• Title/Summary/Keyword: civil engineering framework construction

Search Result 207, Processing Time 0.024 seconds

A CASE STUDY OF TAIWAN'S FRAMEWORK TO EVALUATE UNSOLICITED PUBLIC/PRIVATE PARTNERSHIP PROPOSALS

  • Ying-Yi Chih;Yaw-Kuang Chen
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.218-228
    • /
    • 2007
  • The acceptance of unsolicited proposals (a private-initiated process) has been viewed by several governments as a means of encouraging innovative initiatives. However, the ramifications of this mechanism are still poorly understood. This paper analyzes a framework used by the Taiwanese government to evaluate unsolicited proposals. Taiwan's experience demonstrates the need for an improved framework in which key issues such as building consensus, maintaining a transparent procurement process, ensuring sufficient competition, and protecting intellectual property rights shall be addressed. In addition, the case study suggests that the roles of participants, the relationships and interfaces of activities, information flows, and decision making points should all be well defined. Some fundamental differences between solicited and unsolicited proposals are also discussed.

  • PDF

Generating a Simplistic 3D Model for Mobile Platform Applications

  • Ahmed, Naveed;Park, Jee Woong;Morris, Brendan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1093-1099
    • /
    • 2022
  • The number of buildings is increasing day by day. The next logical footstep is tackling challenges regarding scarcity of resources and sustainability, as well as shifting focus on existing building structures to renovate and retrofit. Many existing old and heritage buildings lack documentation, such as building models, despite their necessity. Technological advances allow us to use virtual reality, augmented reality, and mixed reality on mobile platforms in various aspects of the construction industry. For these purposes, having a BIM model or high detail 3D model is not always necessary, as a simpler model can serve the purpose within many mobile platforms. This paper streamlines a framework for generating a lightweight 3D model for mobile platforms. In doing so, we use an existing structure's site survey data for the foundation data, followed by mobile VR implementation. This research conducted a pilot study on an existing building. The study provides a process of swiftly generating a lightweight 3D model of a building with relative accuracy and cost savings.

  • PDF

Cost Normalization Framework for a Benchmarking System: A Case for Downstream and Chemical Construction Projects

  • Yin, Zhe;DeGezelle, Deborah;Pappas, Mike;Caldas, Carlos
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.590-598
    • /
    • 2022
  • Benchmarking is an important tool to assess the performance of capital projects in the construction industry. Incorporating cost-related metrics into a benchmarking system requires an effective cost normalization process to enable meaningful comparisons among projects that were executed at different locations and times. Projects in the downstream and chemicals sector have unique characteristics compared to other types of construction projects, they require a distinctive cost normalization framework to be developed to benchmark their absolute cost performance. The purpose of this study is to develop such a framework to be used for the case of benchmarking the downstream and chemical projects for their performance assessment. The research team started with a review of existing cost normalization methodologies adopted in benchmarking systems and conducted 7 interviews to identify the current cost normalization practices used by industrial professionals. A panel of 12 experts was then convened and it held 6 review sessions to accomplish the framework development. The cost normalization framework for benchmarking downstream and chemical projects was established as a three-step procedure and it adopts a 4-element cost breakdown structure to accommodate projects submitted by both owners and contractors. It also incorporated 5 published cost indexes that are compatible with downstream and chemical projects and they were embedded into 2 options to complete the normalization process. The framework was then pilot-tested on 4 completed projects to validate its functional practicality and the downstream and chemical use case in the benchmarking system.

  • PDF

A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam

  • Ha, Tran Thanh;Hoai, Long Le;Lee, Young Dai
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.35-43
    • /
    • 2015
  • Project Management Consultant (PMC) plays a vital role in the overall performance of any project. Selecting right PMC for right project is the most crucial challenge for any construction owner. Thus, PMC selection is one of the main decisions made by owners at the early phase of construction project. It is not easy for the project owner to select a competent PMC due to the fuzziness, imprecision, vagueness, incomplete and qualitative criteria of the decision. This paper presents a model for selecting PMC contractor using the Fuzzy Analytical Hierarchy Process (FAHP). And a fuzzy number based framework is proposed to be a viable method for PMC contractor selection. A case study to illustrate the application of the model is also presented in this paper.

Vision-based full-field panorama generation by UAV using GPS data and feature points filtering

  • Guo, Yapeng;Xu, Yang;Niu, Haowei;Li, Zhonglong;E., Yuhui;Jiao, Xinghua;Li, Shunlong
    • Smart Structures and Systems
    • /
    • v.25 no.5
    • /
    • pp.631-641
    • /
    • 2020
  • To meet the urgent requirements of safety surveillance from civil engineering management authorities, this study proposes a refined and efficient approach to generate full-field high-resolution panorama of construction sites using camera-amounted UAV (Unmanned Aerial Vehicle). GPS (Global Position System) information extraction for pre-registration, feature points filtering for efficient registration and optimal seaming line seeking for fusion are performed in sequence to form the full-field panorama generation framework. Advantages of the proposed method are as follows. First, GPS information can sort images for pre-registration, avoiding inefficient repeated pairwise calculations and matching. Second, the feature points are filtered according to the characteristics of the construction site images to reduce the amount of calculation. The proposed framework is validated on a road construction site and results demonstrate that it can generate an accurate and high-quality full-site panorama for the safety supervision in a much efficient manner.

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

BETTER INPUTS FOR KNOWLEDGE MANAGEMENT INFORMATION SYSTEMS: KNOWLEDGE SHARING MODELING AND THE INCENTIVES SYSTEM DESIGN

  • S. Ping Ho;Yaowen Hsu;Szu-Wei Lo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.564-568
    • /
    • 2005
  • Recently, Knowledge Management (KM) has been applied to construction industry. Surprising, there is few studies that address the most fundamental problem in KM: people may prefer not to share their knowledge so as to preserve their intellectual or unique values in the organization. Without the premise of each individual's willingness to share knowledge, there will be no valuable input for the IT system and, thus, no knowledge management at all. This paper aims to model the behavioral dynamics of knowledge sharing and to design an incentive system that may facilitate knowledge sharing for construction companies. In this paper, a game-theory based model will be developed, and the framework for designing an incentive system will be proposed according to the model.

  • PDF

Intensity and Ambient Enhanced Lidar-Inertial SLAM for Unstructured Construction Environment (비정형의 건설환경 매핑을 위한 레이저 반사광 강도와 주변광을 활용한 향상된 라이다-관성 슬램)

  • Jung, Minwoo;Jung, Sangwoo;Jang, Hyesu;Kim, Ayoung
    • The Journal of Korea Robotics Society
    • /
    • v.16 no.3
    • /
    • pp.179-188
    • /
    • 2021
  • Construction monitoring is one of the key modules in smart construction. Unlike structured urban environment, construction site mapping is challenging due to the characteristics of an unstructured environment. For example, irregular feature points and matching prohibit creating a map for management. To tackle this issue, we propose a system for data acquisition in unstructured environment and a framework for Intensity and Ambient Enhanced Lidar Inertial Odometry via Smoothing and Mapping, IA-LIO-SAM, that achieves highly accurate robot trajectories and mapping. IA-LIO-SAM utilizes a factor graph same as Tightly-coupled Lidar Inertial Odometry via Smoothing and Mapping (LIO-SAM). Enhancing the existing LIO-SAM, IA-LIO-SAM leverages point's intensity and ambient value to remove unnecessary feature points. These additional values also perform as a new factor of the K-Nearest Neighbor algorithm (KNN), allowing accurate comparisons between stored points and scanned points. The performance was verified in three different environments and compared with LIO-SAM.

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

Automated 3D Model Reconstruction of Disaster Site Using Aerial Imagery Acquired By Drones

  • Kim, Changyoon;Moon, Hyounseok;Lee, Woosik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.671-672
    • /
    • 2015
  • Due to harsh conditions of disaster areas, understanding of current feature of collapsed buildings, terrain, and other infrastructures is critical issue for disaster managers. However, because of difficulties in acquiring the geographical information of the disaster site such as large disaster site and limited capability of rescue workers, comprehensive site investigation of current location of survivors buried under the remains of the building is not an easy task for disaster managers. To overcome these circumstances of disaster site, this study makes use of an unmanned aerial vehicle, commonly known as a drone to effectively acquire current image data from the large disaster areas. The framework of 3D model reconstruction of disaster site using aerial imagery acquired by drones was also presented. The proposed methodology is expected to assist rescue workers and disaster managers in achieving a rapid and accurate identification of survivors under the collapsed building.

  • PDF