• 제목/요약/키워드: construction cost estimation

검색결과 493건 처리시간 0.025초

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측 (Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction)

  • 김현미;김태형;신영근;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF

시스템 다이내믹스를 이용한 터널공사비 모델 개발 (Development of Tunnel Construction Cost Model Using System Dynamics)

  • 박용우;박희성
    • 한국콘텐츠학회논문지
    • /
    • 제12권4호
    • /
    • pp.468-475
    • /
    • 2012
  • 도로건설공사의 주요 구조물인 터널의 경우 건설지역, 지반 환경, 공법 등 다양한 변수에 의해 공사비가 결정된다. 그러나 NATM 터널 초기 공사비를 결정하기 위한 모델에 대한 연구는 부족한 실정이다. 따라서 본 논문은 시스템 사고를 활용하여 터널공사비 예측을 위한 모델을 제시하였다. 기존 문헌 조사를 통해 터널공사비의 영향요인을 파악하고 영향 요인간 상관관계를 고려하여 터널공사비 인과지도를 작성하였다. 그리고 터널공사의 내역서를 활용하여 터널 길이와 굴착량, 암질 등에 의한 터널공사비 변화정도를 분석하였다. 본 연구를 통해 다양한 영향요인을 고려한 NATM 터널공사비 예측에 대한 대안을 제시할 수 있을 것으로 기대한다.

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

RISK MANAGEMENT IN CIVIL CONSTRUCTION PROJECTS - FROM COST ESTIMATING PERSPECTIVE

  • Ashley Jaensch;Jian Zuo;Nicholas Chileshe
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.162-167
    • /
    • 2011
  • Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.

  • PDF

아스팔트포장 유지보수 적정공사비 산정방안 연구 (A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work)

  • 오재훈;송태석;안방율
    • 한국건설관리학회논문집
    • /
    • 제21권6호
    • /
    • pp.16-26
    • /
    • 2020
  • 도로포장 유지보수 공사는 다양한 현장 여건에 의해 작업량이 다양하게 발생되고 있으나, 공사비 예정가격 작성시 세분화된 기준이 없어 적정공사비가 산정되기 어렵다. 도로포장 유지보수는 신설포장과 달리 차량들이 운행하고 있는 상황에서 시공을 할 수 밖에 없어, 도심지, 작업제한시간, 야간, 시공면적 등에 따라 생산성에 많은 차이를 보이고 있다. 이를 보정하기 위해 공사비산정기준 등에서는 차로수, 주택가, 작업가능시간, 야간작업 등의 할증을 제시하고 있으나, 공사관계자들에 따라 상이하게 적용이 되고 있는 실정이다. 본 연구에서는 도로포장 유지보수 주요 작업공종에 대하여 현장의 여건을 제대로 반영 할 수 있는 공사비산정 기준을 마련하고 적용할 수 있는 방안을 조사하였다. 주로 많이 시공되고 있는 '절삭 후 아스팔트 덧씌우기', '표층복구', '포장복구', '도로복구'를 대상으로 현장을 조사·분석 하였으며, 현장조사 결과를 바탕으로 기본적인 번화가, 주택가 등 할증을 포함하여 작업시간과 시공개소 및 면적에 따라 시공량을 구분하여 적용할 수 있는 기준을 제시하였다. 작업시간은 이동과 준비시간을 제외한 순수작업시간을 3개 type(7시간, 5시간, 3시간)으로 구분하여, 각 type에 따라 시공개소의 면적을 5가지로 구분할 수 있는 계수를 마련하였으며, 공사비를 비교·분석 하였다. 이에 따라 시공목적, 현장여건에 따른 공사비산정기준 설계방법을 제시하여 설계자가 현장여건을 고려하여 적정한 공사비를 산정할 수 있는 방안이 마련된 것으로 판단된다.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

공공아파트 계획설계단계에서의 공사비 예측모델 (Cost prediction model of Public Multi-housing Projects in Schematic Design Phase)

  • 권호석;문현석;이성균;홍태훈;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제9권3호
    • /
    • pp.65-74
    • /
    • 2008
  • 국내 건설산업의 공공 발주자는 사업의 초기단계의 사업비관리에 대한 중요성을 충분히 인식하고 있음에도 불구하고 체계화된 공사비 산정시스템을 보유하고 있지 못한 실정이다. 이에 신규 공공 건설공사를 기획하고 사업비를 책정하는 단계에서는 예산을 수립하는 담당자가 기존의 실적데이터와 경험을 바탕으로 공사비를 추정하고 있으며, 기본설계단계와 실시설계단계 이후 산정된 공사비를 책정된 예산과 비교 후 사업의 추진여부를 검토하거나 설계내용을 예산에 맞도록 변경하고 있다. 이에 본 연구에서는 공공아파트의 사업초기단계에서 공사비를 산정할 수 있는 공공아파트 계획설계단계에서의 공사비 예측모델을 개발하고자 하였다. 본 연구의 결과를 바탕으로 계획설계단계에서 공사비를 예측하고 사업비 및 전반적인 설계를 관리한다면 지금보다 더 효율적인 방법으로 국가의 재원을 적절하게 책정하고 집행할 수 있을 것으로 판단된다.

Support Vector Machine을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of School Building Projects Based on Support Vector Machine Technique at the Early Project Stage)

  • 신재민;박현영;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.153-154
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So many method and techniques have developed that can estimate construction cost using limited information available in the early stage. Among the techniques, Support Vector Machine(SVM) has received attention in various field due to its excellent capacity for self-learning and generalization performance. Therefore, the purpose of this study is to verify the applicability of cost prediction model based on SVM in school building project at the early stage. Data used in this study are 139 school building cost constructed from 2004 to 2007 in Gyeonggi-Do. And prediction error rate of 7.48% in support vector machine is obtained. So the results showed applicability of using SVM model for predicting construction cost of school building projects.

  • PDF

건설 프로젝트의 코스트 리스크 분석방법론에 관한 연구 (A Study on the Cost Risk Analysis Method for Construction Projects)

  • 이동운;김영수
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.201-211
    • /
    • 2003
  • 불확정 요소가 많은 건설 프로젝트에서 코스트 리스크의 분석은 관련 전문가의 통찰력이나 주관적 판단에 의존하는 경우가 많다. 하지만 국내 건설산업의 경우 코스트 리스크 분석시 객관적인 산출근거에 의한 확률만을 고려 할 뿐 계량적 측정이 어려운 주관적 요소를 합리 적으로 반영하기 위한 방법이나 절차를 갖고 있지 못하다. 이와 같은 관점에서 본 연구는 보다 신뢰성이 우수한 비용견적을 위해서 전문가의 주관적인 요소까지 종합적으로 평가하고, 리스크로 인한 비용의 변동을 정량적으로 분석할 수 있는 새로운 로스트 리스크 분석모델을 제시하였다 아울러 실무에서도 간단한 절차에 따라 모델을 체계적으로 수행할 수 있도록 편리한 사용자 인터페이스를 제공해 주는 프로토타입을 구현하였다.