4호
    • /
    • pp.13-25
    • /
    • 2024
  • Purpose: Korea's construction industry has faced declining productivity and quality issues due to labor-intensive onsite construction and variables like weather, material price fluctuations, and labor shortages. The modular housing industry, introduced in Korea in 2003, offered benefits like reduced construction time and enhanced productivity through offsite manufacturing. However, its adoption remains limited due to high costs, quality concerns, and low consumer acceptance. Research Design, Data, and Methodology: This study explores the feasibility and impact of implementing smart factory technologies in the modular housing industry to overcome these barriers. Using survey data from 179 construction industry experts, the study employs frequency and regression analysis to identify key factors influencing the adoption of modular housing and the effectiveness of smart factories. Findings suggest that government-led educational programs and strong policy support are essential for successful implementation, enhancing productivity, reducing costs, and improving quality. Conclusions: The study emphasizes the need for standardization of modular housing, deregulation of relevant laws, and increased public awareness to stimulate market growth and innovation. Policy recommendations include financial support for modular manufacturers transitioning to smart factories, ensuring stable supply volumes, and promoting the benefits of modular housing to consumers. Integrating smart factory technologies can lead to significant advancements in the modular housing industry, contributing to the sustainable development and modernization of Korea's construction sector.

Life Cycle Cost Analysis Models for Bridge Structures using Artificial Intelligence Technologies (인공지능기술을 이용한 교량구조물의 생애주기비용분석 모델)

  • Ahn, Young-Ki;Im, Jung-Soon;Lee, Cheung-Bin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • 제6권4호
    • /
    • pp.189-199
    • /
    • 2002
  • This study is intended to propose a systematic procedure for the development of the conditional assessment based on the safety of structures and the cost effective performance criteria for designing and upgrading of bridge structures. As a result, a set of cost function models for a life cycle cost analysis of bridge structures is proposed and thus the expected total life cycle costs (ETLCC) including initial (design, testing and construction) costs and direct/indirect damage costs considering repair and replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses costs. Also, the optimum safety indices are presented based on the expected total cost minimization function using only three parameters of the failure cost to the initial cost (${\tau}$), the extent of increased initial cost by improvement of safety (${\nu}$) and the order of an initial cost function (n). Through the enough numerical invetigations, we can positively conclude that the proposed optimum design procedure for bridge structures based on the ETLCC will lead to more rational, economical and safer design.

A Suggestion on the Subsidy System to Promote the Construction of Urban Rail Transit (도시철도 건설확충을 위한 국고지원체제)

  • Lee, Chang-Woon
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.46-51
    • /
    • 2003
  • The government's financial subsidy system for the construction project of urban rail transit needs to be revised. In 1998, the central government raised its subsidy rate to 50$\%$ of the total cost of construction. The 'method for differentiating subsidies depending on construction type and transit System' is suggested here, so that a subsidy rate can be raised for the construction of Light Rail Transit, which costs less to construct. Such methods will force local governments to make decisions regarding construction method and project size in a more rational manner.

  • PDF

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • 제8권2호
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

Optimum Life Cycle Cost Design of High-Speed Railway Steel Bridges (고속철도 강교량의 총기대비용 최적설계)

  • 조효남;민대홍;조준석
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 한국전산구조공학회 2000년도 가을 학술발표회논문집
    • /
    • pp.109-114
    • /
    • 2000
  • In this paper, an optimum design model for minimizing the life-cycle cost (LCC) of high-speed railway steel bridges is proposed The point is that it takes into account service life process as a whole, and thus the life-cycle costs include initial (design, testing, and construction) costs, maintenance costs, expected strength failure costs and expected serviceability failure costs. The problem is formulated as that of minimization of expected total life-cycle cost with respect to the design variables. By processing the optimum LCC design the effective and rational basis is proposed for calculating the total LCC and the sensitivity analysis of LCC is peformed. Based on a numerical example, it may be positively stated that the optimum LCC design of high-speed railway steel bridges proposed in this study provides a lot more rational and economical design, and thus the proposed approach will expedite the development of new concepts and design methodologies that may have important implications in the next generation performance-based design codes and standards.

  • PDF

A Life Cycle Cost Case Analysis on the Build-Transfer-Lease(BTL) Projects of School (학교 임대형민자사업(BTL)의 LCC 사례 분석)

  • Cho, Seung-Yun;Ahn, Jang-Won;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.145-150
    • /
    • 2007
  • This study is a LCC case analysis on the school one of the BTL projects which is constructed by private organizations and rented to government. According to the RFP to make out documents, it is performed the case analysis based on the results of LCC calculation about maintenance & conservation costs; repairing costs and replacement costs. It is analyzed LCC on maintenance & conservation costs for 20 years(rent period) and 65 years(life cycle). As a result of LCC analysis, about more than 50% of total LCC are architectural works and the rest of them are machinery works, electric works, and civil works in the order. And it is also suggested some problems and their solutions to perform LCC analysis on the current BTL projects of school.

  • PDF