Geotechnical Engineering Progress with the Incheon Bridge Project

  • Cho, Sung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.133-144
    • /
    • 2009
  • Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge of Korea. Incheon Bridge is the integrated set of several special featured bridges including a magnificent cable-stayed girder bridge which has a main span of 800 m width to cross the navigation channel in and out of the Port of Incheon. Incheon Bridge is making an epoch of long-span bridge designs thanks to the fully application of the AASHTO LRFD (load & resistance factor design) to both the superstructures and the substructures. A state-of-the-art of the geotechnologies which were applied to the Incheon Bridge construction project is introduced. The most Large-diameter drilled shafts were penetrated into the bedrock to support the colossal superstructures. The bearing capacity and deformational characteristics of the foundations were verified through the world's largest static pile load test. 8 full-scale pilot piles were tested in both offshore site and onshore area prior to the commencement of constructions. Compressible load beyond 30,000 tonf pressed a single 3 m diameter foundation pile by means of bi-directional loading method including the Osterberg cell techniques. Detailed site investigation to characterize the subsurface properties had been carried out. Geotextile tubes, tied sheet pile walls, and trestles were utilized to overcome the very large tidal difference between ebb and flow at the foreshore site. 44 circular-cell type dolphins surround the piers near the navigation channel to protect the bridge against the collision with aberrant vessels. Each dolphin structure consists of the flat sheet piled wall and infilled aggregates to absorb the collision impact. Geo-centrifugal tests were performed to evaluate the behavior of the dolphin in the seabed and to verify the numerical model for the design. Rip-rap embankments on the seabed are expected to prevent the scouring of the foundation. Prefabricated vertical drains, sand compaction piles, deep cement mixings, horizontal natural-fiber drains, and other subsidiary methods were used to improve the soft ground for the site of abutments, toll plazas, and access roads. Light-weight backfill using EPS blocks helps to reduce the earth pressure behind the abutment on the soft ground. Some kinds of reinforced earth like as MSE using geosynthetics were utilized for the ring wall of the abutment. Soil steel bridges made of corrugated steel plates and engineered backfills were constructed for the open-cut tunnel and the culvert. Diverse experiences of advanced designs and constructions from the Incheon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in geotechnical engineering through this project will contribute to the national development of the longspan bridge technologies remarkably.

  • PDF

A Study on the Development of Field Management System for Underground utility using Self-levelling marker and DGPS. (자동수평마커와 DGPS를 이용한 지하시설물의 현장관리시스템 개발에 관한 연구)

  • Kim, In-Seup
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.6
    • /
    • pp.733-739
    • /
    • 2009
  • Recently it is being increased rapidly to install magnetic marker and RFID tag on the underground utility lines before backfilling to ensure effective it's management. However, due to changes an attitude and damages of sensors. By pressure and vibration during soil compacting, detecting rate is significantly reduced as well as it allows to use only one line of various pipes since it has an unique frequency. Also it is required too long time to reach to target point with an non-accurate navigational GPS receiver and hard to update existing data base with a manual input of new data in the field. To improve these problems, the researcher developed the field management system that apply with ball typed self-levelling marker which is free from the changes of attitude for sensors during compaction as well as has various radio frequency applicable to many kind of pipes and ensure fast positioning to target point using an incorporated system with PDA based DGPS receiver which allows loading a field GIS software and RFID detector. Further, it provides with viewing all of RFID data on the DGPS receiver screen directly and also input new data to existing data base in the field automatically.

Stress Concentration Ratio According to Penetration Rate of Composite Ground Reinforced with GCP (GCP로 개량된 복합지반의 관통률에 따른 응력분담비)

  • Na, Seung-Ju;Kim, Daehyeon;Lee, Ik-Hyo;Lee, Kang-Il
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.2
    • /
    • pp.35-45
    • /
    • 2017
  • Gravel compaction pile (GCP) is widely used as it increases the bearing capacity of soft ground and reduces the consolidation settlement. Stress concentration ratio for design is dependent on the area replacement, surcharge pressure, depth and penetration rate. However, a range of stress concentration ratio obtained through field, laboratory experiments and numerical analysis is large. But since the main objective of the study is to evaluate the stress concentration ratio and settlement for both area replacement ratio and penetration rate through numerical analysis. Numerical analysis using the finite element program ABAQUS 6.12-4 has been performed for the composite ground with GCP. As a result, the stress concentration ratio at the points except for the point of top is in the range of 1.21-5.36, 1.19-5.45, 2.16-5.60 for 60%, 80% and 100% penetration, respectively. In general, as the penetration rate and area replacement ratio increases, the stress concentration ratio tends to increase.

A Study on Self-Hardening Characteristics of Coal Ash by Mixing Ratio of Fly Ash and Bottom Ash (비회와 저회의 배합비에 따른 석탄회의 자경성에 관한 연구)

  • Shin, Woonggi;Lim, Daesung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.6
    • /
    • pp.85-91
    • /
    • 2010
  • As enormous construction projects of land development are carried out around Korea, useful construction materials are needed to perform the construction projects. However, there are no more enough of fill and reclamation materials in our country. That is why the coal ash is expected to be utilized as an alternative material. Since the coal ash has the characteristics of a pozzolan and a selfhardening material, it is adjudged that coal ash has a great possibility to be used as a fill and reclamation material. In this study, grain size analysis, Atterberg limit test, and specific gravity test were performed to examine the physical characteristics of the coal ash about a self-hardening material before utilizing the coal ash in the construction. Compaction test, unconfined compression test, direct shear test, and flexible wall permeability test were conducted to investigate the engineering characteristics according to mixture ratios of fly ash and bottom ash. As a result of the tests, it was confirmed that the mixing ratio 1:1 of fly ash and bottom ash is the most effective to use as a fill and reclamation material. If the mixture of coal ash is used as a backfill material with light weight around structure, it is expected to play a significant role in reducing earth pressure on the back of the structure. As the age of the mixture of coal ash goes by, it intends to decrease the coefficient of permeability. As described above, the coal ash should be considered as an alternative material of fill and reclamation materials since the result of the tests indicates that the coal ash is suitable to a useful material on the construction design.

Resear cher & Coordinator, Canal Reseach & Development, japan (농업수리시설과 소수로굴착용 Trencher V형의 개발에 대하여)

  • 영목청
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.21 no.2
    • /
    • pp.28-36
    • /
    • 1979
  • One of most important problems in the Monsoon Asia today is the production of rice paddy to meet the needs of the ever increasing population. Diversemeans are being employed to meet this demand, both by increasing productivity of existing farm land and by bringing further areas into cultivation. The primary step in either field is to ensure that there is sufficient moisture in the soil to suit the paddy, and at the same this means that excess moisture has to be drained off the land, while in others irrigat ion has to be employed to bring sufficient water to an area. In view of the fact that the project comprises a huge amount of earthwork, it can be carried out by extensive use of construction machinery in order to shorten the period. As farm ditch has a comparatively small section with shallow cutting depth, inaddition, there is lack of access road in the field, the excavation equipment with bulldozer or tracter-shovel (backhoe) type are not applicable because there are mostly adapted for the excavation of deep and wide section. Mini-backhoe with its bucket width not larger than 0. 3m, and width of blade not larger than 1. 00m seems to be more adaptable. About 80% of excavation of ditch section will be done by the machinery while the other 20% of excavation together with the finishing of the section are supposed to be done by man-power. The embankment of ditch section can be compacted by the crawler of backhoe when it is moving along the ditch for excavation. However, Lowland paddy field in the Monsoon Asia are made particulary in rain season, therefore, heavy machinery is not easy excavation for ditch. It is very important to know exact ground support power of the working site and select machines with corresponding ground pressure. Ground support power is variable subject to quality and water content of soil and therefore selection of machines should be made duly considering ground condition of the site at the time of construction works. Farm ditches dug and compacted by mannual labar are of poor quality and subject to destruction after one or two years of operation. On the other hand, excavation and compaction by bulldozer is not practical for ditches. Backboe is suitable for slope land, but this is required cycle time of bucket excavation and dumped out. If a small-scale farm ditch trencher adaptable to lowland paddy field is invented, such a machine could greatly accelerate the massive construction work envisaged in many countries and thus significantly speed up the most difficult part of irrigation development and management in Monsoon Asia.

  • PDF

Fossil Scaphopods from the Hagjeon Formation and the Duho Formation, the Cenozoic Pohang Basin, Korea (신생대 제3기 포항분지의 학전층과 두호층에서 산출된 굴족류 화석)

  • Kong, Dal Yong;Lee, Seong Joo
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.1
    • /
    • pp.218-231
    • /
    • 2012
  • A total of 126 fossil scaphopods (121 specimens from the Hagjeon Formation and 5 specimens from the Duho Formation) were found from the Cenozoic strata, Hagjeon and Duho Formations, Pohang Basin, Korea. Five species belonging two genera (Fissidentalium yokoyamai, F. sp. A, B, and Rhabdus sp. A, B) were classified: the most dominant species is Fissidentalium yokoyamai. The species of Fissidentalium yokoyamai is characterized by curved shell (accuration=3.90%) and very closely spaced longitudinal ribs on shell surfaces, while the species of Rhabdus is a nearly straight shell characterized by concentric growth lines without longitudinal ribs. Identification of two genera is somewhat easy due to such morphological differences but classification at generic level is hard because diagnostic features (e.g., cross section and apical structure) are lost in the most specimens. Consequently, except for Fissidentalium yokoyamai, the rest were classified temporarily as F. sp. A, B, and Rhabdus sp. A, B. Two types of preservation state were recognized: one is three-dimensionally preserved specimen (3D specimen) and the other is compressed specimen. Internal parts of the 3D specimen is filled with clastic sediments identical to the surrounding sediments of the shells, which is not observed in the compressed specimens. It is, thus, concluded that the 3D fossils were originally empty but internal cavity were immediately filled with the sediments, which may have protect from the compaction due to pressure during deposition of the gravelly to coarse sandstone of the Hagjeon Formation.

A novel approach for rice straw agricultural waste utilization: Synthesis of solid aluminosilicate matrices for cesium immobilization

  • Panasenko, A.E.;Shichalin, O.O.;Yarusova, S.B.;Ivanets, A.I.;Belov, A.A.;Dran'kov, A.N.;Azon, S.A.;Fedorets, A.N.;Buravlev, I. Yu;Mayorov, V. Yu;Shlyk, D. Kh;Buravleva, A.A.;Merkulov, E.B.;Zarubina, N.V.;Papynov, E.K.
    • Nuclear Engineering and Technology
    • /
    • v.54 no.9
    • /
    • pp.3250-3259
    • /
    • 2022
  • A new approach to the use of rice straw as a difficult-to-recycle agricultural waste was proposed. Potassium aluminosilicate was obtained by spark plasma sintering as an effective material for subsequent immobilization of 137Cs into a solid-state matrix. The sorption properties of potassium aluminosilicate to 137Cs from aqueous solutions were studied. The effect of the synthesis temperature on the phase composition, microstructure, and rate of cesium leaching from samples obtained at 800-1000 ℃ and a pressure of 25 MPa was investigated. It was shown that the positive dynamics of compaction was characteristic of glass ceramics throughout the sintering. Glass ceramics RS-(K,Cs)AlSi3O8 obtained by the SPS method at 1000 ℃ for 5 min was characterized by a high density of ~2.62 g/cm3, Vickers hardness ~ 2.1 GPa, compressive strength ~231.3 MPa and the rate of cesium ions leaching of ~1.37 × 10-7 g cm-2·day-1. The proposed approach makes it possible to safe dispose of rice straw and reduce emissions into the atmosphere of microdisperse amorphous silica, which is formed during its combustion and causes respiratory diseases, including cancer. In addition, the obtained is perspective to solve the problem of recycling long-lived 137Cs radionuclides formed during the operation of nuclear power plants into solid-state matrices.

A Study on the Hydraulic Properties of Domestic Clay/Crushed Rock Mixture for the Backfill Material in a Radioactive Waste Repository (방사성폐기물 처분장 되메움재를 위한 국산점토/분쇄암석 혼합물의 수리특성에 관한 연구)

  • Lee, J.O.;Cho, W.J.;Hahn, P.S.;Park, H.H.
    • Nuclear Engineering and Technology
    • /
    • v.26 no.1
    • /
    • pp.54-62
    • /
    • 1994
  • The hydraulic properties of domestic natural clay/crushed rock mixture suggested as a candidate backfill material for the low and intermediate level waste repository were investigated. The dry density-water content relationship was studied to define an optimum water content that gives a maximum attainable dry density at constant compaction pressure. The hydraulic conductivities of clay/crushed rock mixture as a function of clay content were also measured. As the clay content decreased, the maximum attainable dry density increased and the optimum water content became more distinct. However the attainable density is not significantly sensitive to water content. The hydraulic conductivities of the mixture increased from 5 $\times$ 10$^{-12}$ m/s to 7 $\times$ 10$^{-10}$ m/s with clay content decreasing from 100 wt.% to 25 wt.% at dry density of 1.2 Mg/㎥. In case of dry density of 1.5 Mg/㎥, they maintain the lower values of 5 $\times$ 10$^{-12}$ m/s even at 25 wt.% clay content. The concept of effective clay dry density was suggested to estimate the hydraulic conductivity of the mixture. It was shown that the effective clay dry density concept can explain welt the hydraulic conductivities of the mixtures with various dry density and crushed rock content.

  • PDF

Performance Evaluation for All-In-One Construction Method of Curbstone and Gutter Using Formwork Rail and Jig (거푸집 레일과 지그를 이용한 경계석 및 측구의 일체형 시공법에 대한 성능평가)

  • Choi, Jae-Jin;Ko, Man-Gi;Kim, Kyoung-Ju;Choi, Khyung-Dong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6A
    • /
    • pp.525-534
    • /
    • 2010
  • A road curbstone is a structure installed at the boundary of the sidewalk and the street with the objectives of road drainage, drawing attention and such. The current general construction method of curbstones places foundation concrete for the curbstones first, waits until the concrete reaches the strength to support the curbstones, places the curbstones on top, and then places the gutter and rear filling concrete. Such method has the issues of poor compaction and weakened bond strength of concrete due to split placing of concrete, and causes the curbstones to easily separate due to vehicle impact or earth pressure, in turn creating maintenance costs and spoiling the aesthetics. To improve such conventional construction methods, an all-in-one method was developed using formwork rail and jig where both the curbstones and gutter can be worked at the same time, and to evaluate the structural performance, static tests of lateral loading test, pullout test, and bending test were executed, and dynamic tests such as pendulum test and actual vehicle impact test were executed. In all tests, the all-in-one construction method using formwork rail and jig was shown to be superior to the conventional construction method by the increase of construction quality and bond strength of concrete.

S-Nitrosoglutathione (GSNO) Alleviates Lead Toxicity in Soybean by Modulating ROS, Antioxidants and Metal Related Transcripts

  • Methela Nusrat Jahan;Islam Mohammad Shafiqul;Da-Sol Lee;Youn-Ji Woo;Bong-Gyu Mun;Byung-Wook Yun
    • Proceedings of the Korean Society of Crop Science Conference
    • /
    • 2023.04a
    • /
    • pp.105-105
    • /
    • 2023
  • Heavy metals, including lead (Pb) toxicity, are increasing in soil and are considered toxic in small amounts. Pb contamination is mainly caused by industrialization - smelting, mining. Agricultural practices - sewage sludge, pests and urban practices - lead paint. It can seriously damage and threaten crop growth. Pb can adversely affect plant growth and development by affecting the photosystem, cell membrane integrity, and excessive production of reactive oxygen species (ROS) such as hydrogen peroxide (H2O2)andsuperoxide(O2.-). NO is produced via enzymatic and non-enzymatic antioxidants to scavenge ROS and lipid peroxidation substrates in terms of protecting cells from oxidative damage. Thus, NO improves ion homeostasis and confers resistance to metal stress. Our results here suggest that exogenous NO may aid in better growth under lead stress. These enhancements may be aided by NO's ability in sensing, signaling and stress tolerance in plants under heavy metal stress in combination with lead stress. Our results show that GSNO has a positive effect on soybean seedling growth in response to axillary pressure and that NO supplementation helps to reduce chlorophyll maturation and relative water content in leaves and roots following strong burst under lead stress. GSNO supplementation (200 µM and 100 µM) reduced compaction and approximated oxidative damage of MDA, proline and H2O2. Under plant tension, a distorted appearance was found in the relief of oxidative damage by ROS scavenging by GSNO application. In summary, modulation of these NO, PCS and prolongation of metal past reversing GSNO application confirms the detoxification of ROS induced by toxic metal rates in soybean. In summary, these NO, PCS and metal traditionally sustained rates of reverse GSNO application confirm the detoxification of ROS induced by toxic metal rates in soybean.

  • PDF