• Title/Summary/Keyword: construction condition

Search Result 3,666, Processing Time 0.03 seconds

A Study on the financial condition analysis of domestic construction companies (국내 건설기업들의 자금실태 분석)

  • Kim, Min-Hyung;Shim, Hyung-Seok;Jung, Yong-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.107-120
    • /
    • 2012
  • This study is conducted so as to understand actual condition of financial difficulties confronted by construction companies in the recession of real estate market which has been continued since the financial crisis started from USA in the second half of 2008, and provide fundamental data for the establishment of policy direction. Compared with this actual condition survey with a 2008 investigation, it seems that the practice of financial institutions or credit evaluation relating parts among sections, which were pointed as problems in such investigation, are resolved to some extent. It seems that there are many causes to aggravate financial conditions as pointed at this time and such causes are related to self-problems, which are inherent to the construction business, such as the smooth settlement of construction payment, the securement of new construction projects, the limitation according to the risk inherent to the construction business, and the industry vision, etc.

Proposal for Specification of Counter-measurement in Frost-Heave System in Railway Underpass Box Structures in North Korea Considering Climate Condition (북한지역 기후조건을 고려한 철도횡단구조물의 동상방지방안 제시)

  • Kim, Mun-Su;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.99-110
    • /
    • 2017
  • As a part of several Eurasian initiatives, the Korean government is trying to reconnect railways through North Korea to the Asian continent. If South Korea could build a network using railway, it would be a chance to develop a robust economic environment and to motivate economic growth. In the railway reconnection project between North and South Korea, the most important part of the railway roadbed sector is repair or improvement, and then construction of a new line through North Korea. There are not many big differences in the geological conditions; however, climate condition varies greatly during winter. The most significant condition in the safety of railway operation is frost-heaving. However, since South Korea has a relatively mild climate condition compared with North Korea, design and construction specifications under severe weather conditions in winter have not been prepared. This study proposes a plan for revising the railway design standard for underpass structures through an analysis of international standards, leading to site construction to prevent frost-heave.

Suggestion of the Prediction Model for Material Properties and Creep of 60~80MPa Grade High Strength Concrete (설계기준강도 60~80MPa급 고강도콘크리트의 재료 특성 및 크리프 예측모델식 제안)

  • Moon, Hyung-Jae;Koo, Kyung-Mo;Kim, Hong-Seop;Seok, Won-Kyun;Lee, Byeong-Goo;Kim, Gyu-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.517-525
    • /
    • 2018
  • The construction of super tall building which structure is RC and must be certainly considered on column shortening estimation and construction reflected concrete creep has been increased. Regarding the Fck 60~80MPa grade high strength concrete applied in the domestic super tall building project, the mechanical properties and creep deflection according to curing conditions(Drying creep/Basic creep) were reviewed in this research. Results of compressive strength and elastic modulus under sealed curing condition were 5% higher than unsealed condition and difference of results according to the curing condition was increased over time. Autogenous and drying shrinkage tendency showed adversely in the case of high strength concrete. Additionally, creep modulus under unseal curing condition was evaluated 2~3 times higher than sealed condition. Modified model of ACI-209 based on test result was applied to estimate long period shortening of vertical members(such as Core Wall/Mega Column) exactly, it is designed to modify and suggest the optimal creep model based on various data accumulated during construction, in the future.

CONSTRUCTION MANAGEMENT OF TUNNELLING IN SEVERE GROUNDWATER CONDITION

  • Young Nam Lee;Dae Young Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.655-661
    • /
    • 2005
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

The Method on Safety and Maintenance Based Domestic Infrastructure Facilities for Survey of Actual Condition (안전 및 유지관리기반 국내 인프라 실태조사 수행 방안)

  • Lee, Jeong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.230-231
    • /
    • 2015
  • Recently, although researching and developing of safety and maintenance on domestic infrastructure facilities in KOREA are important, there has been very little research regarding on a comprehensive and integrated survey of actual condition. Therefore this study asserts the necessity of the survey process of actual condition by period planning(short-term, middle-term, long-term). The purpose of this study is to investigate current situation and to suggest the whole process method, and to establish survey process of actual condition on domestic infrastructure facilities.

  • PDF

Experimental Examination of Nonslip Technique of Floors (바닥의 미끄럼 방지기술에 관한 실험적 검토)

  • Shin, Yoon-Ho;Baek, Koen-Hyuk;Choi, Soo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.235-238
    • /
    • 2009
  • The study of our investigating and analyzing through experiments the performance on nonslip techniques, which has been nationally applied and represented, showed the following results. 1) In wearing shoes condition, regardless the shape of the surface and surface condition of the object, it satisfied the performance standard in cleaned and dried condition and the pulverulent body mixed liquid dispersed moisture condition. However, for the case of the non-slip agent treatment, not likely as the non-slip tape treatment case, the effect was not approved as it shows almost the same CSR as none treatment. 2) In bare foot condition, it satisfied the performance standard in most of the objects except for the Ceramic tile (A), Ceramic tile (B), pure and soapy water dispersed condition.

  • PDF

Determination of structural behavior of Bosporus suspension bridge considering construction stages and different soil conditions

  • Gunaydin, Murat;Adanur, Suleyman;Altunisik, Ahmet Can;Sevim, Baris;Turker, Emel
    • Steel and Composite Structures
    • /
    • v.17 no.4
    • /
    • pp.405-429
    • /
    • 2014
  • In this paper, it is aimed to determine the structural behavior of suspension bridges considering construction stages and different soil conditions. Bosporus Suspension Bridge connecting the Europe and Asia in Istanbul is selected as an example. Finite element model of the bridge is constituted using SAP2000 program considering existing drawings. Geometric nonlinearities are taken into consideration in the analysis using P-Delta large displacement criterion. The time dependent material strength of steel and concrete and geometric variations is included in the analysis. Time dependent material properties are considered as compressive strength, aging, shrinkage and creep for concrete, and relaxation for steel. To emphases the soil condition effect on the structural behavior of suspension bridges, each of hard, medium and soft soils are considered in the analysis. The structural behavior of the bridge at different construction stages and different soil conditions has been examined. Two different finite element analyses with and without construction stages are carried out and results are compared with each other. At the end of the analyses, variation of the displacement and internal forces such as bending moment, axial forces and shear forces for bridge deck and towers are given in detail. Also, displacement and stresses for bridge foundation are given with detail. It can be seen from the analyses that there are some differences between both analyses (with and without construction stages) and the results obtained from the construction stages are bigger. It can be stated that the analysis without construction stages cannot give the reliable solutions. In addition, soil condition have effect on the structural behavior of the bridge. So, it is thought that construction stage analysis using time dependent material properties, geometric nonlinearity and soil conditions effects should be considered in order to obtain more realistic structural behavior of suspension bridges.

A Study on Problems and Improvements of Face Mapping during Tunnel Construction (국내 터널시공 중 막장지질조사의 문제점 및 개선방안에 관한 연구)

  • Kim Kwang-Yeom;Kim Chang-Yeng;Yim Sung-Bin;Yun Hyun-Seok;Seo Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.16 no.3 s.49
    • /
    • pp.265-273
    • /
    • 2006
  • Face mapping during tunnel construction is useful and critical to predict the characteristics and stability condition of following tunneling sections and to select optimum support pattern. Therefore, a detailed geological survey of the tunnel faces, as important as a routine underground survey and a RMR evaluation, should provide critical information of the tunnel face condition in terms of the engineering geological condition and the safety of working environment for the following tunneling section. But the results of the face investigation have not been applied satisfactorily during tunneling due to limitation of technique, experience and time. This study analyze problems of face mapping in tunnel construction site by using statistical results of face mapping sheets obtained from completed tunnels, and suggest several opinions to improve face mapping during tunnel construction.

AR system for FAB construction management using BIM data under fast track condition (패스트트랙 환경에서 FAB신축을 지원하는 BIM기반 AR 시스템 개발)

  • Lee, Sang-Won;Lee, Kwang-Soo;Choi, Sung-In;Ryu, Seong-Chan;Park, Jung-Seo
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.1-18
    • /
    • 2022
  • New Fabrication Facility (FAB) construction is performed with Building Information Modeling (BIM) based design. The BIM design data keep updated during the FAB construction. To improve fast-track construction management, a Fabrication Facility Augmented Reality (FABAR) was developed. This study introduces a FABAR system development process and shows performance evaluation results of the FABAR prototype system. The FABAR is implemented with three major modules: Augmented Reality (AR) visualization unit (Room-box) to transfer big BIM data to AR data, AR registration and tracking unit to match AR with real scape and to keep AR coordination in real, and AR data management unit to enhance usability. The prototype performance results were as follows: visualization of design BIM data via AR within 24 hours, precise AR registration and tracking registration, and appropriate usability to support FAB construction management at site. The results indicate that the FABAR is applicable for FAB construction management. Especially, the BIM data transformation method using Room-box in this study signifies a new construction management approach using fluctuating BIM design data in the fast track construction condition.

The Characteristics of Compressive Strength in Mortar with Internal Curing According to Curing Condition (내부양생을 적용한 모르타르의 양생조건에 따른 압축강도 특성)

  • Kim, Joo-Hyung;Cho, Young-Keun;Lee, Kwang-Myong
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.6 no.2
    • /
    • pp.87-93
    • /
    • 2018
  • The use of high-strength concrete in construction have been increasing steadily. However, high-strength concrete has a low water-binder ratio, and the problems such as cracks due to hydration heat and shrinkage during the hydration process at the early age. Recently, as a method to reduce the shrinkage of concrete, study of internal curing has carried out according to increasing about interest about it. In this study, the effect of compressive strength on the curing condition(drying, moist, water) was investigated by using artificial lightweight aggregate(LWA) in high strength and high volume mortar. As a result of autogenous shrinkage, the effect of shrinkage reduction was enhanced depending on the increasing of LWA replacement. According to the curing condition, the results of compressive strength showed the different trend. The compressive strength has increased on the drying and moisture condition and decreased on the water condition.