• Title/Summary/Keyword: constraint network

Search Result 454, Processing Time 0.023 seconds

Constraint Satisfaction Algorithm in Constraint Network using Simulated Annealing Method (Simulated Annealing을 이용한 제약 네트워크에서의 제약 충족방식에 관한 연구)

  • 차주헌;이인호;김재정
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.04a
    • /
    • pp.589-594
    • /
    • 1997
  • We have already presented the constraint satisfaction algorithm which could solve the losed loop problem in constraint network by using local constraint propagation, variable elimination and constraint modularization. With this algorithm, we have implemented a knowledge-based system (intelligent CAD) for supporting machine design interactively. In this paper, we present newer constraint satisfaction algorithm which can solve inequalities or under-constrained problems in constraint network, interactively and efficiently. This algorithm is a hybrid type of using both declarative description (constraint represention) and optimization algorithm (Simulated Annealing), simultaneously. The under-constrained problems are represented by constraint networks and satisfied completely with this algorithm. The usefulness of our algorithm will be illustrated by the application to a gear design.

  • PDF

Constraint satisfaction algorithm in constraint network using simulated annealing method (Simulated Annealing을 이용한 제약 네트워크에서의 제약 충족 방식에 관한 연구)

  • Cha, Joo-Heon;Lee, In-Ho;Kim, Jay J.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.14 no.9
    • /
    • pp.116-123
    • /
    • 1997
  • We have already presented the constraint satisfaction algorithm which could solve the closed loop porblem in constraint network by using local constraint propagation, variable elimination and constraint modularization. With this algorithm, we have implemented a knowledge-based system (intelligent CAD) for supporting machine design interactively. In this paper, we present newer constraint satisfaction algorithm which can solve inequalities or under-constrained problems in constraint network, interactively and effi- ciently. This algorithm is a hybrid type of using both declarative description (constraint representation) and optimization algorithm (Simulated Annealing), simultaneously. The under-constrained problems are represented by constraint networks and satisfied completely with this algorithm. The usefulness of our algorithm will be illustrated by the application to a gear design.

  • PDF

Hierarchical Constraint Network Representation of Concurrent Engineering Models (동시성공학 모형의 계층적 제약식 네트워크 표현 방법론)

  • Kim, Yeong-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.22 no.3
    • /
    • pp.427-440
    • /
    • 1996
  • Constraint networks are a major approach to knowledge representation in Concurrent Engineering (CE) systems. The networks model various factors in CE as constraints linked by shared variables. Many systems have been developed to assist constraint network processing. While these systems can be useful, their underlying assumption that a solution must simultaneously satisfy all the constraints is often unrealistic and hard to achieve. Proposed in this paper is a hierarchical representation of constraint networks using priorities, namely Prioritized Constraint Network (PCN). A mechanism to propagate priorities is developed, and a new satisfiability definition taking into account the priorities is described. Strength of constraint supporters can be derived from the propagated priorities. Several properties useful for investigating PCN's and finding effective solving strategies ore developed.

  • PDF

The Optimal Link Scheduling in Half-Duplex Wireless Mesh Networks Using the Constraint Programming (제약식 프로그래밍을 이용한 일방향 전송 무선 메쉬 네트워크에서의 최적 링크 스케쥴링)

  • Kim, Hak-Jin
    • Journal of Information Technology Applications and Management
    • /
    • v.23 no.2
    • /
    • pp.61-80
    • /
    • 2016
  • The wireless mesh network (WMN) is a next-generation technology for data networking that has the advantage in cost and the flexibility in its construction because of not requiring the infra-structure such as the ethernet. This paper focuses on the optimal link scheduling problem under the wireless mesh network to effectuate real-time streaming by using the constraint programming. In particular, Under the limitation of half-duplex transmission in wireless nodes, this paper proposes a solution method to minimize the makespan in scheduling packet transmission from wireless nodes to the gateway in a WMN with no packet transmission conflicts due to the half-duplex transmission. It discusses the conflicts in packet transmission and deduces the condition of feasible schedules, which defines the model for the constraint programming. Finally it comparatively shows and discusses the results using two constraint programming solvers, Gecode and the IBM ILOG CP solver.

A Conflict Detection Method Based on Constraint Satisfaction in Collaborative Design

  • Yang, Kangkang;Wu, Shijing;Zhao, Wenqiang;Zhou, Lu
    • Journal of Computing Science and Engineering
    • /
    • v.9 no.2
    • /
    • pp.98-107
    • /
    • 2015
  • Hierarchical constraints and constraint satisfaction were analyzed in order to solve the problem of conflict detection in collaborative design. The constraints were divided into two sets: one set consisted of known constraints and the other of unknown constraints. The constraints of the two sets were detected with corresponding methods. The set of the known constraints was detected using an interval propagation algorithm, a back propagation (BP) neural network was proposed to detect the set with the unknown constraints. An immune algorithm (IA) was utilized to optimize the weights and the thresholds of the BP neural network, and the steps were designed for the optimization process. The results of the simulation indicated that the BP neural network that was optimized by IA has a better performance in terms of convergent speed and global searching ability than a genetic algorithm. The constraints were described using the eXtensible Markup Language (XML) for computers to be able to automatically recognize and establish the constraint network. The implementation of the conflict detection system was designed based on constraint satisfaction. A wind planetary gear train is taken as an example of collaborative design with a conflict detection system.

An Analysis of a Multilayered Open Queueing Network with Population Constraint and Constraint and Constant Service Times (사용자수 제한을 갖는 개방형 다중계층구조의 대기행렬 네트워크 분석에 관한 연구)

  • Lee, Yeong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.24 no.4
    • /
    • pp.111-122
    • /
    • 1999
  • In this paper, we consider a queueing network model. where the population constraint within each subnetwork is controlled by a semaphore queue. The total number of customers that may be present in the subnetwork can not exceed a given value. Each node has a constant service time and the arrival process to the queueing network is an arbitrary distribution. A major characteristics of this model is that the lower layer flow is halted by the state of higher layer. We present some properties that the inter-change of nodes does not make any difference to customer's waiting time in the queueing network under a certain condition. The queueing network can be transformed into a simplified queueing network. A dramatic simplification of the queueing network is shown. It is interesting to see how the simplification developed for sliding window flow control, can be applied to multi-layered queueing network.

  • PDF

Optimization of Computer Network with a Cost Constraint (비용 제약을 갖는 컴퓨터 네트워크의 최적화)

  • Lee, Han-Jin;Yum, Chang-Sun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.1
    • /
    • pp.82-88
    • /
    • 2007
  • This paper considers a topological optimization of a computer network design with a cost constraint. The objective is to find the topological layout of links, at maximal reliability, under the constraint that the network cost is less or equal than a given level of budget. This problem is known to be NP-hard. To efficiently solve the problem, a genetic approach is proposed. Two illustrative examples are used to explain and test the proposed approach. Experimental results show evidence that the proposed approach performs more efficiently for finding a good solution or near optimal solution in comparison with a simulated annealing method.

A Coordinated Heuristic Approach for Virtual Network Embedding in Cloud Infrastructure

  • Nia, Nahid Hamzehee;Adabi, Sepideh;Nategh, Majid Nikougoftar
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.5
    • /
    • pp.2346-2361
    • /
    • 2017
  • A major challenge in cloud infrastructure is the efficient allocation of virtual network elements on top of substrate network elements. Path algebra is a mathematical framework which allows the validation and convergence analysis of the mono-constraint or multi-constraint routing problems independently of the network topology or size. The present study proposes a new heuristic approach based on mathematical framework "paths algebra" to map virtual nodes and links to substrate nodes and paths in cloud. In this approach, we define a measure criterion to rank the substrate nodes, and map the virtual nodes to substrate nodes according to their ranks by using a greedy algorithm. In addition, considering multi-constraint routing in virtual link mapping stage, the used paths algebra framework allows a more flexible and extendable embedding. Obtained results of simulations show appropriate improvement in acceptance ratio of virtual networks and cost incurred by the infrastructure networks.

Virtual Network Embedding based on Node Connectivity Awareness and Path Integration Evaluation

  • Zhao, Zhiyuan;Meng, Xiangru;Su, Yuze;Li, Zhentao
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.7
    • /
    • pp.3393-3412
    • /
    • 2017
  • As a main challenge in network virtualization, virtual network embedding problem is increasingly important and heuristic algorithms are of great interest. Aiming at the problems of poor correlation in node embedding and link embedding, long distance between adjacent virtual nodes and imbalance resource consumption of network components during embedding, we herein propose a two-stage virtual network embedding algorithm NA-PVNM. In node embedding stage, resource requirement and breadth first search algorithm are introduced to sort virtual nodes, and a node fitness function is developed to find the best substrate node. In link embedding stage, a path fitness function is developed to find the best path in which available bandwidth, CPU and path length are considered. Simulation results showed that the proposed algorithm could shorten link embedding distance, increase the acceptance ratio and revenue to cost ratio compared to previously reported algorithms. We also analyzed the impact of position constraint and substrate network attribute on algorithm performance, as well as the utilization of the substrate network resources during embedding via simulation. The results showed that, under the constraint of substrate resource distribution and virtual network requests, the critical factor of improving success ratio is to reduce resource consumption during embedding.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF