• Title/Summary/Keyword: construction control

Search Result 5,207, Processing Time 0.029 seconds

Combined Effects of Groundwater Abstraction and Irrigation Reservoir on Streamflow (지하수 이용과 농업용 저수지가 하천유량에 미치는 복합 영향)

  • Kim, Nam Won;Lee, Jeongwoo;Chung, Il Moon;Lee, Min Ho
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.7
    • /
    • pp.719-733
    • /
    • 2013
  • In this study, a watershed-based surface-water and groundwater integrated model, SWAT-MODFLOW was used to evaluate streamflow depletion induced by groundwater withdrawals and irrigation reservoirs for the Juksan-cheon watershed in South Korea. The streamflow responses to groundwater pumping and irrigation reservoirs were simulated under several different scenarios. The scenarios were (1) current pumping well withdrawals with reservoirs; (2) current pumping well withdrawals without reservoirs; (3) no pumping well withdrawals with reservoirs; (4) no pumping well withdrawals without reservoirs (natural condition). The simulated results indicated that the effects of groundwater pumping on streamflow depletion are a little more significant than those of irrigation reservoirs. Particularly, the groundwater withdrawals with irrigation reservoirs at current status (scenario 1) has induced the decrease of more than 20% in drought flow against the natural condition (scenario 4) at the outlet of the watershed. The specific drought flows through the main stream of Juksan-cheon watershed were simulated in order to assess the irrigation effects on downstream flows. It was found out that the specific drought flows are increasing as the distance from the reservoir increases due to the accumulation of the return flows to stream.

Evaluation of Flexural Behavior of Hollow Prestressed Concrete Pile for Continuous Pile Wall (주열식 벽체용 중공 프리스트레스트 콘크리트 파일의 휨거동 평가)

  • Lee, Young-Geun;Jang, Min-Jun;Yoon, Soon-Jong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.3
    • /
    • pp.20-27
    • /
    • 2014
  • In the construction site, various earth retaining systems are developed and applied to maintain stability of excavated area and structures. Among the methods, the underground continuous wall and the column-type diaphragm wall methods are especially used in construction site nearby buildings or roads. However, these methods have some disadvantages such as the difficulty of quality control and long curing time because these methods need to cast fresh concrete at the construction site. In addition, these methods are usually applied to the site for the temporary purpose. In this paper, we suggest precast hollow prestressed concrete pile for continuous pile wall system. To investigate the structural behavior of suggested pile, which is the main member of the suggested system, tests pertaining to the structural behavior and prestressing force applied in the pile are conducted. From the test results, it was found that the prestressing force measured is sufficient compared with the value obtained by the design equation and the cracking moment measured is 34% higher than the design value. In addition to the above, this precast hollow prestressed concrete pile has an additional safety margin that the maximum moment is 59.2% higher than the cracking moment which is one of the serviceability limits for the design of the system.

Improvement of the Code Classification Structure in Piping Material Management for Petrochemical Plant Projects (석유화학 플랜트의 효율적 배관자재 관리를 위한 코드분류체계 개선)

  • Lee, Jong-Pill;Moon, Yoon-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.1
    • /
    • pp.39-49
    • /
    • 2015
  • The objective of this study is to improve the classification structure of commodity code for piping material management which is considered as the fundamental of commodity code and piping material management system. It enhances the efficiency of piping material management directly or indirectly affecting the engineering, procurement and construction in a petrochemical plant projects. To establish an improved code classification structure, this study identifies the problems of former code classification structure in details, as well as the characteristics of other domestic and global EPC company's code classification structures and presents the improved direction considering the recently mega-sized and specialized projects. Accordingly, to efficiently enhance piping material management, the improved code classification structures have been derived from defining suitable code classification structure for specific piping component, adding more standard attribute, expanding the number of code digits and classifying code hierarchy. The results of applying the improved classification structure of commodity code to on-going project have led to reduce the rate of rework from 4.98% to 2.48% for developing purchase description and also have saved working time for executing piping design by 3D modeling from 6 months by two persons to 4 months by a person which is decreased 67% consequently. In addition, the structures of pyramid code management have resulted to accumulation and analysis of the various piping data for other disciplines such as procurement and estimation team which require commodity code information through the company's material control system.

  • PDF

Development of the Program Management System for Mega Project in Urban Regeneration (도시재생사업의 메가프로젝트 건설관리시스템 개발)

  • Hyun, Chang-Teak;Kim, Ju-Hyung;Park, Il-Soo;Yu, Jung-Ho;Son, Bo-Sik;Hong, Tae-Hoon;Seo, Yong-Chil;Lee, Sang-Bum;Kim, Hyoung-Kwan;Kim, Chang-Wan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.176-183
    • /
    • 2008
  • Recently, several large-scale Mega-Projects are being conducted. For these urban revitalization projects which requires many complex functions, the existing project management system based on single project level is limited in application. Therefore, our main objectives of this research are two 1) Develop a brand-new program management system(Prototype Ver 1.0) for mega-projects where various facilities are combined both horizontally and vertically. 2) Develop management strategies(Prototype Ver 1.0) based on the program level that enable the comprehensive management of a multiple various projects. The subtitles of this Research are i-PMIS(Program Management Information System) Development, Standardization & Optimization of Construction Life-Cycle Process, Comprehensive Project Cost & Process Management Technology, Effective and Optimized Integrated Performance Management Technology, and, we suggest to optimize the whole life cycle process, predict and respond to various risks, predict and control the process, the cost and the schedule, achieve maximum return on investment to the participating parties, and provide a brand-new Program-MIS including the visual-based web-portal platform to respond the changing business environments and decision making.

  • PDF

Evaluation of Field Application for the Developed Retrofitting Process and Analysis of Bacterial Community Structure in Pilot Plant (하수처리장 Retrofit 공정의 현장적용성 평가 및 세균 군집 분포 연구)

  • Kim, Mee-Kyung;Hong, Jun-Hyeok;Kim, Youn-Kwon;Ahn, Tae-Seok;Shin, Eung-Bai
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.28 no.3
    • /
    • pp.240-248
    • /
    • 2006
  • In this study, a retrofitting BNR process that was modified for the economical applicability was proposed and evaluated in the pilot plant($50m^3/d$). At the same time the bacterial community structure was investigated in the pilot plant by using FISH(fluorescent in situ hybridization) method. Economically 16% of the initial construction cost for the proposed process(introduction of a biological nutrient removal process of $60,000m^3/d$ scale basis) was reduced due to the absence of a bioreactor. Water treatment efficiencies and maintenance facilities of the modified process were satisfied with the strengthened discharge permits in Korea throughout a long term pilot plant operating including a winter season. Bacterial populations in the pilot plant and in the control plant(A2/O process, B SIP(Sewage Treatment Plant)) were remained uniformly during the test period, but bacterial structure in the bioreactor was changed drastically. Proportions of ${\beta}$-proteobacteria group including soil bacteria which play a important role in wastewater treatment increased $25{\sim}607%$ in population.

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

An Experimental Study on the Heat Storage Properties of Phase Change Material Using Paraffin Sheets in Building (파라핀을 이용한 건축용 시트형 잠열축열재의 축열특성에 관한 실험적 연구)

  • Ko, Jin-Soo;Kim, Byung-Yun;Park, Sung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.435-441
    • /
    • 2011
  • The life cycle assessment on greenhouse gas emission of reinforced concrete buildings shows that more than 70 percent of greenhouse gas that is discharged by a building is discharged in the building maintenance stage, including cooling and heating. To reduce the greenhouse gas emission, maintenance planning to minimize the energy consumption is necessary in the design stage. In this paper, two heat storage rooms are tested to save the air cooling energy of the buildings. The specimens are essentially identical, except that chamber A contained paraffin sheets as the finishing material, while the other, chamber B, served as a control. The test results show that chamber A with the paraffin sheets exhibited less temperature change than chamber B without the sheets when temperature was increased outside of the specimens. The heating energy was probably consumed in the phase change of the paraffin sheets, which can be useful for reducing energy consumption related to air cooling during the summer.

Analysis of Effects of Groundwater Abstraction on Streamflow for Sinduncheon Watershed (신둔천 유역에 대한 지하수 이용이 하천유량에 미치는 영향 분석)

  • Kim, Nam Won;Lee, Jeongwoo;Chung, Il Moon;Sung, Gee Youne
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.12
    • /
    • pp.1259-1273
    • /
    • 2012
  • In this study, a watershed-based surface water and groundwater integrated model, SWAT-MODFLOW was used to quantify the stream flow depletion due to groundwater pumping for the Sinduncheon watershed. Complex water use conditions such as water taken from a stream, sewage disposal release, irrigation from agricultural reservoir, groundwater pumping were considered for simulations. In particular, the model was revised to reflect the effects of reservoir operation and return flow from the used groundwater on streamflow variation. The simulated results showed that the groundwater pumping at current status has induced the decrease of more than 10% in annual average streamflow and 40% in drought flow at the outlet of the Sinduncheon watershed, The simulated results also revealed that the vast water withdrawals at green house areas during winter season have dramatically changed streamflow from April to June. The streamflow depletion was mainly attributed to pumping wells located within the distance of 300 m from the stream for Sinduncheon watershed.

A Study of the Reduction of the Floor Impact Sound by Applying RC structural frames (Girders and Stirrups) to the Wall Structures of Apartment Buildings (철근 콘크리트 라멘조 보 배근과 스트럽을 적용한 공동주택 벽식 구조의 슬래브 바닥충격음 저감 방안)

  • Shin, Ki Jun;Lee, Kyung Ryun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.95-101
    • /
    • 2022
  • This study attempts to identify the ways of reducing the floor impact sound, by applying six different types of the reinforced bar girders and stirrup arrangements to the Structure: (1) the longer-direction girder arrangements (2) the shorter-direction girder arrangements (3) the diagonal-direction arrangements (4) the longer-direction girder arrangements with stirrups (5) the shorter-direction girder arrangements with stirrups (6) the diagonal-direction arrangements with stirrups. In order to identify the most effective structural changes, each slab was tested with bang machines, measuring the level of the sound impact. The results showed that the longer-direction girder arrangements with stirrups were the most effective one. In addition, the effectiveness of slab was found to be remarkable, showing the level of minimum 1dB to maximum 5dB, where the slab was compared with the control models without girders and stirrups. In conclusion, it is suggested that the longer-direction girder arrangements with stirrups could possibly be applied to the Wall Structures to minimize the floor impact sound.

Compressional and Shear Wave Properties of Cement Grout Including Carbon Fiber (탄소섬유를 포함한 시멘트 그라우트의 압축파 및 전단파 특성)

  • Choi, Hyojun;Cho, Wanjei;Yune, Chanyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.12
    • /
    • pp.15-24
    • /
    • 2021
  • In Korea, which is mostly mountainous, the proportion of tunnel and underground space development are increasing. Although the ground is reinforced by applying the ground improvement method during underground space development, accidents still occur frequently in Korea. In the grouting method, a representative ground reinforcement method, the effect was judged by comparing the total amount of injection material with the amount of injection material used during the actual grouting construction. However, it is difficult to determine whether the ground reinforcement is properly performed during construction or within the target ground. In order to solve this problem, it is necessary to study a new method for quality control during or after construction by measuring electrical resistivity after performing grouting by mixing carbon fiber, which is a conductive material, and microcement, which is a grout material. In this study, as a basic study, a cement specimen mix ed with 0%, 3%, 5%, 7% of carbon fiber was prepared to evaluate the performance of the grout material mixed with carbon fiber, which is a conductive material. The prepared specimens were wet curing for 3 days, 7 days, and 28 days under 99% humidity, and then compression wave velocity and shear wave velocity were measured. As a result of the compression wave velocity and shear wave velocity measurement, it showed a tendency to increase with the increase in the compounding ratio of carbon fibers and the number of days of age, and it was confirmed that the elastic modulus and shear modulus, which are the stiffness of the material, also increased.