• Title/Summary/Keyword: channel slope

Search Result 388, Processing Time 0.031 seconds

A Study on the Present Situation, Management Analysis, and Future Prospect of the Ornamental Tree Cultivation with respect to Environmental Improvement (환경개선(環境改善)을 위한 녹화수목재배(綠化樹木裁培)의 현황(現況) 및 경영분석(經營分析)과 전망(展望))

  • Park, Tai Sik;Kim, Tae Wook
    • Journal of Korean Society of Forest Science
    • /
    • v.34 no.1
    • /
    • pp.31-46
    • /
    • 1977
  • The study was made to give some helpful information for policy-making on ornamental tree cultivation by doing a survey on general situations, management analysis, and future prospects of the ornamental tree growing. The study was carried out through literature studies related to the subject, questionaire surveys, and on-the-spot investigation. The questionaire surveys could be divided into two parts: pre-questionaire survey and main-questionaire survey. In the pre-questionaire survey, the researchers intended to identify the total number of ornamental tree growers, cultivation areas in size and their locations. The questionaires were sent to each town and county administration authorities, forest cooperatives, and related organizations through-out the nation. The main-questionaires were prepared for detailed study and the questionaires were sent to 200 tree growers selected by option by taking considerations of the number of tree growers and the size of cultivating areas in regions. The main findings and some information obtained in the survey were as follows: 1. The total land for ornamental tree growing was amounted to 1,873.02 hectares and the number of cultivators was totaled to 2,717. 2. The main occupations of the ornamental tree growers were found in horticulture (41.9%), agronomy (25.9%), officialdom (11.3%), animal husbandry (6.5%), business circle(4.8%), and forestry (3.2%) in sequence. 3. The ornamental trees were cultivated mostly upperland (54.8), forest land (19.4%), rice paddy (11.3%) and others. 4. The educational training of the tree growers seemed quite high. The results of the survey indicated that a large number of tree growers was occupied by college graduates (38.7%), and then high school graduates (34.7%), middle school graduates (12.9%) in order. 5. The tree farming was undertaken as a side-job (41.9%) rather than main-job (23.4%), but a few of respondents rated as subsidiary-job (18.6%). 6. The management status classified by the rate of hired labors used was likely to belong to three categories: independant enterprise management (41.9%); half independant management (31.5%); and self-management (32.4%). 7. The majority of the tree growers sold their products to the consumers through middle-man channel (48.4%), or directly to the house-holder and detailers (13.7%), but a few of the respondents answered that they disposed of their products by bidding (11.2%) or by direct selling to the contractors (4.8%). 8. The channel cf marketing seemed somewhat complicated. The results of the survey were as: (1) producers ${\rightarrow}$consumers (22.6%) (2) producers ${\rightarrow}$field middle-men${\rightarrow}$consumers (33.1%) (3) producers ${\rightarrow}$field middle-men${\rightarrow}$first stage brokers${\rightarrow}$consumers (15.3%) (4) producers ${\rightarrow}$field middle-men${\rightarrow}$second stage middle-men${\rightarrow}$brokers${\rightarrow}$consumers (5.7%) (5) producers${\rightarrow}$field middle-men${\rightarrow}$third stage middle-men${\rightarrow}$second stage middlemen${\rightarrow}$brokers${\rightarrow}$consumers (4.8%) 9. It was responded that the margin for each stage of middle-men or brokers was assumed to be 30-50%(33.1%), 20-30%(32.3%), 50-100%(9.7%), and 100-200%(2.4%) in sequence. 10. The difference between the delivery price of consumers and field selling price of the producers seemed quite large. Majority of producers responded that they received half a price compared to the consumer's prices. 11. About two thirds of the respondents opposed to the measure of "Law on Preservation and Utilization of Agricultural Land" in which says that all the ornamental trees grown on flat agricultural lands less than 8 degrees in slope must be transplanted within three years to other places more than 8 degrees in slope. 12. The tree growers said that they have paid rather high land taxes than they ought to pay (38.7%), but come responded that land tax seemed to be appropriate (15.3%), and half of the respondents answered "not known". 13. The measures for the standardization of ornamental trees by size were backed up by a large number of respondents (57.3%), but one third of the respondents showed negative answer (29.8%). 14. About half of the respondents favored the systematic marketing through organization such as forest cooperatives (54%), but quite a few respondents opposed to organizing the systematic marketing channel (36.3%). 15. The necessary measures for permission in ornamental tree cultivation was rejected by a large number of respondents (49.2%) than those of favored (43.6%).

  • PDF

Tectonic Structures and Hydrocarbon Potential in the Central Bransfield Basin, Antarctica (남극 브랜스필드 해협 중앙분지의 지체구조 및 석유부존 가능성)

  • Huh Sik;Kim Yeadong;Cheong Dae-Kyo;Jin Young Keun;Nam Sang Heon
    • The Korean Journal of Petroleum Geology
    • /
    • v.5 no.1_2 s.6
    • /
    • pp.9-15
    • /
    • 1997
  • The study area is located in the Central Bransfield Basin, Antarctica. To analyze the morphology of seafloor, structure of basement, and seismic stratigraphy of the sedimentary layers, we have acquired, processed, and interpreted the multi-channel seismic data. The northwest-southeastern back-arc extension dramatically changes seafloor morphology, volcanic and fault distribution, and basin structure along the spreading ridges. The northern continental shelf shows a narrow, steep topography. In contrast, the continental shelf or slope in the south, which is connected to the Antarctic Peninsula, has a gentle gradient. Volcanic activities resulted in the formation of large volcanos and basement highs near the spreading center, and small-scale volcanic diapirs on the shelf. A very long, continuous normal fault characterizes the northern shelf, whereas several basinward synthetic faults probably detach into the master fault in the south. Four transfer faults, the northwest-southeastern deep-parallel structures, controlled the complex distributions of the volcanos, normal faults, depocenters, and possibly hydrocarbon provinces in the study area. They have also deformed the basement structure and depositional pattern. Even though the Bransfield Basin was believed to be formed in the Late Cenozoic (about 4 Ma), the hydrocarbon potential may be very high due to thick sediment accumulation, high organic contents, high heat flow resulted from the active tectonics, and adequate traps.

  • PDF

Correlations between the Stream Morphological Characteristics and the Hydraulic Geometry Characteristics for the Basin (유역(流域)의 하천형태학적(河川形態學的) 특성(特性)과 수리기하학적(水理幾何學的) 특성(特性)과의 상관성(相關性))

  • Ahn, Sang Jin;Yoon, Yong Nam;Kang, Kwan Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.2 no.1
    • /
    • pp.1-17
    • /
    • 1982
  • The stream morphological characteristics of a river basin has a close correlation with the hydrological and hydraulic characteristics of the basin. In this study the correlations of flow duration and Hydraulic geometry with the stream morphological characteristics as well as the correlation between flow duration and hydraulic geometry were analyzed bases on the data for the Geum River basin. The purpose of this study was to provide the necessary informations for water utilization projects at ungauged locations along the river course. First of all, the stream morphological characteristics was analyzed based on the Horton's three laws on the morphology of a stream that is, the law of stream number, the law of average stream length and the law of average stream slope. As is the case for majority of the rivers it was found that the Geum River basin was well developed according to the Horton's laws. High correlations were also found between the basin characteristics and the channel characteristics. The flow duration curves obtained with the daily stream flow data of 10~90% frequency of occurences at the five stage gauging stations in the Geum River could, in general, be expressed as an exponential functional relationship. The concept of proportional stream ordering system was employed to describe continuously the longitudinal variation of the stream morphological characteristics, and the mathematical model was formulated for the discharge-frequency-proportional stream order relationship. With the morphological characteristics as a common parameter the relationships with flow duration, drainage area were established in mathematical expressions, respectively.

  • PDF

Potential of River Bottom and Bank Erosion for River Restoration after Dam Slit in the Mountain Stream

  • Kang, Ji-Hyun;So, Kazama
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.46-46
    • /
    • 2011
  • Severe sediment erosion during floods occur disaster and economic losses, but general sediment erosion is basic mechanism to move sediment from upstream to downstream river. In addition, it is important process to change river form. Check dam, which is constructed in mountain stream, play a vital role such as control of sudden debris flow, but it has negative aspects to river ecosystem. Now a day, check dam of open type is an alternative plan to recover river biological diversity and ecosystem through sediment transport while maintaining the function of disaster control. The purpose of this paper is to verify sediment erosion progress of river bottom and bank as first step for river restoration after dam slit by cross-sectional shear stress and critical shear stress. Study area is upstream reach of slit check dam in mountain stream, named Wasada, in Japan. The check dam was slit with two passages in August, 2010. The transects were surveyed for four upstream cross-sections, 7.4 m, 34 m, 86 m, and 150 m distance from dam in October 2010. Sediment size was surveyed at river bottom and bank. Sediment of cobble size was found at the wetted bottom, and small size particles of sand to medium gravel composed river bank. Discharge was $2.5\;m^3/s$ and bottom slope was 0.027 m/m. Excess shear stress (${\tau}_{ex}$) was calculated for hydraulic erosion by subtracting the values of critical shear stress (${\tau}_{c}$) from the value of shear stress (${\tau}$) at river bottom and bank (${\tau}_{ex}=\tau-{\tau}_c$). Shear stress of river bottom (${\tau}_{bottom}$) was calculated using the cross-sectional shear stress, and bank shear stress (${\tau}_{bank}$) was calculated from the method of Flintham and Carling (1988). $${\tau}_{bank}={\tau}^*SF_{bank}((B+P_{bed})/(2^*P_{bank}))$$ where $SF_{bank}=1.77(P_{bed}/p_{bank}+1.5)^{-1.4}$, B is the water surface width, $P_{bed}$ and $P_{bank}$ are wetted parameter of the bed and bank. Estimated values for ${\tau}_{bottom}$ for a flow of $2.5\;m^3/s$ were lower as 25.0 (7.5 m cross-section), 25.7 (34 m), 21.3 (86 m) and 19.8 (150 m), in N/$m^2$, than critical shear stress (${\tau}_c=62.1\;N/m^2$) with cobble of 64 mm. The values were insufficient to erode cobble sediment. In contrast, even if the values of ${\tau}_{bank}$ were lower than the values for ${\tau}_{bottom}$ as 18.7 (7.5 m), 19.3 (34 m), 16.1 (86 m) and 14.7 (150 m), in N/$m^2$, excess shear stresses were calculated at the three cross-sections of 7.5 m, 34 m, and 86 m distances compare with ${\tau}_c$ is 15.5 N/$m^2$ of 16mm gravel. Bank shear stresses were sufficient for erosion of the medium gravel to sand. Therefore there is potential to erode lateral bank than downward erosion in a flow of $2.5\;m^3/s$. Undercutting of the wetted bank can causes bank scour or collapse, therefore this channel has potential to become wider at the same time. This research is about a potential of sediment erosion, and the result could not verify with real data. Therefore it need next step for verification. In addition an erosion mechanism for river restoration is not simple because discharge distribution is variable by snow-melting or rainy season, and a function for disaster control will recover by big precipitation event. Therefore it needs to consider the relationship between continuous discharge change and sediment erosion.

  • PDF

The Prototype and Structure of the Water Supply and Drainage System of the Wolji Pond During the Unified Silla Period (통일신라시대 월지(月池) 입·출수 체계의 원형과 구조)

  • Kim, Hyung-suk;Sim, Woo-kyung
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.4
    • /
    • pp.124-141
    • /
    • 2019
  • This research explored the relationship between the water quality issue of Wolji Pond (Anapji Pond) with the maintenance of the channel flow circulation system. The water supply and drainage system closely related to the circulation system of pond has been reviewed, rather than the existing water supply and drainage system that has been analyzed in previous studies. As a result of reviewing the water supply system, it has been learned that the water supply system on the southeastern shore of Wolji Pond, being the current water supply hole, has been connected to the east side garden facility (landscaping stone, curved waterway, storage facility of water) between the north and south fence and the waterway. This separate facility group seems to have been a subject of the investigation of the eastern side of Wolji Pond, with the landscaping stones having been identified in the 1920's survey drawings. The water supply facility on the southeastern shore, being the suspected water supply hole, seems to have some connection with the granite waterway remaining on the building site of Imhaejeon (臨海殿) on the southern side of Wolji Pond. It is inferred that it provides clean water, seeing that the slope towards the southwestern shore of Wolji Pond becomes lower, the landscaping stones have been placed in the filter area, and it is present in the 1920's survey drawings and the water supply hole survey drawing of 1975. The water drainage facility on the northern shore is composed of five stages. The functions of the wooden waterway and the rectangular stone water catchment facility seem not to be only for the water drainage of Wolji Pond. In light of the points that there are wood plugs in the wooden waterway and that there is a water catchment facility in the final stage, it is judged that the water of Balcheon Stream (撥川) may be charged in reverse according to this setup. Namely, the water could enter and exit in either direction in the water drainage facility on the northern shore It also seems that the supply to the wooden waterway could be opened and shut through the water catchment facility of rectangular stone group as well. The water drainage facility on the western shore is very similar to the water drainage facility on the northern shore, so it is difficult to avoid the belief that it existed during the Silla Dynasty, or it has been produced by imitating the water drainage facility on the northern shore at some future point in time. It seems to have functioned as the water drainage facility for the supply of agricultural water during the Joseon Dynasty. The water supply and drainage facilities in Wolji Pond have been understood as a systematized distribution network that has been intertwined organically with the facility of Donggung Palace, which was the center of the Silla capital. Water has been supplied to each facility group, including Wolji Pond, through this structure; it includes the drainage system connecting to the Namcheon River (南川) through the Balcheon Stream, which was an important canal of the capital center.

Analysis of Kap-Chon's Water Level by the Waterside Planting (수변 식재에 따른 갑천의 수위 분석)

  • Woo, Won-Jae;Chung, Dong-Yang
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.1 no.1
    • /
    • pp.3-17
    • /
    • 1998
  • The purposes of this study is to investigate the possibility of planting trees at space land in the riverside. The space land is for the green space. Calculating the plantable space in the representation section and the flood flowing stability of the existing banks based on the hydrological and meteorological data of the Kap-Chon riverbasin located in Tae-jon, the following results are drawn. (1) The flood discharges in each flow section are $698.7m^3/s$ in section 1, $654.6m^3/s$ in section 2, and $1353.3m^3/s$ in section 3 during 100 years recurrence interval. Because the designed-flood discharges in those sections are $1719.9m^3/s$, $2119.7m^3/s$, and $1512.8m^3/s$ respectively, safety for flood flowing is sufficient in existing banks. (2) The possible clearance for planting trees is 1.80m in section 1, 3.90m in section 2, and 0.01m in section 3. Planting clearance is enough in section 1 and 2. However, planting should be planned after estimating a rise-height due to the bridge piers, because many piers under riverine-highway are now on the construction in section 2. The section 3 does not have sufficient clearance for planting trees, but the planting is possible after getting enough flow area with slope by cutting the terrace land on the river artificially heightened. (3) In case of planting a tree 70cm diameter in $1m^2$ in section 1, the water level increases by 0.60m. Planting a tree in a $48m^2$ area increases the water level by 0.90m. Considering that plantable clearance is 1.8m in section 1, it is sufficient to flow safely. But if the trees are planted so compactly from the upper stream, expected heavy resistance is expected due to caught materials on the trees. So, trees have to be planted widely in upper streams but compactedly in lower streams. (4) The river width without changing, Kap-Chon's flow channel can be snaked in accordance with the nature law the wide terrace land in the riverside. Decreased flow area due to planting trees will be compensated by the inclination of terrace land. And, it is theoretically proved that the flood discharge is safe even though the terrace land on the river is parked similar to the nature. Planting trees in the terrace land of the Kap-chon river to the extent that flood flowing is not adversely affected, we can get the enjoyable park to citizens not spending expensive cost. It also contributes to the recovery of ecosystem, which gives the natural beauty of river and shade to citizens and becomes good natural-educational places for children.

  • PDF

Earthquake impacts on hydrology: a case study from the Canterbury, New Zealand earthquakes of 2010 and 2011

  • Davie, Tim;Smith, Jeff;Scott, David;Ezzy, Tim;Cox, Simon;Rutter, Helen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.8-9
    • /
    • 2011
  • On 4 September 2010 an earthquake of magnitude 7.1 on the Richter scale occurred on the Canterbury Plains in the South Island of New Zealand. The Canterbury Plains are an area of extensive groundwater and spring fed surface water systems. Since the September earthquake there have been several thousand aftershocks (Fig. 1), the largest being a 6.3 magnitude quake which occurred close to the centre of Christchurch on 22February 2011. This second quake caused extensive damage to the city of Christchurch including the deaths of 189 people. Both of these quakes had marked hydrological impacts. Water is a vital natural resource for Canterburywith groundwater being extracted for potable supply and both ground and surface water being used extensively for agricultural and horticultural irrigation.The groundwater is of very high quality so that the city of Christchurch (population approx. 400,000) supplies untreated artesian water to the majority of households and businesses. Both earthquakes caused immediate hydrological effects, the most dramatic of which was the liquefaction of sediments and the release of shallow groundwater containing a fine grey silt-sand material. The liquefaction that occurred fitted within the empirical relationship between distance from epicentre and magnitude of quake described by Montgomery et al. (2003). . It appears that liquefaction resulted in development of discontinuities in confining layers. In some cases these appear to have been maintained by artesian pressure and continuing flow, and the springs are continuing to flow even now. In spring-fed streams there was an increase in flow that lasted for several days and in some cases flows remained high for several months afterwards although this could be linked to a very wet winter prior to the September earthquake. Analysis of the slope of baseflow recession for a spring-fed stream before and after the September earthquake shows no change, indicating no substantial change in the aquifer structure that feeds this stream.A complicating factor for consideration of river flows was that in some places the liquefaction of shallow sediments led to lateral spreading of river banks. The lateral spread lessened the channel cross section so water levels rose although the flow might not have risen accordingly. Groundwater level peaks moved both up and down, depending on the location of wells. Groundwater level changes for the two earthquakes were strongly related to the proximity to the epicentre. The February 2011 earthquake resulted in significantly larger groundwater level changes in eastern Christchurch than occurred in September 2010. In a well of similar distance from both epicentres the two events resulted in a similar sized increase in water level but the slightly slower rate of increase and the markedly slower recession recorded in the February event suggests that the well may have been partially blocked by sediment flowing into the well at depth. The effects of the February earthquake were more localised and in the area to the west of Christchurch it was the earlier earthquake that had greater impact. Many of the recorded responses have been compromised, or complicated, by damage or clogging and further inspections will need to be carried out to allow a more definitive interpretation. Nevertheless, it is reasonable to provisionally conclude that there is no clear evidence of significant change in aquifer pressures or properties. The different response of groundwater to earthquakes across the Canterbury Plains is the subject of a new research project about to start that uses the information to improve groundwater characterisation for the region. Montgomery D.R., Greenberg H.M., Smith D.T. (2003) Stream flow response to the Nisqually earthquake. Earth & Planetary Science Letters 209 19-28.

  • PDF

A Study on Evaluation Method for Structural Suitability of Constructed Wetlands in Dam Reservoirs as an Ecological Water Purification System (생태적 수질정화시설로서 댐 저수지 인공습지의 구조 적정성 평가방안)

  • Bahn, Gwon-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.2
    • /
    • pp.23-40
    • /
    • 2022
  • Many constructed wetlands have been installed in dam reservoirs nationwide for ecological purification of watershed pollutants, but aging and reduced efficiency are becoming issues. To improve the management of constructed wetlands, an objective evaluation of structural suitability is required. This study evaluated 39 constructed wetlands of 15 dams. First, through fogus group interview(FGI), survey analysis, and analytic hierarchy process(AHP), eight evaluation items in the physical and vegetative aspects were selected and the evaluation criteria applied with weights were prepared. Second, as a result of the structural suitability evaluation, the average score of the overall constructed wetlands was 80.8, with 10 sites rated as 'good grade(91~100)', 22 sites rated as 'normal grade(71~90)' and 7 sites rated as 'poor grade(70 or less)'. The average score of physical structure evaluation was 52.6, with 14 sites rated as 'good', 21 sites as 'normal' and 4 sites as 'poor'. The suitability of location was good level in most constructed wetlands, but the water supply system, depth of water, ratio of length-to-width, and slope of flow channel were evaluated as 'normal' or less in constructed wetlands of 50% or more. Therefore, it was found that overall improvement was necessary for stable flow supply and flow improvement in the constructed wetland. The average score of vegetative structure evaluation was 28.2, and about 84% of them were identified as 'normal' or lower. As a result of analyzing the Spearman's correlation coefficient between the physical structure evaluation score and the vegetation structure evaluation score, there was a significant correlation(r = 0.728, p < 0.001), and it was found that each evaluation factor also influences each other. As a result of the case review of 6 constructed wetlands, the appropriateness of the evaluation results was confirmed, and it was found that the location, flow rate supply, and type of wetland had a great influence on the efficiency and operation of the wetland. Through this study, it will be possible to derive structural weaknesses of constructed wetlands in dam reservoirs as a nature-based solution, to prepare types and practical alternatives for improved management of each constructed wetland in the future, and to contribute to enhancing various environmental functions.