• Title/Summary/Keyword: construction control

Search Result 5,207, Processing Time 0.039 seconds

A Study on the Power Demand using Program Control Method in Office Building (프로그램제어방식을 이용한 건물 전력수요 관리기법)

  • Choi, Do-Hyuk;Kim, Se-Dong;Ryu, Seung-Ki;Song, Eon-Bin
    • Proceedings of the KIEE Conference
    • /
    • 1994.07a
    • /
    • pp.106-109
    • /
    • 1994
  • The object of this study is to propose the simplified power demand control system which is appliable to existing buildings or new buildings. Through the technical survey and power demand analysis in office buildings, the electric facilities which can be controlled are selected. Power demand control program can be controlled the electric facilities in order, and displayed the facility operation state. The proposed power demand control system is cost-effective and flexibly adoptable in system upgrade or retrofit.

  • PDF

Performance Evaluation of Water Vapour Adsorption & Desorption Properties of Low-Priced Generic Ceramic Panel Materials for Humidity Control - Focuses on analyzed measurements of temperature and humidity obtained from the housing units - (저가보급형 습도조절용 세라믹패널의 조습성능 평가 - 리빙랩 온·습도 모니터링 분석을 통한 실측결과를 중심으로 -)

  • Jang, Kun-Young;Ryu, Dong-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.39-40
    • /
    • 2017
  • This study aims to evaluate the humidity control performance of low-priced generic ceramic panels that are used to control humidity. Temperature and humidity are monitored by using 'Living Lab' and the change of indoor relative humidity is measured and analyzed. According to the results of the study, the indoor relative humidity of rooms installed with ceramic panels was found to be low compared to that of living rooms by 2.2%RH (test period) and 3.2%RH (daily). In the case of maximum relative humidity, rooms installed with ceramic panels were found to be low by 6.9%RH. The results are attributable to the humidity absorption of ceramic panels. Accordingly, future ceramic panels need the improvement of performance and an appropriate construction area should be derived depending on indoor space.

  • PDF

A Review on Intelligent Compaction Techniques in Railroad Construction

  • Oh, Jeongho
    • International Journal of Railway
    • /
    • v.7 no.3
    • /
    • pp.80-84
    • /
    • 2014
  • The purpose of this paper was to review Intelligent Compaction (IC) techniques, which is regarded relatively new to the railroad roadbed construction activity. Most of civil structures are built on roadbed that supposed to provide adequate load bearing support to the upper structure through the qualified compaction process. However, it is not uncommon for structure failure attributed to inadequate compaction control take place in field sites. Unlike traditional compaction control method to check field density at several locations, IC techniques continuously measure various compaction quality indices that represent compaction uniformity. In this paper, a series of literature review relevant to IC techniques was conducted to provide concise summary on the following categories: 1) background of IC technique; 2) Summary of IC vendors and basic principles; 3) modeling of IC behavior, and 4) case study along with correlation between IC with other measurements. In summary, IC technologies seem to be promising in future railroad construction to achieve better compaction quality control so that the serviceability of railroad can be ensured with minimizing rehabilitation and maintenance activities.

Development of Remote Valve Control System with Power Line Communication (전력선 통신 및 제어기능을 구비한 원격 밸브 제어시스템 개발)

  • Moon, Hyeong-Soon;Kim, Jong-Cheol;Lee, Byeong-Yeol;Kim, Yong-Baek;Kim, Jee-On
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.71-79
    • /
    • 2009
  • The world-wide ship construction market is forecast that the considerable portion of shipbuilding and oceanic plant industry will be transferred consequently in China after 5 or 10 years. This point of view where the Korean ship construction industry seizes the initiative from the world-wide ship construction/oceanic field, we must cultivate technical power of base technology, and focus our interests on the development of core parts. In this study, our proprietary remotely operated valve actuator system with power line technology was developed to enhance the installation and commissioning process by our own technology. This paper describes the new design and functions of the remotely operated valve system for shipbuilding and offshore market especially for FPSO.

  • PDF

Anti-islanding Method by Harmonic Injection for Utility Interactive Inverter with Critical Load (중요부하를 갖는 계통연계형 인버터의 고조파주입에 의한 단독운전방지 기법)

  • Oh, Hyeong-Min;Choi, Se-Wan;Kim, Tae-Hee;Lee, Gi-Pung;Lee, Tae-Won
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.17 no.4
    • /
    • pp.315-321
    • /
    • 2012
  • The utility-interactive inverter with critical loads should supply continuous and stable voltage to critical loads even during the grid fault. The conventional control method which performs current control for grid-connected mode and voltage control for stand-alone mode undergoes the critical load voltage variation during grid fault. The critical load voltage may have large transient when the inverter performs mode transfer after the islanding detection. Recently, the indirect current control method which does not have the transient state during not only islanding detection but also the mode transfer has been proposed. However, since the voltage control is maintained even during the grid-connected mode it is difficult to detect the islanding. This paper proposes an active anti-islanding method suitable for the indirect current control method which does not have NDZ(Non-Detection Zone).

The State of Schedule Management and the Recognition of Duration Shortening (공정관리의 실태 및 공기 단축에 대한 인식정도)

  • Kim, Ja-Yeon;Kim, Eui-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.87-94
    • /
    • 2010
  • Construction projects are based on the actual field, so if the construction schedule that is established in the construction plan is delayed or extended for various reasons, construction companies are vulnerable to claims, and thus strive to complete a building within the planned timeline by shortening the construction time. Therefore, this study surveyed technicians in apartment construction in Gwangju, and studied their perceptions of the actual conditions of process control, construction time needs, goals, and methods. The results showed that the organization of the process control department and professional employees was lacking compared to other regions. The need for construction time was perceived as high, while the reduction of the construction cost was perceived as low. Regarding the reduction goal, they perceived highly the preparation for the delay of construction time and various claims, and for the reduction method, they mentioned the extension of working hours and the increase in employees. Based on the results of this study, technicians should consider that a reduction of construction time not only can make up for a delay in construction, but is also closely related to improvements in production through reduction of cost, and increased international competitiveness.

Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

An Analysis of a Request for the Development of Computer Application Technology in an Architectural Construction Management System (건축공정 관리시스템의 전산적용 최적화를 위한 시스템 개발 요구 분석)

  • Kwon, Choon-An;Ji, Suk-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.567-575
    • /
    • 2011
  • With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.

Assessing the Safety Performance of Small-sized Contractors and Improvement Measures (소규모 건설회사의 안전관리 실태 분석 몇 개선방안)

  • Choi, Seung-Mo;Lee, Dong-Eon;Son, Chang-Baek
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.4
    • /
    • pp.53-58
    • /
    • 2008
  • This paper presents the findings obtained from the investigation of fatal disasters occurred by small-sized construction firms which have been accepted as to provide lower safety performance other than large-sized construction enterprises and cause more than half of the safety accidents in average. The study identifies the current status of safety performance provided by the small-sized construction contractors in details, find the issues involved with lack of safety performance, and suggest the improvement measures derived from the findings. A survey questionnaire was administered to the construction contractors, which are listed in the database of Construction Association of Korea as to fall into rank between 501st and 1000th in construction capacity. Safety issues such as the performance of safety management system, safety control structure, safety cost relative to safety control, education devoted to safety improvement, usage of safety garments or individual protective tools, and activities to maintain safety performance on site, etc were investigated from the study.