Improvement of Construction Process Control to Reduce Construction Risk (건설공사 공정관리이행의 리스크 감소를 위한 개선방안)

  • Park Hong-Tae;Son Chang Baek;Kang Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.35-44
    • /
    • 2000
  • The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

  • PDF

Construction Techniques for Crack Control of Underground Box Structures (지하철 박스 구조물의 수화열 해석 및 온도균열 제어 방안)

  • 차수원
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.153-159
    • /
    • 2001
  • Recently, the underground reinforced concrete(RC) box structures have been increasingly built in Korea. In such structures, the heat of hydration may cause serious cracking problems. The RC box structures are classified in this category that needs much attention to control the hydration heat during construction, which causes the restraining effects on the boundaries. The purpose of the present study is to develop the rational construction method to control the thermal cracking problem of the box structures. In this study, the causes and mechanism of thermal cracking according to construction stages in the RC box structures are thoroughly analyzed. The major influencing variables are studied through the finite element analysis which affect the thermal cracking of RC box structures. The research results of the present study can be efficiently used for the control of cracking of box structures during construction stages.

  • PDF

An Experimental Study on the Noise Control of Unit Bathroom Wall Panel (건식욕실 벽 패널의 소음억제를 위한 실험적 연구)

  • Kim, Tae-Hui;Kim, Gwang-Hee;Lee, Tack-Wn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.69-74
    • /
    • 2008
  • TProduction's adaptation manufactured construction component is enlarged the result of development in the various construction products and technology. But the pre-fabricated unit bathrooms are not used in spite of many advantages which occupies less than 10% of its market share. This study is for the alternative methods through the on-the-spot experiments to lessen resonance of the wall panel in the Unit bathroom. The results are summarized as follows. Unit bathroom was effective in suitableness part noise control performance when attach sound-absorbing materials. But noises control performance was not better than the general used bathroom. When Urethane (egg container pattern) was applied in the unit bathroom, unit bathroom can be expected for utilization in the construction market field.

A Self-control Safety Management Activity Model in Construction Sites through Analysis of Success Factors (건설현장 안전관리 성공요인 분석을 통한 자율안전관리활동 개선에 관한 연구)

  • Lee, Joo-Sung;Hong, Jung-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.109-117
    • /
    • 2008
  • Recently, there has been constituted the government regulations and the normative methods to control the safety management activities in construction fields, but almost of these regulations are ineffective, because of some characteristics safety management have. The needs of the times make government regulations and the normative methods change to autonomic management methods. In this context, it is significant certainly to improve the standard of safety management that is used as a tool to protect the workers from the accidents or industrial disasters in the construction field. In this research, it will be showed that the outside regulations and safety management systems of the head office have their limits to reflect the safety managements of field participants. Then, it will be presented the improved model of self-control safety management activities which is essential for success safety management.

Foundation Differential Settlement Included Time-dependent Elevation Control for Super Tall Structures

  • Zhao, Xin;Liu, Shehong
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.1
    • /
    • pp.83-89
    • /
    • 2017
  • Due to the time-dependent properties of materials, structures, and loads, accurate time-dependent effects analysis and precise construction controls are very significant for rational analysis and design and saving project cost. Elevation control is an important part of the time-dependent construction control in supertall structures. Since supertall structures have numerous floors, heavy loads, long construction times, demanding processes, and are typically located in the soft coastal soil areas, both the time-dependent features of superstructure and settlement are very obvious. By using the time-dependent coupling effect analysis method, this paper compares Shanghai Tower's vertical deformation calculation and elevation control scheme, considering foundation differential settlement. The results show that the foundation differential settlement cannot be ignored in vertical deformation calculations and elevation control for supertall structures. The impact of foundation differential settlement for elevation compensation and pre-adjustment length can be divided into direct and indirect effects. Meanwhile, in the engineering practice of elevation control for supertall structures, it is recommended to adopt the multi-level elevation control method with relative elevation control and design elevation control, without considering the overall settlement in the construction process.

Development of a Machine Control Technology and Productivity Evaluation for Excavator (굴착기 머신 콘트롤 기술 개발 및 생산성 향상 평가)

  • Lee, Min Su;Shin, Young Il;Choi, Seung Joon;Kang, Han Byul;Cho, Ki Yong
    • Journal of Drive and Control
    • /
    • v.17 no.1
    • /
    • pp.37-43
    • /
    • 2020
  • An intelligent excavator can be divided into Machine Guidance (MG), semi-automatic, and unmanned by technology. The MG technology excavator is equipped with a tilt sensor on each link of the excavator and a GPS is installed on the excavator body to inform the user of the position of the excavator bucket end. Machine control (MC) technology that assists the user's work can be divided into semi-automatic and fully automatic technology. The semi-automatic MC equipment has already been commercialized by Komatsu and Caterpillar. The MC excavator is equipped with an electro-hydraulic system, sensors and controllers to control the excavator bucket end according to the user's needs. In this study, the semi-automated excavator modified based on manual excavator, is equipped with an electro-hydraulic system, a controller system, multi-sensors and a control algorithm is developed to assist in excavation work such as leveling and grading. By applying the developed technology, it was possible to confirm productivity improvement compared to manual digging and leveling work. In the future, further research to improve the accuracy of the hydraulic precision control and collaborative work with heterogeneous construction equipment such as dump truck and automated collaboration tasks technology could be developed.

REDUCTION OF SEDIMENT-LADEN WATER FROM CONSTRUCITON SITES INTO WATERWAYS:- A GOVERNMENT AND INDUSTRY APPROACH

  • Teo Ee Huat
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.285-291
    • /
    • 2009
  • Water is a strategic resource for Singapore due to its small land mass and more than half of the mainland serves as catchment for raw water, including construction sites. Construction site typically involves earthworks and in conjunction with the frequent and intense rainstorm in Singapore, produce runoff of high turbidity due to suspended sediments. The resulting high concentration of suspended sediment in construction site runoff very often leads to aesthetically unpleasant reservoirs and potentially increases the treatment cost of raw water. To mitigate this, the local standard requires the discharged concentration of total suspended solids of construction runoff leaving a construction site to be less than 50mg/l which is a very high standard. This paper will present, examine and discuss particular issues and practices of Singapore's construction industry in meeting this requirement. The focus will be on two areas: Government lead initiatives and industry practices. How the government agencies worked together with the industry professionals to develop a system to ensure meeting of the standard is discussed. In addition, the types of industry practices, including various Best Management Practice to reduce erosion in construction sites and implement effective sedimentation on construction sites are examined.

  • PDF

A Study on the Method of Preliminary Works Management for a Schedule Performance Management (공정이행관리를 위한 선행작업관리 시안)

  • Park, Hong-Tae;Song, Young-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.3
    • /
    • pp.757-764
    • /
    • 2008
  • It is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the qualify and schedule management of the construction, We can make systematically preliminary works in accordance with construction schedule by the architecture construction items of the apartment house construction. We suggested important preliminary control item by the workers through experiential method of construction engineers in accordance with network schedule. should not use "we" in technical sentence.

A Study on the Quality Control Plan for Waterproof Construction in Apartment Houses (공동주택 방수공사 품질관리 방안 마련에 관한 연구)

  • Kim, Kwang-Ki;Kim, Byoungil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.109-120
    • /
    • 2024
  • For successful waterproofing construction, it is very important to secure construction quality as well as material performance of waterproofing materials used in construction. Due to the long-term cost reduction policy following the economic downturn in the construction market, most construction companies are using general low-priced waterproof materials rather than high-quality waterproof materials without clear quality control standards. Without clear education on construction, construction is being carried out with meaning only on construction activities. In addition, the waterproofing method applied in combination is a situation where water leakage occurs due to waterproofing failure due to insufficient construction quality because the construction method is complicated. Therefore, it is necessary to review the quality control measures(design, materials, construction) for successful waterproofing work and improve problems that are derived so that stable waterproofing work can be done. In order to expect the leakage prevention effect of a building, first, it is required to select appropriate materials for each part of the building and environment in the design stage, and the selected materials must satisfy all items of the Korean Industrial Standard(KS). Second, to secure the quality of waterproofing construction, sincere construction by workers is required. In this paper, we tried to describe "review of waterproof design", "constructor education", "site inspection", and "criticism(correction/supplementation)" as quality control measures after material selection.

Importance Ranking of Accident Factors of Remote Control Tower Crane by AHP (AHP 분석에 의한 무인타워크레인 사고 요인의 중요도 순위)

  • Kim, Ju-Yong;Jung, Young-Chul;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.497-504
    • /
    • 2020
  • In Korea construction industry, researches are being conducted to reduce the disasters related tower crane due to the increase of tower crane's usage and accidents continuously. Although the usage amount of remote control tower crane has been increasing recently, the research on remote-control tower crane is insufficient. In this study, the importance ranking of remote control tower crane's accident factors derived by AHP analysis. AHP questionnaire was conducted to engineers (or operators) like construction site engineer, construction manager, safety engineer, and tower crane operator, who have more than 10 years career. The results of AHP analysis reveal that top ranking factor of remote control tower crane's accident is lifting work for materials. Therefore, the high importance factors should be managed, and taken the priority measures for reducing the tower crane accidents by using the results of this research.