• Title/Summary/Keyword: checking

Search Result 3,163, Processing Time 0.029 seconds

Effect that plan of banquet event gets in customer satisfaction and revisit (연회행사의 기획이 고객만족 및 재방문 의도에 미치는 영향)

  • Seong, Yeon
    • Journal of Applied Tourism Food and Beverage Management and Research
    • /
    • v.17 no.2
    • /
    • pp.39-60
    • /
    • 2006
  • This study can realize customer satisfaction by planning in the advance and progresses event to business relation employee and event host and event participation customer of banquet event and mutually between in preparation checking process understand and I wished to explain that revisit is high. Specially, customer discovered that they are more satisfied to enfilade circle when banquet event preparation, progress recognized higher quality of service by plan. Furthermore, was expose that customer satisfaction for enfilade won improves relation quality because constructs trust about enfilade circle and banquet event, and customer loyalty degree to banquet hall. These study finding is presenting suggestion point of inside marketing that can affect to Saengjone of tissue because enfilade circle satisfaction can influence in customer possession in view of plan checking for enfilade won. Therefore, studied relation that exert effect that customers who use banquet event in this study are some in contents and customer satisfaction of plan, customer revisit that is late.

  • PDF

A case study on the evaluation of pile damage during driving by PDA testing. (PDA 시험을 이용한 말뚝손상 판단에 관한 사례 연구)

  • 송명준;박영호;이영남
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.334-341
    • /
    • 2002
  • Nowadays, owing to the development of analysis techniques for PDA test, we can evaluate the serious damage of pile during driving in site. In this study, we checked the damage of pile by pulling it out after evaluation of the pile damage during driving by PDA testing. After that, almost damaged pile was checked and the outline depth of damage could be verified. To increase the quality of driven pile, we have to increase the number of PDA testing for drivability analysis with checking the damage especially for preliminary pile driving and dynamic load test for checking the bearing capacity and consider the application of driving by energy monitoring.

  • PDF

Consistency Checking Rules of Variability between Feature Model and Elements in Software Product Lines (소프트웨어 제품라인의 휘처모델과 구성요소간 가변성에 대한 일관성 검증 규칙)

  • Kim, Se-Hoon;Kim, Jeong-Ah
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.1
    • /
    • pp.1-6
    • /
    • 2014
  • Many companies have tried to adopt Software Product Line Engineering for improving the quality and productivity of information systems and software product. There are several models defined in software product line methodology and each model has different abstraction level. Therefor it is important to maintain the traceability and consistency between models. In this paper, consistency checking rules are suggested by traceability matrix of work products.

A Preliminary Study for Reformation(or Improvement) of Construction Safety Inspection Systems (건설현장 안전점검체계 개선을 위한 기초연구)

  • Han, Jae-Goo;Lee, Soo-Kyong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.104-105
    • /
    • 2014
  • Construction safety inspections come in a wide variety of types. The types of inspection are, 1) a self-checking and a periodical-checking by contractors, 2) a site inspection by Ministry of Land, Infrastructure and Transprt (MOLIT) or licensing organizations and 3) others. In this situation, there are needs to determine fuction of the safty inspection and roll of stakeholders for the inspection to avoid unnecessary duplication and serious omission. The result of this study indicates a guide line for improving of consturcion safety inspection systems as a fundamental research.

  • PDF

A Study on Productivity Improvement on Welding Line for Vehicle Fuel Tank using Layout Improvement (레이아웃 개선을 통한 차량용 연료탱크 용접라인의 생산성 향상에 관한 연구)

  • Yoo, Sung-Hee;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.215-221
    • /
    • 2010
  • Many researches and projects are actively implemented in the academic world and industrial world in order to increase the productivity through changing utility layout. Effective layout makes the flow of parts and products go on wheels and helps labor forces and utilities to be used efficiently. In this study, we looked at effect on utility layout change through a case of a company making a fuel tank of vehicle in Korea. Due to the layout improvement, this company could have flowshop system on welding line, so the stock in line was decreased, checking the number of stock became easier than before and it was possible to evaluate exact cycle time per unit. Through not only confirming qualitative effect, but also checking quantitative effect such as UPH(Unit per Hour), we obtained the conclusion that the layout improvement increased the productivity.

A Study on the Risk Measurement of Construction Method for Fie1d Work (건축공사를 위한 공법별 리스크 측정에 관한 연구)

  • Yoo In-Geun;Choi Sang-Chun;Cho Taek-Hee;Koo Bron-Woo;Yoon Yer-Wan
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1121-1129
    • /
    • 2005
  • The purpose of this study. was to Identification the Risk of construction method to protect and reduce the risk of construction period. The inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. We tested Risk occurring frequency and it's strength by checking the level of Risk. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, the Check List for finding Risk level of Method was created by using the check list of each Method.

  • PDF

A Network Approach to Check Redundancies and Inconsistencies of Knowledge-Based System Rules (네트워크를 이용한 지식베이스시스템 규칙들의 중복 및 모순검출에 관한 연구)

  • 최성호;박충식;김재희;신동필
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.29B no.1
    • /
    • pp.18-25
    • /
    • 1992
  • In this paper, a rule checker which aids in composing a consistent knowledge base by checking redundancies and inconsistencies in a knowledge base is proposed. The proposed algorithm checks the rules by representing the rule connections as a network . The standard model of the rules adapted in this algorithm is in the Conjunctive Normal Form which includes NOT's, and rules of conventional expert system can be checked by converting them into the standard form by a rule form at converter. When compared with Ginsberg's KB-reducer which is conceptually most similar to the proposed algorithm among existing methods,it is shown by a computer simulation that with 360 rules, the checking time is three times faster and the rate increased as the number of rules increased, but the total memory requirement of the proposed agorithm is 1.2 times larger. The proposed algorithm has further advantages in that it can check circular rule chains and can find the paths of the redundant and inconsistent rules.

  • PDF

A Proxy Acknowledgement Mechanism for TCP Variants in Mobile Ad Hoc Networks

  • Oo, May Zin;Othman, Mazliza;O'Farrell, Timothy
    • Journal of Communications and Networks
    • /
    • v.18 no.2
    • /
    • pp.238-245
    • /
    • 2016
  • A sequence number checking technique is proposed to improve the performance of TCP connections in mobile ad hoc networks. While a TCP connection is initialized, a routing protocol takes the responsibility for checking the hop count between a source and destination pair. If the hop count is greater than a predefined value, the routing protocol decides to use a proxy node. The responsibility of a proxy node is to check the correctness of data packets and inform the missing packets by sending an acknowledgement from a proxy node to the source node. By doing so, the source node is able to retransmit any missing packet in advance without waiting until an end-to-end acknowledgement is received from the destination. Simulation results show that the proposed mechanism is able to increase throughput up to 55% in static network and decrease routing overhead up to 95%in mobile network.

The analysis of checking results and electric shock accident happens at domestic and foreign low-voltage handhole (국내외 저압지중함의 감전사고 및 점검결과 분석)

  • Kim, Han-Sang;Bang, Sun-Bae;Kim, Chong-Min;Han, Woon-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2007.04b
    • /
    • pp.91-94
    • /
    • 2007
  • The increased use of underground power distribution as opposed to overhead lines contributes to the aesthetics of the downtown areas. But there is an inherent risk of accidental electrocution should there be damage to the insulation of the cable because of heavy rain. Should a pedestrian make contact with this cable indirectly, via a man hole cover, electrocution could result. In this paper, we analyse electrical shock accident and checking results in this low-voltage handhole.

  • PDF

Design and Implementation of Large Capacity Cable Checking System using an I/O Buffer Method (입.출력 버퍼방식을 이용한 대용량 케이블 점검 시스템 설계 및 구현)

  • 양종원
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.5 no.2
    • /
    • pp.103-115
    • /
    • 2002
  • This paper describes the results on the design and implementation of large capacity cable checking system using I/O buffer method. The I/O buffer module which has feedback loops with input and output buffers is designed with logic gate in the VME board and controlled by MPC860 microprocessor. So this system can check a lot of cable at the same time with less size and less processing time than that of relay matrix method with the A/D converter. The size of the I/O buffer module can be variable according to the number of cable. And any type of cable can be checked even if the pin assignment of cable is changed.