• Title/Summary/Keyword: construction control

Search Result 5,209, Processing Time 0.028 seconds

Control of Automated Greenhouse Based on a PC (PC 기반 자동화 시설 하우스 제어)

  • 김기환
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.53 no.9
    • /
    • pp.644-649
    • /
    • 2004
  • To control a greenhouse is to control environmental parameters in greenhouse. Controlled environments may be as simple as saran-covered shade houses or as complex as growth chambers. Although greenhouses are probably the most common example of a controlled environment used in agricultural/horticultural production, the type of controlled environment or system that is needed depends upon the climate, time of year, crops being produced and the environmental parameters that must be controlled. In this contribution puts emphasis on construction of automatic-controlled greenhouse system by personal computer.

Tuned vibration control in aeroelasticity of slender wood bridges

  • Tesar, Alexander
    • Coupled systems mechanics
    • /
    • v.1 no.3
    • /
    • pp.219-234
    • /
    • 2012
  • Tuned vibration control in aeroelasticity of slender wood bridges is treated in present paper. The approach suggested takes into account multiple functions in aeroelastic analysis and flutter of slender wood bridges subjected to laminar and turbulent wind flow. Tuned vibration control approach is presented with application on actual bridge. Some results obtained are discussed.

Analysis of Research for the Actual State and Management of Automated Horticultural Facilities (경북지역 현대화 원예시설의 관리실태 조사분석)

  • 정현교;이기명;박규식
    • Journal of Bio-Environment Control
    • /
    • v.5 no.2
    • /
    • pp.174-186
    • /
    • 1996
  • This study was carried out in order to understand the plan, design, constructing and actual condition of management of modernized horticultural facilities in Kyungpook Province which had been constructed from 1992 to 1995 funded by Government support. The aim of this study is to provide reference data for success of the forth project. It was performed by making up a question about driving of project and management condition of equipment after constructing. The results obtained from this study are as follows: 1. 73.5% of facilities horticulture farmhouse recognized that the prospect of greenhouse is bright, but 92.5% of the farmhouse also recognised that they need technical consultation on protected horticulture farming. Therefore, technical educations would must be enhanced about foundation of greenhouse and cultivation technique. 2. The holding times of explanatory meetings, cause of understanding to farmhouse, were one or two times in greenhouse construction, and 62.5% of the farmhouse expressed the insufficiency at the explanation and educational data. For this reason, it was judged that the construction contract had been delayed more than 5 months in 49.3% of the farmhouse after the decision of project budget. 3. In constructing after a contract, the rates of construction delay is 53.4% and defect occurrence is 41.1%. The biggest reasons of construction delay was insufficiency of worker and materials supply. Each percentage is 29.1%. And the reason of defect occurrence is badness of machinery equipment(62.9% ). 4. In management of greenhouse, a pipe-constructed plastic film greenhouse changes plastic film every one and three years because of sticking dust on plastic film. It was needed to about in cleaning technique of coverings. Because that used 3-5 years only half of the expected life span. 5. The order of broken rating in the subsidiary equipment is like this lollop ventilator (42.8%), a general control system(33.3%) especially, in the case of a general control system, the rate of all family can control is 52.7%. so, it is time to develop easy control equipment which every one could use as soon as possible. 6. When choose heat generator as decide capacity, the most priority is the mount of heat generator the percent is 45.5% heat generator and as decide model, the private purchase's percent is 77.3%. It is higher than a public bidding heat generator the percent is 22.7% heat generator when it compare with a public bidding. In the case of $CO_2$ generator, using rate is only 19.0%. The using rate is very low, so it needs education how to use depends on the way of the subsidiary equipment. 7. In the case of seedlings, it is asked to use factory-processed seedling effectively. because it's difficult to get security of labors(58.8%), hoped crops (55.9%) access same crops(29.4%) much more and changing of crops depends on market situation. that is the main reason the lack of knowhow.

  • PDF