• Title/Summary/Keyword: condition of discontinuities

Search Result 53, Processing Time 0.021 seconds

Tunnel Overbreak Management System Using Overbreak Resistance Factor (여굴저항도를 이용한 터널 발파 여굴 관리 시스템)

  • Jang, Hyongdoo
    • Tunnel and Underground Space
    • /
    • v.30 no.1
    • /
    • pp.63-75
    • /
    • 2020
  • When tunnel is excavated via drilling and blasting, the excessive overbreak is the primary cause of personal or equipment safety hazards and increasing the cost of the tunnel operation owing to additional ground supports such as shotcrete. The practical management of overbreak is extremely difficult due to the complex causative mechanism of it. The study examines the relationship between rock mass characteristics (unsupported face condition, uniaxial compressive strength, face weathering and alteration, discontinuities- frequency, condition and angle between discontinuities and tunnel contour) and the depth of overbreak through using feed-forward artificial neuron networks. Then, Overbreak Resistance Factor (ORF) has been developed based on the weights of rock mass parameters to the overbreak phenomenon. Also, a new concept of tunnel overbreak management system using ORF has been suggested.

Accurate Computations for Multi-dimensional Flows : Multi-dimensional Higher order Interpolation Scheme (다차원 유동의 정확한 수치해석 : 다차원 고차 내삽 기법)

  • Kim Kyu Hong;Kim Chongam;Rho Oh-Hyun
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2003.08a
    • /
    • pp.11-17
    • /
    • 2003
  • The new multi-dimensional higher order interpolation scheme called MHIS is developed. Firstly, multi-dimensional TVD condition is derived based on one-dimensional TVD condition. Using multi-dimensional TVD condition, 2nd, 3rd and 5th order MHIS are presented. By help of multi-dimensional TVD condition, it is possible to captured a discontinuity monotonically even in a multi-dimensional flow. It is verified through several test cases that the accuracy and the robustness of MHIS are enhanced in regions of shock discontinuities as well as boundary-layers.

  • PDF

Suggestion of Regression Equations for Estimating RMR Factor Rating by Geological Condition (지질 조건을 고려한 RMR 인자값 추정을 위한 선형회귀식 제안)

  • Kim, Kwang-Yeom;Yim, Sung-Bin;Kim, Sung-Kwon;Kim, Chang-Yong;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.17 no.4
    • /
    • pp.555-566
    • /
    • 2007
  • In general, RMR classification system is used for the support design of a tunnel. Face mapping during excavation and RMR-based rock classifications are conducted in order to provide information for complementary changes to preliminary survey plans and for continuous geological estimations in direction of tunnel route. Although they are ever so important, there are not enough time for survey in general and sometimes even face mapping is not available. Linear regression analysis for the estimation of mediating RQD and condition of discontinuities, which require longer time and more detailed observation in RMR, was performed and optimum regression equations are suggest as the result. The geological data collected from tunnels were analyzed in accordance with three rock types as sedimentary rock, phyllite and granite to see geological effects, generally not been considered in previous researches. Parameters for the regression analysis were set another RMR factor.

Case Study of Ground Behavior Analysis of Soft and Hard Rock Layers with Fractured Zones in Deep Excavation (깊은 굴착에서 파쇄대를 갖는 연암 및 경암 지층의 지반 거동분석 사례연구)

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.521-532
    • /
    • 2008
  • Supporting system design and construction management for the soft and hard rock layers with fractured zones are very important theme for the safety of temporary retaining wall, surrounding ground and structures in the urban deep excavation for the construction of subway, railway, building etc. The prevailing design method of supporting system for the soft and hard rock layers in the deep excavation is mostly carrying out by simplification without proper consideration for the characteristic of rock discontinuities. Therefore the behaviors of rock discontinuities and fractured zones dominate the whole safety of excavation work in the real construction stage, serious disaster due to the failure of temporary retaining wall can be induced in the case of developing large deformations in the ground and large axial forces in the supporting system. This paper introduces examples of deep excavation where the soft and hard rock layers with fractured zones were designed to be supported by shotcrete and rock bolt, deformations of corresponding ground and supporting systems in the construction period and increments of axial force in the upper earth anchors and strut due to the these deformations were investigated through detailed analysis of measurement data, the results were so used for the management of consecutive construction that led to the safe and economical completion of excavation work. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Side resistance of rock socketed drilled shafts considering in situ rock mass condition (현장조건을 고려한 현장타설말뚝의 단위주면마찰력)

  • Sagong, Myung;Paik, Kyo-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.967-973
    • /
    • 2004
  • Rock socketed drilled shafts transfer significant portion of structural loads at the socketed part. Therefore, a proper design of side and base resistances of a shaft at the socket is a major concern for the geotechnical engineers. In this study, we modified the Hoek-Brown criterion to estimate side resistance of rock socketed drilled shafts. Earlier method to compute side resistance of a shaft is linear or power functions of intact rock masses. However, side resistance is mobilized like shearing which influenced by the mechanical properties of concrete and rock masses, adhesion of rock/concrete interface, roughness of rock socket. Therefore, a single coefficient or power of uniaxial compressive strength of intact rock cannot provide accurate values of side resistance in a wide range of the uniaxial compressive strength. A new approach proposed in this study can consider in situ rock mass condition (frequency or discontinuities, weathering condition), and rock types thus, it has a wider applicability than the earlier models.

  • PDF

석회암지역에서 불연속면의 물리검층반응

  • Kim, Yeong-Hwa;Yang, Yeong-Geun;Kim, Jung-Yeol;Kim, Yu-Seong
    • Journal of the Korean Geophysical Society
    • /
    • v.4 no.2
    • /
    • pp.95-102
    • /
    • 2001
  • As a basic study of characterizing fracture condition in bore hole, conventional geophysical well log data consisting of sonic, gamma-gamma and resistivity logs were compared with geological core log and acousic televiewer log in limestone geology. Discontinuities shown on the acoustic televiewer log and the core log show fairly good correlation. The conventional Geophysical log is also shown to bi effective in locating discontinities in limestone geology; sonic log shows the best result and resistivity shows the worst. Particularly, the combination method of density and sonic logs is shown to be the most effective in delineating discontinuities.

  • PDF

Prediction of Ground-Condition Ahead of the Tunnel Face by Using 3-Dimensional Absolute Displacements (3차원 절대내공변위를 이용한 터널 막장전방의 지반면화 예측기법)

  • Lee, In-Mo;Gang, Gi-Don;Park, Gwang-Jun
    • Geotechnical Engineering
    • /
    • v.14 no.4
    • /
    • pp.17-32
    • /
    • 1998
  • has been much progress in theories and construction techniques to secure the stability of the underground structures. Recently, several studios have shown that it is possible to predict the existence of discontinuities ahead of a tunnel face by analyzing 3-dimensional absolute displacements measured during tunnel excavation. This paper concentrated on the development of a methodology to predict the existence and location of the discontinuities, or the void space(abandoned mine) , by performing 3-dimensional FEM analysis and considering the stress relocation caused by arching effect during excavation. Also, this study tried to verify deformation for choosing the most suitable support system. The results of this study might provide a way of safer and economical tunnel construction by utilizing the in-situ monitoring data.

  • PDF

Comparison of the RMR Ratings by Tunnel Face Mappings and Horizontal Pre-borings at the Fault Zone in a Tunnel (터널 단층대에서 수평시추와 막장관찰에 의한 RMR값의 비교 분석)

  • Kim Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.15 no.1 s.54
    • /
    • pp.39-46
    • /
    • 2005
  • The RMR ratings, one by horizontal pre-boring in a tunnel and another by tunnel face mapping, are compared at the fault zone in a tunnel. Generally. the horizontal pre-borings were so effective as to forecast reasonably the supporting patterns after tunnel excavation. But the maximum difference in RMR ratings estimated by two methods was about 50 at a certain section of a tunnel. The differences were analyzed on each parameter of the RMR system: the rating differences were 24 in the condition of discontinuities, 15 in the RQD and 13 in the uniaxial compressive strength of rock. To minimize the gap between RMR by pre-borings and by face mappings, it is necessary to select the horizontal pre-boring location where tunnel stability could be critical and to evaluate in detail the sub-parameters of the condition of discontinuities.

Visual Interpretation about the Underground Information using Borehole Camera (휴대용 시추공 카메라를 이용한 지하정보의 가시화 기법)

  • Matsui Kikuo;Jeong Yun-Young
    • Tunnel and Underground Space
    • /
    • v.15 no.1 s.54
    • /
    • pp.28-38
    • /
    • 2005
  • According to the recent development of measurement system utilizing one or a set of boreholes, visualization of the explored underground became to be a major issue. It induced even the introduction of monitoring apparatuses on the borehole wall with multi-function tool, but the usage of these was often limited by where is unfavorable rock condition and a few of engineers can approach. And so, a portable type of borehole camera with only the essential function has been investigated and a few of commercial models about this is recently being applied into the field condition. This paper was based on the monitoring results obtained using a commercial model by Dr. Nakagawa. Discontinuities in rock mass were the topic for the visualization, and it was studied how can visualize their three dimensional distribution and what a numerical formulation is needed and how to understand the visualization result. The numerical formulation was based on the geometric correlation between the dip direction / dip of discontinuous plane and the trend / plunge of borehole, a set of the equation of a plane was induced. As field application of this into two places, it is found that the above visualization methodology will be especially an useful geotechlical tool for analyzing the local distribution of discontinuities.

Study on Rock classification of Rock Socketed Drilled Shaft (현장타설말뚝의 암반 근입부 암판정 사례연구)

  • Park, Woan-Suh;Yoo, Jai-Hyun;Lee, Woo-Cheol;Joo, Yong-Sun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.658-663
    • /
    • 2010
  • Recently the most of deep foundation were socketed into weathered rock or soft rock to carry large foundation loads. The end bearing behavior of piles socketed in rock is generally dependent on the rock mass conditions with discontinuities and rock strength. Therefore, it is very important that the estimating rock classification with relation of TCR, RQD and unpredicted rock condition. In this study, the construction failure example of drilled shaft due to mistaking to estimate the rock classification on penetration were analyzed in site, so we hope to discuss problems of determining the rock socketed length of drilled shaft on construction.

  • PDF