• Title/Summary/Keyword: construction control

Search Result 5,209, Processing Time 0.034 seconds

Interaction Analysis between Tapered Sectional Launching Nose and Superstructure Section of ILM Concrete Bridge (변단면 압출추진코와 ILM 교량 상부단면의 상호작용 해석)

  • Lee Hwan-Woo;Jung Du-Hwoe;Ahn Tae-Wook
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.19 no.2 s.72
    • /
    • pp.139-150
    • /
    • 2006
  • ILM(incremental launching method) bridge is one of the prestressed concrete bridge construction methods widely adopted owing to its effectiveness for the quality control. The sections of the launched superstructure pass every position of the bridge spans. This launching process causes the bridge sections to be experienced in the quite different stress states with the stress state occurred after construction completely. Due to the self weight of sections, particularly, the superstructure sections(deck) experience maximum positive and negative moment as well as maximum shear force during launching process. To minimize the temporarily caused sectional forces, launching nose is generally used in the construction method. Therefore, the magnitude of this sectional forces should be checked for the safety of super structure in construction and it is dependent on the structural characteristics of launching nose. In this study, the simplified formulas to analyze the sectional force occurred by the nose-deck interaction in ILM construction are developed. The considering parameters are the span length ratio, stiffness ratio and weight ratio between the launching nose and the super structure. In particular, the developed formulas can consider the tapered sectional shape of launching nose and the diaphragm wall in the superstructure. Additionally, the sensitivity analysis is performed to analyze the effects of nose-deck interaction according to the design parameters.

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

Design and Construction of a 1:5 Scale 10-Story R.C. Apartment Building Model for Earthquake Simulation Tests (지진모의실험을 위한 10층 R.C. 공동주택의 1:5 축소모델 설계 및 시공)

  • Hwang, Seong-Jun;Lee, Kyung-Bo;Kang, Chang-Bum;Lee, Han-Seon;Lee, Sang-Ho;Oh, Sang-Hoon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.15 no.6
    • /
    • pp.55-66
    • /
    • 2011
  • The purpose of this study was to develop an efficient process in the design and construction of a 1:5 scale 10-story R.C. apartment building model for an earthquake simulation test. The reduction ratio of the specimen was determined by the size ($5m{\times}5m$) and pay load (600kN) of the available shaking table and the availability of model reinforcements. For efficiency and quality control of the reinforcement work, prefabrication was used. Construction was conducted in two steps, the wall in one step, and another step for the slab, because it was impossible to remove the formwork of a wall if the walls and slabs in a story were constructed in one step. The slip form construction method was used repetitively for walls. The formwork of a wall was made with veneer and acryl plate on each side, so it was possible to check the quality of the concrete placing. To construct this model, it took roughly six months with five full-time research assistants, for a total of 602 man days of labor in construction.

Engineering Characteristics of Liquid Filler Using Marine Clay and In-situ Soil (해양점토와 현장토를 활용한 유동성 채움재의 공학적 특성)

  • Oh, Sewook;Bang, Seongtaek
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.9
    • /
    • pp.25-32
    • /
    • 2020
  • The underground utilities installed under the ground is an important civil engineering structure, such as water supply and sewerage pipes, underground power lines, various communication lines, and city gas pipes. Such underground utilities can be exposed to risk due to external factors such as concentrated rainfall and vehicle load, and it is important to select and construct an appropriate backfill material. Currently, a method mainly used is to fill the soil around the underground utilities and compact it. But it is difficult to compact the lower part of the buried pipe and the compaction efficiency decreases, reducing the stability of the underground utilities and causing various damages. In addition, there are disadvantages such as a decrease in ground strength due to disturbance of the ground, a complicated construction process, and construction costs increase because the construction period becomes longer, and civil complaints due to traffic restrictions. One way to solve this problem is to use a liquid filler. The liquid filler has advantages such as self-leveling ability, self-compaction, fluidity, artificial strength control, and low strength that can be re-excavated for maintenance. In this study, uniaxial compression strength test and fluidity test were performed to characterize the mixed soil using marine clay, stabilizer, and in-situ soil as backfill material. A freezing-thawing test was performed to understand the strength characteristics of the liquid filler by freezing, and in order to examine the effect of the filling materials on the corrosion of the underground pipe, an electrical resistivity test and a pH test were performed.

Application of the convergence-confinement method of tunnel design to rock masses (암반 터널에서의 시공단계를 고려한 암반-지보 거동특성 곡선적용에 관한 연구)

  • Lee, Du-Wha;Choo, Seok-Yean;Lim, Sang-Bin;Park, Young-Jin;Ahn, Sung-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.2
    • /
    • pp.143-153
    • /
    • 2002
  • Convergence Confinement Method (CCM) makes a more simple judgement in a ground-support reaction than numerical method. Also this method is good for the applicability of construction feedback and the analysis of field measurement. However, there has been little research with respect to the application of CCM in tunnel construction. One of the problems in CCM is a decision of the time to support installation. To decide a reasonable supporting installation time, support characteristic curve and displacement characteristic curve considering construction stage are proposed. In addition, to predict displacement distribution ratio and load distribution ratio, the time dependent support reaction curve is used. Finally, through a comparison of the result between CCM and numerical analysis, the trust of this study is proved and the practical application is proposed to control resonable tunnel construction management.

  • PDF

Development Of EPC Project Management Procedure Manual System For Plant Project Management (플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발)

  • Park, Bum-Jin;Lee, Min-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.487-491
    • /
    • 2006
  • As Korea has been industrialized high recently, the constructional plant part which is the major driving force to Korean economic growth is being developed. In spite of the great importance, there are many ill-prepared parts in EPC project management procedure, and working in practice of EPC project management procedure manual is not systematic. That is why the governmental progressive policy on the relevant technology and the establishment of EPC project management procedure are needed. This study was aimed to derive reform measures by analyzing problems of EPC project management procedure manuals which are in use at 13 large-sized construction companies currently. The reform measures which are based on the theory of PMI(Project Management Institute)'s PMBOK(Porjcet Management Body Of Knowledge) are about deriving administration factors to control the project, and EPC project administration factors are derived from the definition of CMAA(Construction Mangement Association of America). The reformed electronic EPC project management procedure manual system is set up by standardizing derived administration factors.

  • PDF

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

Real Time Safety Management Framework at Construction Site based on Smart Mobile (스마트모바일 기반의 실시간 현장안전관리 프레임워크)

  • Park, Moonseo;Kim, Euijun;Lee, Hyun-Soo;Lee, Kwangpyo;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.3-14
    • /
    • 2013
  • Recently, as the size of construction projects is getting bigger and higher, construction disasters have been being serious such as death, also it is hard to manage efficiently since there are plenty of informations about safety management. Thus on the spot & real time safety management is required and one of the ways to support these needs, conjunction with Information Technology(IT) has been being noticed. Accordingly, Personal Digital Assistant(PDA), Palmtop Computer and Tablet Personal Computer and so on have been adopted. However another inefficient sides are showed up such as limitation of equipment(weight, inconvenience of control and others). Meanwhile, exchanging and processing data are improved at wide area due to advance of mobile communication and introduction of smart mobile, which is a simple and convenient, is a proven at many aspects. In this research, to support effective safety management, the framework is realized in connection with smart mobile with finding the problems of safety management and deriving demands. Two smart mobile applications, which are Safety Management application and Safety Guideline application, enable that safety management in real time, less re-work and using safety information.

구조물 축소 모형시험과 수치해석에 의한 구조물 안전도 평가

  • 이명규
    • Computational Structural Engineering
    • /
    • v.11 no.1
    • /
    • pp.80-89
    • /
    • 1998
  • 본 기사에서는 기존 구조물의 구조를 변경하여 사용하는 경우 구조물 축소모형시험과 수치해석을 이용하여 안전도를 합리적으로 평가하는 절차에 관하여 지하철 정차장 구조물을 예로하여 살펴보았다. 구조물의 안전도를 평가하기 위한 구조물 축소모형 시험에서는 원형구조물의 실제 거동을 나타내는 모형의 제작이 가장 중요한 사항이다. 이를 위해서 적절한 상사율을 가지는 구조재료의 선정, 합리적인 경계조건의 설정, 실제하중을 고려한 재하방법 등을 결정하여야 한다. 구조재료의 선정과 모형의 축소율은 모형구조의 거동이 탄성범위 내인가 또는 극한거동인가에 따라 결정되는 것이 일반적이다. 안전도 평가를 위한 모형구조물의 제작과정에서는 원형구조물 거동을 수치해석을 통하여 예측하는 과정이 필요하며 이러한 사전해석(pre-analysis)을 통하여 구조물의 개략적인 거동과 측정항목을 정하며, 또한 합리적인 재하방법을 결정하게 된다. 모형구조물에 대한 재하시험을 통하여 원형구조물의 거동을 상사비를 적용하여 바로 예측할 수 있으나 재하하시험후 측정된 사항에 대하여는 모형구조물에 대한 사후해석(post-analysis)를 수행하여 측정값과 비교 검토하여 거동의 일치성을 입증하는 것이 일반적이다. 이런 과정을 거쳐 검증된 수치해석모델을 이용하여 실험에서 고려하지 않은 여러가지 하중조건에 수치적으로 검토할 수 있으며, 이를 이용하여 안전도검토와 적절한 대책을 수립할 수 있게 된다. 사전해석-모형시험-사후해석의 절차에 따른 구조물의 모형실험의 사례는 미국과 유럽에서 찾아볼 수 있으며 이를 통하여 수치해석기법의 발전이 이루어지고 있다. 현재까지 우리나라에서는 구조물 모형실험에 관련된 연구가 활발하지 못한 편이며, 상대적으로 경험이 적게 축적되어 있는 실정이다. 그러나 수치해석기법의 발전과 실제구조물의 안전도를 합리적으로 파악하기 위해서는 구조물모형 실험이 필수적이며 앞으로 연구가 활발히 이루어져야 할 분야로 사료된다.leic acid와 palmitic acid가 주요 지방산이었으나 싸리버섯은 중성지질에서 oleic acid의 함량이 높았다.n the part of special landscape management area, it is necessary to introduce landscape impact assessment system to more effective landscape management.ch served as supporting organizations. The control of the construction and management of the royal garden and landscape was held by decision makers, executors of works and management. 2) The general process of the construction and management of the royal garden and landscape included Sangji and Kyuho다 as the first step; In case of buildings and facilities, according to former examples and drawings, the most of the planning and design was already fixed. In the case of landscape, those things aimed at construction according to the existing lie of the land. The works in the 2nd step; This process was divided into the construction of facilities and planting. In case of construction of facilities, those works were done by Togam and

  • PDF