검색결과 762건 처리시간 0.027초

연약지반 개량 시공의 실제와 문제점 (The Reality and Problem of Soft Ground Improvement Construction)

  • 최귀봉;황성원;김종렬
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.672-679
    • /
    • 2008
  • During recent years, the large soft ground improvements very rapidly increase with industrial development and it is the types and scales of structure that is enlarged by degree. Then, we must enter construct equipment to improve soft ground and we fulfilled works by carrying out soft clay soil to gain trafficability for them. For improving the soft ground, we lay geotextile on soft clay ground and fill the filter sand that can drain the pore water. Then, we landfill cover soil for come by trafficability of construction tools. Ater that we penetrate vertical drain for dehydration through soft ground. there are very complicated works. For these reason we suggest the methods of soft ground improvement constructions.

  • PDF

단층이 토목구조물에 미치는 영향과 지반조사(사례 중심으로) (Influence of fault on civil structure and geotechnical investigation (Case Histories))

  • 박남서
    • 지질공학
    • /
    • 제10권2호
    • /
    • pp.113-133
    • /
    • 2000
  • 토목 구조물의 합리적인 설계를 위한 지반조사의 역할은 대상 구조물의 최적 위치를 설정하는 일에서부터 시공 방법의 선정이나 안정성을 확보하는 일에 이르기까지 필요한 각종 정보를 제공하는 것이다. 인간 생활 환경의 확대에 따라 불리한 지반 조건에 공사를 수행하여야 하는 경우가 점차 많아지고, 이에 따라 발생하는 문제에 있어서는 다양하고 복잡하여 이를 해결할 수 있기 위해서는 토목 시공뿐만 아니라 지반 자체에 대한 폭넓은 이해가 필요하게 되었다. 이에 본 고에서는 여러 가지 지질 구조 중 토목 구조물의 안정성에 가장 크게 영향을 미치는 단층과 관련된 여러 가지 사례를 소개하였으며 각 사례에 있어서 단층에 대한 대책을 분석, 요약하였다.

  • PDF

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

Study on strength of reinforced concrete filled circular steel tubular columns

  • Hua, Wei;Wang, Hai-Jun;Hasegawa, Akira;Shioi, Yukitake;Iwasaki, Shoji;Miyamoto, Yutaka
    • Structural Engineering and Mechanics
    • /
    • 제19권6호
    • /
    • pp.653-677
    • /
    • 2005
  • Concrete filled steel tubular columns (CFT) are widely used in civil engineering works, especially in large scale of works because of high strength, deformation, toughness and so on. On the other hand, as a kind of strengthening measure for seriously damaged reinforced concrete piers of viaduct in Hansin-Awaji earthquake of Japan in 1995, reinforced concrete piers were wrapped with steel plate. Then, a new kind of structure appeared, that is, reinforced concrete filled steel tubular column (RCFT). In this paper, compression test and bending-shearing test on RCFT are carried out. The main parameters of experiments are (1) strength of concrete, (2) steel tube with or without rib, (3) width-thickness ratio and (4) arrangement of reinforcing bars. According to the experimental results, the effect of parameters on mechanical characteristics of RCFT is analyzed clearly. At the same time, strength evaluation formula for RCFT column is proposed and tested by experimental results and existed recommendations (AIJ 1997). The strength calculated by the proposal formula is in good agreement with test result. As a result, the proposed evaluation formula can evaluate the strength of RCFT column properly.

도로 건설공사의 안전관리정보시스템 개발 (Safety Management Information System in Roads Construction Work)

  • 박종근
    • 한국안전학회지
    • /
    • 제27권2호
    • /
    • pp.72-77
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as earth works, drainage works, pavement works, appurtenant works and etc based on accident examples and investigation on actual condition in roads construction work. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

3차원 지형자료와 토목 BIM의 사례적용 연구 (Case Study of Civil-BIM & 3D Geographical Information)

  • 박재선;편무욱;조준호;이건호
    • 한국측량학회지
    • /
    • 제29권6호
    • /
    • pp.569-576
    • /
    • 2011
  • 최근 3차원 공간정보 수요의 증가로 인해 고정밀의 3차원 공간정보 구축이 활성화되고 있다. 이렇게 구축되고 있는 3차원 공간정보를 활용하여 건설 토목분야에서는 타 분야와의 융합을 통해 그 생산성을 높이기 위해 다양한 연구가 진행 중이다. 이러한 추세로 건설 및 토목분야에서의 BIM(Building Information Modeling) 기술이 빠르게 적용되고 있다. 특히, 계획-설계-시공-유지보수와 같은 생애주기를 지닌 건설 토목 분야에서는 각 단계별 특징에 맞도록 BIM 활용 방법 및 방안 등이 제시되고 있다. 따라서 본 논문에서는 기존의 경험적, 통계적 데이터베이스와 2차원 정보를 바탕으로 시행된 토목공사 프로세스에서 벗어나 3차원 공간정보와 BIM 기술을 연계하여 합리적이고 최적화 가능한 프로젝트를 시뮬레이션 하기 위함에 있다. 이를 위하여 항공사진과 항공라이다를 이용하여 연구지역에 대한 3차원 지형데이터를 구축하였으며, 구축된 지형데이터와 교량 구조물 설계자료와의 통합 BIM 모델을 구축하여 실험지역에 적용함으로써 그 활용성을 사례를 통해 분석하였다.

플랜트 건설공사의 안전관리 정보시스템 개발 (Safety Management Information System in Plants Construction Work)

  • 박종근
    • 대한안전경영과학회지
    • /
    • 제14권4호
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.