Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

원조전문직의 문화적 역량 선행요인에 관한 연구 - 사회복지사, 교사, 간호사, 사회복지공무원을 중심으로 - (A Study on the Antecedent Factors Affecting Helping Professions' Cultural Competence - Focusing on Social Workers, Teachers, Nurses, and Social Work Civil Servants -)

  • 최소연
    • 한국사회복지학
    • /
    • 제64권2호
    • /
    • pp.5-29
    • /
    • 2012
  • 본 연구는 사회복지사, 교사, 간호사, 사회복지공무원의 문화적 역량 현황과 선행요인을 파악하기 위해 진행되었다. 연구결과 교사의 문화적 역량이 가장 높았으며 사회복지사, 공무원, 간호사 순이었다. 문화적 역량 선행요인으로는 연령, 교육수준, 외국어구사여부, 다문화업무시간, 종사기간, 교육훈련시간, 조직의 지원이 영향을 미치는 것으로 확인되었으며, 각 직군 간에 유의미한 선행요인에도 차이가 있는 것으로 나타났다. 연구결과를 토대로 문화적 역량을 제고하기 위한 정책적 방향과 실천적 함의를 제시하였다.

  • PDF

건설장비 AR 네비게이터 개발을 위한 작업-시각정보 맵 도출 (Task-Visual Information Map to Develop AR Navigators of Construction Equipment)

  • 송수진;강호준;김한빈;문태남;신도형
    • 한국건설관리학회논문집
    • /
    • 제17권3호
    • /
    • pp.116-124
    • /
    • 2016
  • 건설현장의 주요 작업인 토공사의 경우, 토공 건설장비를 운용하는 개별 작업자에 의해서 작업의 효율성이 좌우되기 때문에 개별 작업자의 숙련도가 전체적인 공사일정에 큰 영향을 미칠 수 있다. 건설현장에는 그 특성상 현장 내 설치된 구조물이나 장비 혹은 움직이는 작업자들이나 장비 등으로 인해 시야가 가려져서 발생하게 되는 비가시 영역이 필연적으로 존재한다. 이와 같은 작업 관련 시각정보의 부재는 작업자가 건설장비를 효율적으로 운용하는데 있어서 결정적인 저해요소가 된다. 증강현실(AR, Augmented Reality)은 현실세계에 가상물체를 중첩시켜 보여주는 컴퓨터 기술이다. 이 기술의 특성을 이용하면 토공사를 수행하는 과정에서의 시각정보 부재 문제를 해결할 수 있고 이를 통한 건설장비의 작업 효율성 향상이 가능하다. 본 연구의 목적은 이러한 토공사에서의 필요 시각정보를 도출하기 위한 작업-시각정보 맵을 제시하고 굴삭기의 작업들 중 AR기술을 적용하기에 적합한 것을 찾아내는 것이다. 연구의 대상이 되는 건설장비는 굴삭기로 한정하였다. 작업-시각정보 맵은 굴삭기 토공작업의 문제점과 그 문제점을 해결하는데 필요한 시각정보를 기반으로 하여 작성되었다. 이 맵으로부터 굴삭기의 작업 효율성을 향상시킬 수 있고, AR기술을 적용하기에도 적합한 4가지 필요 시각정보가 도출되었다. 연구결과를 바탕으로 하여 추후 건설장비 AR 네비게이터 시스템을 더욱 효과적으로 개발할 수 있을 것이라 기대한다.

공동주택 토목공사의 책임기술자와 품질의 상관관계 분석 (Correlation analysis of the quality and civil construction engineer in apartment house)

  • 정상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

Evaluation of Structural Behaviour of High Performance Permanent Form with Stainless Steel Fiber

  • Sim Jong Sung;Oh Hong Seob;Ju Min Kwan;Shih Hyun Yang;Han Jeong Jin;Sohn Yushin
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2005년도 봄학술 발표회 논문집(I)
    • /
    • pp.499-502
    • /
    • 2005
  • Nowadays, the stripping work of form has generated some problems such as increasing total constructing cost result from delayed work schedule by the stripping work of form and environmental issues by wasting the debonded form. According to recent research for form work, it has studied about permanent form to solve economic and environmental problem which is commented above. In this study, high performance permanent form method was developed and tested by adopting COM and TEN specimens adopted on the Compression and Tensile section then the structural behaviour was investigated. In the test result, the specimen adopted the form showed better structural performance than control specimen in the point of ductility, failure mode and ultimate load.

  • PDF

발파해체현장에서 발생하는 순간분진의 입경분포 특성 (Characteristics of Particle Size Distributions Generated in the Vicinity of Building Blasting Demolition Sites)

  • 이경희;김효진;박찬규;고광백
    • 한국환경과학회지
    • /
    • 제18권1호
    • /
    • pp.41-47
    • /
    • 2009
  • In building demolition work, major dust-generating activities are blasting concrete and rock. The aim of this study was to find the characteristic of particle size of dusts which were generated during building demolition work using explosion. The DustMate of the Turnkey-Instruments Ltd. was used for particulate size-selective sampling of the four sites. TSP(Total Suspended Particle), PM10(Particle Matter $10{\mu}m$), PM2.5(Particle Matter $2.5{\mu}m$), and PM1.0(Particle Matter $1.0{\mu}m$) were measured during building demolition work using explosion. The large particulate (higher than the diameter $10{\mu}m$) showed to be higher than 50%. The particulate ranged from $10{\mu}m\;to\;2.5{\mu}m$ showed about 30-40%. PM2.5 was not scarcely detected in the samples collected for building demolition work using explosion. We conclude that the dust generated during building demolition work using explosion has not most respirable particulate.

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권4호
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.

A Study on Logistical Distribution Management and Safety in Thailand's Highway Work Zone: The case of Logistics Drivers

  • MAHASIRIKUL, Narongdet;AKSORN, Preenithi;SRINAVIN, Korb;NGOWTANASUWAN, Grit
    • 유통과학연구
    • /
    • 제20권3호
    • /
    • pp.23-31
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the Safety and Logistical Distribution Management system in Thailand's Highway Work Zone based on data from Logistics drivers. Accidents in highway construction zones have caused enormous casualties in Thailand yearly. Statistical data shows evidence of correlation between numbers of accidents and drivers' recklessness. Research design, data, and methodology: In this study, we conducted an in- depth interview with 414 logistics drivers and highway construction workers in Khon Kaen province, Thailand. The data was collected based on 63 questionnaires aiming at capturing factors contributing to the risk of safety and cause of accidents in logistic infrastructures such as Highway work zone. Results: The result reveals two significant factors affecting safety in highway work zone, which includes construction environment and safety management system. Moreover, the result shows that feeling of afraid and confused while driving within the construction zones significantly affecting driver's risk of having an accident. Conclusions: The findings of this study offer that a strategic planning and evaluation of the logistics drivers' satisfaction and construction workers' participation to mitigate highway accidents at construction zones and that drivers' knowledge and perception toward construction safety management plays a significant role in preventing highway accidents at the construction areas.

마커방식 증강현실기법의 건설현장 적용성 연구 (철근배근 검측업무 사례적용) (Field Applicability of Augmented Reality Technology by Marker Mapping for Construction Project (Focused on Measurement Process of Rebar Work))

  • 김선영;김현승;문현석;강인석
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2509-2518
    • /
    • 2013
  • 증강현실(Augmented Reality, AR) 기술은 현실 환경을 기반으로 컴퓨터에서 생성한 가상의 객체정보를 중첩해봄으로써 가상현실 상에서 느낄 수 없는 실감형 모델을 구현하는 기술이다. 본 연구에서는 토목공사 철근배근 작업에 증강현실 기술을 적용하는 방법론과 시스템 시제품을 구성하여 철근공사 작업의 증강현실 적용성을 검증하고 있다. 토목공사 현장의 여러 작업들 중에서 철근공사는 절차화된 매뉴얼방식보다는 숙련공의 경험적 방식에 의해 작업이 진행되는 대표적 공정이다. 이러한 공정에 증강현실을 적용하면 당초 계획도면과 비교하여 누락된 철근배근 및 상이한 배근 상태를 시각화하여 계측할 수 있으므로 시공성을 향상시킬 수 있다. 구축된 시스템은 3차원으로 모델링 된 철근객체를 실제 시공현장에 중첩하여 시각화함으로써 철근 조립공정들의 작업 이해도를 높이고, 검측단계에 활용함으로써 철근조립작업에서 발생할 수 있는 하자와 재작업으로 인한 비용증가를 억제할 수 있을 것이라 기대된다.