Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

A Study on the Antecedent Factors Affecting Helping Professions' Cultural Competence - Focusing on Social Workers, Teachers, Nurses, and Social Work Civil Servants - (원조전문직의 문화적 역량 선행요인에 관한 연구 - 사회복지사, 교사, 간호사, 사회복지공무원을 중심으로 -)

  • Choi, So-Yun
    • Korean Journal of Social Welfare
    • /
    • v.64 no.2
    • /
    • pp.5-29
    • /
    • 2012
  • This study examines the present conditions and antecedent factors affecting helping professions' cultural competence, focusing on such groups as social workers, teachers, nurses, and social work civil servants. The analysis of data shows that teachers' cultural competence is the highest, social workers, social work civil servants, and nurses are descending order. The study also found significant antecedent factors: (1)individual antecedent factors are age, education, and foreign language skill; (2)work-related antecedent factors are multicultural working hours and working duration; (3)organizational antecedent factors are education/training and organizational support. Finally, the study suggests policy directions and practical implications for enhancing cultural competence.

  • PDF

Task-Visual Information Map to Develop AR Navigators of Construction Equipment (건설장비 AR 네비게이터 개발을 위한 작업-시각정보 맵 도출)

  • Song, Sujin;Kang, Hojun;Kim, Hanbeen;Moon, Taenam;Shin, Do Hyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.116-124
    • /
    • 2016
  • Work efficiency of earth work which is one of the main works occurring in construction site mainly depends on the performance of individual operators of earth work equipment. Consequently, the skill of individual operators of earth work equipment can significantly affect overall construction schedules. Many invisible areas inevitably exist in construction site because of the nature of construction site where occlusions occur from structures being built, installed or moving equipment, moving workers, etc. The lack of visual information regarding tasks critically impedes the effective performance of operators of earth work equipment. AR (Augmented Reality) is a computer technology that superimposes virtual objects onto the real world scene. This characteristic of AR may address the lack of visual informations in earth work process, thus helping to improve the work efficiency of operators of earth work equipment. The purpose of this study is to present a task-visual information map that identifies visual informations required in tasks of earth work and which of the tasks are suitable for AR technology. This study focuses on visual informations in tasks of earth work with excavators. The map was created based on the investigations on the problems of each task of earth work with excavators and visual informations required to address the problems. Through the map, four visual informations were found to be suitable for AR technology to improve the work efficiency of excavator operators. Based on the findings of this study, AR systems for excavators can be developed more effectively.

Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

Evaluation of Structural Behaviour of High Performance Permanent Form with Stainless Steel Fiber

  • Sim Jong Sung;Oh Hong Seob;Ju Min Kwan;Shih Hyun Yang;Han Jeong Jin;Sohn Yushin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05a
    • /
    • pp.499-502
    • /
    • 2005
  • Nowadays, the stripping work of form has generated some problems such as increasing total constructing cost result from delayed work schedule by the stripping work of form and environmental issues by wasting the debonded form. According to recent research for form work, it has studied about permanent form to solve economic and environmental problem which is commented above. In this study, high performance permanent form method was developed and tested by adopting COM and TEN specimens adopted on the Compression and Tensile section then the structural behaviour was investigated. In the test result, the specimen adopted the form showed better structural performance than control specimen in the point of ductility, failure mode and ultimate load.

  • PDF

Characteristics of Particle Size Distributions Generated in the Vicinity of Building Blasting Demolition Sites (발파해체현장에서 발생하는 순간분진의 입경분포 특성)

  • Lee, Kyoung-Hee;Kim, Hyo-Jin;Park, Chan-Gyu;Ko, Kwang-Baik
    • Journal of Environmental Science International
    • /
    • v.18 no.1
    • /
    • pp.41-47
    • /
    • 2009
  • In building demolition work, major dust-generating activities are blasting concrete and rock. The aim of this study was to find the characteristic of particle size of dusts which were generated during building demolition work using explosion. The DustMate of the Turnkey-Instruments Ltd. was used for particulate size-selective sampling of the four sites. TSP(Total Suspended Particle), PM10(Particle Matter $10{\mu}m$), PM2.5(Particle Matter $2.5{\mu}m$), and PM1.0(Particle Matter $1.0{\mu}m$) were measured during building demolition work using explosion. The large particulate (higher than the diameter $10{\mu}m$) showed to be higher than 50%. The particulate ranged from $10{\mu}m\;to\;2.5{\mu}m$ showed about 30-40%. PM2.5 was not scarcely detected in the samples collected for building demolition work using explosion. We conclude that the dust generated during building demolition work using explosion has not most respirable particulate.

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.

A Study on Logistical Distribution Management and Safety in Thailand's Highway Work Zone: The case of Logistics Drivers

  • MAHASIRIKUL, Narongdet;AKSORN, Preenithi;SRINAVIN, Korb;NGOWTANASUWAN, Grit
    • Journal of Distribution Science
    • /
    • v.20 no.3
    • /
    • pp.23-31
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the Safety and Logistical Distribution Management system in Thailand's Highway Work Zone based on data from Logistics drivers. Accidents in highway construction zones have caused enormous casualties in Thailand yearly. Statistical data shows evidence of correlation between numbers of accidents and drivers' recklessness. Research design, data, and methodology: In this study, we conducted an in- depth interview with 414 logistics drivers and highway construction workers in Khon Kaen province, Thailand. The data was collected based on 63 questionnaires aiming at capturing factors contributing to the risk of safety and cause of accidents in logistic infrastructures such as Highway work zone. Results: The result reveals two significant factors affecting safety in highway work zone, which includes construction environment and safety management system. Moreover, the result shows that feeling of afraid and confused while driving within the construction zones significantly affecting driver's risk of having an accident. Conclusions: The findings of this study offer that a strategic planning and evaluation of the logistics drivers' satisfaction and construction workers' participation to mitigate highway accidents at construction zones and that drivers' knowledge and perception toward construction safety management plays a significant role in preventing highway accidents at the construction areas.

Field Applicability of Augmented Reality Technology by Marker Mapping for Construction Project (Focused on Measurement Process of Rebar Work) (마커방식 증강현실기법의 건설현장 적용성 연구 (철근배근 검측업무 사례적용))

  • Kim, SunYoung;Kim, HyeonSeung;Moon, HyounSeok;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2509-2518
    • /
    • 2013
  • Augmented reality (AR) technology visualizes a real type object that cannot simulate in virtual reality technology by overlapping a virtual object and real object in a computer system. This study suggests a methodology and prototype system for applying AR system to rebar distribution work in a civil engineering project. Rebar work in civil engineering project is a representative activity that is progressed by empirical approach of skilled labor rather than formalized manual. AR technology improves the constructability of rebar work because AR tool can identify missing rebars and different rebars comparing with the drawings. AR system developed in this study can enhance the understanding of rebar work using 3D modeling with real image of construction site and save construction cost by reducing reconstruction work.