Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

Development of Scheduling System for Production of the Hydraulic Control Valve of Construction Equipment (건설기계 유압밸브 생산을 위한 일정계획 시스템 개발)

  • Kim, Ki-Dong;Lee, Bo-Hurn
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.61-67
    • /
    • 2007
  • The construction machine is the composite machine assembled by about 30,000 parts. Excavator, one kind of a construction machine, plays the leading role for export of construction equipment. It is generally impossible to produce all of the items within one company. Especially the supply of hydraulic control valves, one of the core part of the construction equipment, depends on the import heavily. So it is important to make an efficient production plan of hydraulic control valves in the company. The most important thing for the production scheduling of a hydraulic control valve is to make production schedule keeping the start date for assembly line for an excavator and to make minimization of the stock level. The production plan of hydraulic control valve includes the decision of the quantity supplied by subcontractor. This paper presents a scheme for a scheduling system of the hydraulic control valve considering the schedule of the assembly line for excavator production. This paper provides a methodology, which can make a plan of supply and production and generate a detailed schedule for daily production.

  • PDF

A Study of Redundant Design of a Control Rod Control System (제어봉 구동장치 제어시스템의 다중화 설계에 관한 고찰)

  • Sur, Joong-Surk;Cho, Chang-Ho;Yook, Sim-Kyun;Nam, Chae-Ho;Moon, Tae-Sun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2337-2339
    • /
    • 2003
  • Digital technologies are required to reduce to events due to human fails clarified existing nuclear power plant. When we are trying to retrofit control rod control system from analog system to digital one, new communication network and controller is required to be constructed. In this paper, we are going to introduce experience in developing economic and reliable control rod control system construction. this proposed system consists of redundant POS, communication network, and controller to provide enhance reliability and safety.

  • PDF

An IPA-based Evaluation of 3D Scanning Technology Application for Quality Control in Modular Construction Projects (IPA 분석을 통한 3차원 스캐닝의 모듈러 건축 프로젝트 품질관리 적용에 관한 연구)

  • Lee, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.471-482
    • /
    • 2024
  • Modular construction, a prominent method in the evolving construction industry, necessitates robust quality control for successful implementation. This study investigates the potential of 3D scanning technology for enhancing quality control processes in modular building construction. Through an IPA analysis of major construction projects across factory production, transportation, and on-site stages, the study evaluates the current state of 3D scanning application in modular construction quality control. Results indicate a high demand for 3D scanning data across various quality control aspects. However, certain limitations in technology and practical application were identified. The findings of this research contribute to the advancement of 3D scanning technology in modular construction and inform future research on cutting-edge quality control strategies.

THE RELIABILITY PREDICTION OF CONTROL CABINET OF CONTROL ROD CONTROL SYSTEM (제어봉 제어 시스템의 제어함에 대한 RBD 분석)

  • Jung, Hae-Won;Sur, Jung-Suk;Yook, Sim-Kyun;Nam, Jung-Han
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2055-2057
    • /
    • 2003
  • This paper describes the results of RBD(Reliability Block Diagram) analysis of control rod control system, which is being developed as part of KNICS project. The results of RBD indicate unavailability of control cabinet for control rod control system. A purpose of RBB is to evaluate unavailability of control cabinet, identify the design drawbacks of control cabinet, and propose design improvement to a designer to help design the more reliable control rod control system. This RBD defines the logical interaction of failure within a system.

  • PDF

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction (초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델)

  • Nam, Chulu;Kwon, Jaebeom;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

Development and performance evaluation of Machine Control Kit mountable to general excavators (일반 굴삭기 장착 가능한 머신 컨트롤 키트 개발 및 성능 평가)

  • K.S. Lee;K.S. Kim;J.B. Jeong;E.S. Pak;J.I. Koh;J.J. Park;S.H. Joo
    • Journal of Drive and Control
    • /
    • v.21 no.1
    • /
    • pp.31-37
    • /
    • 2024
  • In this study, to prevent accidents in underground facilities during excavation, we developed a Lv.3 automated control system that can be configured as an electronic control system without changing the existing hydraulic system in a general excavator and utilized digital map information of underground facilities. We aimed to develop a strategy to prevent accidents caused by operator error. To implement this, a real-time excavator bucket end position recognition and control system was developed through angle measurement of the boom, arm, and bucket using an electronic joystick, RTK-GPS, and angle sensors. In addition, excavators are large, machine-based equipment, and it is difficult to control overshoot due to inertia with feedback control using position recognition information of the bucket tip. Therefore, feed-forward control is used to calculate the moving speed of the bucket tip in real-time to determine the target position. We developed a technology that can converge and verified the performance of the developed system through actual vehicle installation and field tests.

A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.

Comparative Analysis of Wastewater Management Technologies for Construction Sites (건설사업장의 수질관리 기술 적용사례 비교분석)

  • Yi, JongChan;Koo, Jakon
    • KIEAE Journal
    • /
    • v.13 no.2
    • /
    • pp.157-162
    • /
    • 2013
  • To deal with the water pollution arising from the construction site, this study raises the issues of management and laws and it suggest the efficient way to reduce water pollution by through the case studies. In order to study, seven cases were selected from "Construction Environmental Management Best Practice Competition" co - sponsored by Construction Association of Korea and Construction Environment Association. As a study result, there are problems that depending on the characteristic of the construction site environment simple alone settling facilities can not handle muddy and dirty water generated by the construction site. However, when the construction site applied improved water pollution control facilities with reflecting the characteristic of muddy and dirty water. The problem can be solved moreover it can achieve exceeded emission standard. Therefore new regulations and management with water pollution control facilities considering characteristic of environment is needed to cope with water pollution arising from the construction site.