The 6th International Conference on Construction Engineering and Project Management
/
pp.698-699
/
2015
For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.
The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.
도로건설공사의 주요 구조물인 터널의 경우 건설지역, 지반 환경, 공법 등 다양한 변수에 의해 공사비가 결정된다. 그러나 NATM 터널 초기 공사비를 결정하기 위한 모델에 대한 연구는 부족한 실정이다. 따라서 본 논문은 시스템 사고를 활용하여 터널공사비 예측을 위한 모델을 제시하였다. 기존 문헌 조사를 통해 터널공사비의 영향요인을 파악하고 영향 요인간 상관관계를 고려하여 터널공사비 인과지도를 작성하였다. 그리고 터널공사의 내역서를 활용하여 터널 길이와 굴착량, 암질 등에 의한 터널공사비 변화정도를 분석하였다. 본 연구를 통해 다양한 영향요인을 고려한 NATM 터널공사비 예측에 대한 대안을 제시할 수 있을 것으로 기대한다.
Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.162-167
/
2011
Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.
도로포장 유지보수 공사는 다양한 현장 여건에 의해 작업량이 다양하게 발생되고 있으나, 공사비 예정가격 작성시 세분화된 기준이 없어 적정공사비가 산정되기 어렵다. 도로포장 유지보수는 신설포장과 달리 차량들이 운행하고 있는 상황에서 시공을 할 수 밖에 없어, 도심지, 작업제한시간, 야간, 시공면적 등에 따라 생산성에 많은 차이를 보이고 있다. 이를 보정하기 위해 공사비산정기준 등에서는 차로수, 주택가, 작업가능시간, 야간작업 등의 할증을 제시하고 있으나, 공사관계자들에 따라 상이하게 적용이 되고 있는 실정이다. 본 연구에서는 도로포장 유지보수 주요 작업공종에 대하여 현장의 여건을 제대로 반영 할 수 있는 공사비산정 기준을 마련하고 적용할 수 있는 방안을 조사하였다. 주로 많이 시공되고 있는 '절삭 후 아스팔트 덧씌우기', '표층복구', '포장복구', '도로복구'를 대상으로 현장을 조사·분석 하였으며, 현장조사 결과를 바탕으로 기본적인 번화가, 주택가 등 할증을 포함하여 작업시간과 시공개소 및 면적에 따라 시공량을 구분하여 적용할 수 있는 기준을 제시하였다. 작업시간은 이동과 준비시간을 제외한 순수작업시간을 3개 type(7시간, 5시간, 3시간)으로 구분하여, 각 type에 따라 시공개소의 면적을 5가지로 구분할 수 있는 계수를 마련하였으며, 공사비를 비교·분석 하였다. 이에 따라 시공목적, 현장여건에 따른 공사비산정기준 설계방법을 제시하여 설계자가 현장여건을 고려하여 적정한 공사비를 산정할 수 있는 방안이 마련된 것으로 판단된다.
Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.77-81
/
2015
The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.
국내 건설산업의 공공 발주자는 사업의 초기단계의 사업비관리에 대한 중요성을 충분히 인식하고 있음에도 불구하고 체계화된 공사비 산정시스템을 보유하고 있지 못한 실정이다. 이에 신규 공공 건설공사를 기획하고 사업비를 책정하는 단계에서는 예산을 수립하는 담당자가 기존의 실적데이터와 경험을 바탕으로 공사비를 추정하고 있으며, 기본설계단계와 실시설계단계 이후 산정된 공사비를 책정된 예산과 비교 후 사업의 추진여부를 검토하거나 설계내용을 예산에 맞도록 변경하고 있다. 이에 본 연구에서는 공공아파트의 사업초기단계에서 공사비를 산정할 수 있는 공공아파트 계획설계단계에서의 공사비 예측모델을 개발하고자 하였다. 본 연구의 결과를 바탕으로 계획설계단계에서 공사비를 예측하고 사업비 및 전반적인 설계를 관리한다면 지금보다 더 효율적인 방법으로 국가의 재원을 적절하게 책정하고 집행할 수 있을 것으로 판단된다.
The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So many method and techniques have developed that can estimate construction cost using limited information available in the early stage. Among the techniques, Support Vector Machine(SVM) has received attention in various field due to its excellent capacity for self-learning and generalization performance. Therefore, the purpose of this study is to verify the applicability of cost prediction model based on SVM in school building project at the early stage. Data used in this study are 139 school building cost constructed from 2004 to 2007 in Gyeonggi-Do. And prediction error rate of 7.48% in support vector machine is obtained. So the results showed applicability of using SVM model for predicting construction cost of school building projects.
불확정 요소가 많은 건설 프로젝트에서 코스트 리스크의 분석은 관련 전문가의 통찰력이나 주관적 판단에 의존하는 경우가 많다. 하지만 국내 건설산업의 경우 코스트 리스크 분석시 객관적인 산출근거에 의한 확률만을 고려 할 뿐 계량적 측정이 어려운 주관적 요소를 합리 적으로 반영하기 위한 방법이나 절차를 갖고 있지 못하다. 이와 같은 관점에서 본 연구는 보다 신뢰성이 우수한 비용견적을 위해서 전문가의 주관적인 요소까지 종합적으로 평가하고, 리스크로 인한 비용의 변동을 정량적으로 분석할 수 있는 새로운 로스트 리스크 분석모델을 제시하였다 아울러 실무에서도 간단한 절차에 따라 모델을 체계적으로 수행할 수 있도록 편리한 사용자 인터페이스를 제공해 주는 프로토타입을 구현하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.