• 제목/요약/키워드: concrete tunnel

검색결과 595건 처리시간 0.025초

Development of Inspection System for Crack on the Lining of Concrete Tunnel (콘크리트 터널 라이닝 균열검사 시스템 개발에 관한 연구)

  • 고봉수;손영갑;신동익;김병화;한창수
    • Journal of Institute of Control, Robotics and Systems
    • /
    • 제10권1호
    • /
    • pp.66-72
    • /
    • 2004
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors, who observe cracks with their naked eyes and record them. But manual inspection is slow, and measured crack data is subjective. Therefore, this study proposes inspection system fur measuring cracks in tunnel lining and providing objective crack data to be used in safety assessment. The system consists of On-vehicle system and Laboratory system. On-Vehicle system acquires image data with line CCD camera on scanning along the tunnel lining. Laboratory system extracts crack information from the acquired image using image processing. Measured crack information is crack thickness, length and orientation. To improve accuracy of crack recognition, the geometric properties and patterns of cracks in concrete structure were applied to image processing. The proposed system was verified with experiments in both laboratory environment and field environment such as subway tunnel.

A Case Study on the Construction of Concrete Lining in Parallel with Blasting in a Long Tunnel (장대터널 굴착시 발파-라이닝 병행시공 사례연구)

  • Ryu Joung-Hoon;An Hyung-Jun;You Jin-O;Choi Byung-Hee
    • Explosives and Blasting
    • /
    • 제24권1호
    • /
    • pp.39-48
    • /
    • 2006
  • The various alternatives to reduce the construction period and cost in the wide and long tunnel have been attempted recently. However, the concrete lining forming process after finishing tunnel excavation may delay construction period considering the specific conditions of the wide and long tunnel. The concrete lining is indispensible for the road tunnel. For this reason, the blasting-lining synchronizing study had been carried out to reduce construction period in the Gyea-Ryong Tunnel. Lining models were installed at four different distance conditions the floor of the tunnel. After model installation, hundreds of blasting vibration measurements and concrete material tests were performed to calculate the safe distance between blasting point and concrete lining form. The study also introduces a method which can obtain the better ability of construction by improving working environment with the ventilation and the relocation of tunnel equipments in the working places.

An Experimental Study of Polypropylene Fiber for the Prevention of Explosive Spalling of Tunnel Concrete Lining (터널 콘크리트 라이닝 폭열 방지를 위한 폴리프로필렌 섬유 혼입율 분석 연구)

  • Kim, Nag Young;Shim, Jae Won;Shim, Jong Sung;Won, Jong Phil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제7권4호
    • /
    • pp.323-333
    • /
    • 2005
  • Recently the fire is happening at the tunnel and underground - structure internationally. We are socially the economy the actual circumstances which serious loss is happening due to an fire occurrence when fire happened which is closed like tunnel and underground - structure, the collapse from the burglar degradation of strength of tunnel concrete lining and human life damage happen. It causes big problem while the long time disconnects a traffic network. While the fire happened in this research at the tunnel, the paper construct a basis data to deduce the specification regulation about stability of tunnel concrete lining. In this paper, the experiment was carried out for the prevention of explosive spalling of tunnel to use a reinforced Polypropylene concrete which mixes a Polypropylene which are known for the thing by being efficient at a protect of explosive spalling of the concrete. According to the firproof test result of reinforced Polypropylene admixture mortar, Polypropylene admixture of prevention of explosive spalling analyzed 0.2%-0.25%.

  • PDF

An Experimental Study on Performance of neater Stops at Construction joints in Tunnel (터널 시공이음부에서의 방수재 역할에 대한 실험연구)

  • 백송훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.217-223
    • /
    • 1999
  • Mostly, water leakage took place in construction joints. In case of cable tunnels constructed by open-cut method, waterstops have been used to prevent the water leakage. But, we haven't any experience to install the waterstops in NATM cable tunnels. So, it is necessary to develope the waterstops and test the performance of it in laboratory. We manufactured cable tunnel lining quarter scale model by pouring concrete, and installed the waterstops. After filling the inside of concrete lining about two-third with water, we put the air pressure on the water, In addition, it is also carried out water leakage test for concrete lining model without waterstops. As a result, we confirmed the performance of waterstops and its adaptability. It is also tested that the performance of rubber gaskets used in concrete segments of Shield tunnelling. In addition, we determined the allowable infiltration rate for cable tunnel with non-drainage system.

  • PDF

What are measures to reduce interior noise for KTX in tunnel with concrete track? (콘크리트 궤도 터널 주행 시 KTX차량의 실내소음 저감방안은 무엇인가?)

  • Kim J.C.;Koh H.I.;Lee C.W.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 한국정밀공학회 2006년도 춘계학술대회 논문집
    • /
    • pp.29-30
    • /
    • 2006
  • The interior noise of KTX in tunnel has become an issue since the commercial operating in April 2004. The analysis of the interior noise of KTX in tunnel with concrete track shows sharply increased noise level in the range of 80Hz that is the natural frequency of the KTX carbody. We know that the booming noise inside KTX in tunnel with concrete track is generated by noise outside gangway and rolling noise at the carbody natural frequency. In this Study noise reduction methods are discussed on the basis of the comparison of the KTX and KHST noise characteristics. Alternatively, the effect of the modified mud-flap on the interior noise is introduced.

  • PDF

Assessment of time-dependent behaviour of rocks on concrete lining in a large cross-section tunnel

  • Mirzaeiabdolyousefi, Majid;Nikkhah, Majid;Zare, Shokrollah
    • Geomechanics and Engineering
    • /
    • 제29권1호
    • /
    • pp.41-51
    • /
    • 2022
  • Tunneling in rocks having the time-dependent behavior, causes some difficulties like tunnel convergence and, as a result, pressure on concrete lining; and so instability on this structure. In this paper the time-dependent behaviour of squeezing phenomenon in a large cross section tunnel was investigated as a case study: Alborz tunnel. Then, time-dependent behaviour of Alborz tunnel was evaluated using FLAC2D based on the finite difference numerical method. A Burger-creep viscoelastic model was used in numerical analysis. Using numerical analysis, the long-time effect of squeezing on lining stability was simulated.This study is done for primary lining (for 2 years) and permanent lining (for 100 years), under squeezing situations. The response of lining is discussed base on Thrust Force-Bending Moment and Thrust Force-Shear Force diagrams analysing. The results determined the importance of consideration of time-dependent behaviour of tunnel that structural forces in concrete lining will grow in consider with time pass and after 70 years can cause instability in creepy rock masses section of tunnel. To show the importance of time-dependent behavior consideration of rocks, elastic and Mohr-Coulomb models are evaluated at the end.

Detection of the Cavity Behind the Tunnel Lining by Single Channel Seismic and GPR Method (GPR 및 단일채널 탄성파탐사에 의한 터널라이닝 배면공동 조사)

  • Shin, Sung-Ryul;Jo, Chul-Hyun;Shin, Chang-Soo;Yang, Seung-Jin;Jang, Won-Yil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • 제2권4호
    • /
    • pp.148-158
    • /
    • 1998
  • Determining the thickness if concrete lining and detecting of the cavity where is located behind tunnel lining plays an important role in the safety diagnosis of tunnel structure and the quality control. In this study, we made use of GPR and seismic method in order to find the cavity or flaw. Although GPR is very useful method in the concrete lining without rebar, it is difficult to detect the cavity in the reinforced concrete lining. We applied mini-seismic method to the reinforced concrete lining. The obtained seismic data was processed by means of seismic section in time domain and image section of power spectrum in frequency domain using Impact-Echo method as well. The proposed method can accurately show the location and depth of the cavity in the reinforced concrete lining.

  • PDF

Characterization of deterioration of concrete lining in tunnel structures (터널 콘크리트 라이닝 구조물의 성능저하 특성)

  • Kim, Dong-Gyou;Jung, Ho-Seop;Bae, Gyu-Jin;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제11권4호
    • /
    • pp.387-394
    • /
    • 2009
  • The objective of this study is to evaluate the durability and deterioration of concrete lining in the seven conventional tunnels. These tunnels were constructed about 40~70 years ago, and closed about 10~40 years ago. The field investigation and various laboratory testings were performed for this study. It was observed from the visual, examinations that the concrete linings of 7 tunnels were severely deteriorated, such as, cracks, leakages, desquamation, and exploitations. The compressive strengths obtained from rebound hardness method and uniaxial compressive strength test on core specimens largely differed depending on the locations in the tunnel. The maximum compressive strength of concrete lining was greater about 2 times than the minimum compressive strength of concrete lining in the same tunnel. The results of micro-structural analysis showed that the substances deteriorating the concrete lining, such as ettringite and thaumasite, were detected in the concrete lining of tunnel.