현장(現場)타설 콘크리트 말뚝공사의 생산성(生產性) 저하요인 분석(分析) (An Analysis on the Productivity Depreciating Factor of Cast-In-Place Piles Work)

  • 이명도;이현석;서장우;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.133-139
    • /
    • 2008
  • Productivity is an important factor of the construction's success and growth. However, compared to the other industries, the study of productivity in the construction industry is still insufficient. Even though the Cast-in-Place piles work is also important in construction process, the research on the productivity is not enough. So, it is necessary for the systematic research on the productivity of Cast-In-Place Piles Work. Therefore, the purpose of the study is to classify lower productivity's cause and find a way to improve these situations. This study will give the checklist for the further study of factoring and improvement of the Cast-in-Place piles work productivity.

  • PDF

Field test of the long-term settlement for the post-grouted pile in the deep-thick soft soil

  • Zou, Jin-Feng;Yang, Tao;Deng, Dong-ping
    • Geomechanics and Engineering
    • /
    • 제19권2호
    • /
    • pp.115-126
    • /
    • 2019
  • The long-term settlement characteristics for the cast-in-place bored pile in the deep-thick soft soil are investigated by post-grouting field tests. Six cast-in-place bored engineering piles and three cast-in-place bored test piles are installed to study the long-term settlement characteristics. Three post-grouting methods (i.e., post-tip-grouting, post-side-grouting, and tip and side post-grouting) are designed and carried out by field tests. Results of the local test show that decreased settlements for the post-side-grouted pile, the post-tip-grouted pile and the tip and side post-grouted pile are 22.2%~25.8%, 30.10%~35.98% and 32.40%~35.50%, respectively, compared with non-grouted piles. The side friction resistance for non-grouted piles, post-side-grouted pile, post-tip-grouted pile and the tip and side post-grouted pile undertakes 89.6~91.3%, 94.6%, 92.4%~93.0%, 95.7% of the total loading, respectively. At last, the parameters back analysis method and numerical calculation are adopted to predict the long-term settlement characteristics of the cast-in-place bored pile in the deep-thick soft soil. Determined Bulk modulus (K) and a creep parameter (Ks) are used for the back analysis of the long-term settlement of the post-grouted pile. The settlement difference between the back analysis and the measurement data is about 1.11%-7.41%. Long-term settlement of the post-grouted piles are predicted by the back analysis method, and the predicted results show that the settlement of the post-grouted pile are less than 6 mm and will be stable in 30 days.

말뚝형태 및 길이변화를 고려한 수평재하말뚝의 거동특성 (Behavior of Lateral Loaded Piles with Pile shape and Length)

  • 황성욱;김민기;경두현;이준환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.1125-1131
    • /
    • 2008
  • In this study, Calibration Chamber Tests for cast-in-place piles in sand were performed for measuring behavior properties of piles. These tests were examined effects of various parameters of soil conditions including the relative density($D_R$), the coefficient of earth pressure, and investigated differences between cylindrical pile and taper-shaped pile with the same volumes. The important effect factors of foundation behavior were investigated by considering embedded depth of piles and shapes of piles, and inspected details of lateral behavior of piles. These results were verified reliabilities of each methods for comparing the results estimated with tests and the results by proposed estimating solutions in the past.

  • PDF

현장 타설 에너지파일을 적용한 지열 히트펌프 시스템의 성능 예측 (Performance Prediction of Geothermal Heat Pump(GHP) System Using Cast-in-Place Energy Piles)

  • 손병후;정경식;최항석
    • 설비공학논문집
    • /
    • 제25권1호
    • /
    • pp.28-36
    • /
    • 2013
  • The aim of this study is to evaluate the performance of the GHP system with 45 cast-in-place energy piles(CEP) for a commercial building. In order to demonstrate the feasibility of a sustainable performance of the system, transient simulations were conducted over 1-year and 20-year periods, respectively. The 1-year simulation results showed that the maximum and minimum temperatures of brine returning from the CEPs were $23.91^{\circ}C$ and $6.66^{\circ}C$, which were in a range of design target temperatures. In addition, after 20 years' operation, these returning temperatures decreased to $21.24^{\circ}C$ and $3.68^{\circ}C$, and finally reached to stable state. Annual average extraction heat of cast-in-place energy piles was 94.3 MWh and injection heat was 65.7 MWh from the 20 years of simulation results. Finally, it is expected this GHP system can operate with average heating SPF of more than 3.45 for long-term.

병렬 U형 현장타설 에너지파일의 열교환 효율 및 적용성 평가 (Evaluation of Heat Exchange Efficiency and Applicability for Parallel U-type Cast-in-place Energy Pile)

  • 박상우;김병연;성치훈;최항석
    • 대한토목학회논문집
    • /
    • 제35권2호
    • /
    • pp.361-375
    • /
    • 2015
  • 에너지파일은 기존의 수직밀폐형 지중열교환기를 경제적으로 대체할 수 있는 새로운 형태의 지중열교환기이다. 즉, 에너지파일은 건물의 기초 구조물과 지중열교환기의 역할을 동시에 수행하는 에너지 구조체로서, 말뚝 기초 내부에 열교환 파이프를 삽입하고 파이프를 통해 유체를 순환시켜 지반과의 열교환을 유도한다. 본 연구에서는 병렬 U형(5쌍, 8쌍, 10쌍)의 열교환 파이프를 대구경 현장타설 에너지파일에 삽입하여, 3본의 에너지파일을 실규모로 시공하였다. 또한 현장 열응답 시험(In-situ thermal response tests, TRTs)을 수행하고 시공된 현장타설 에너지파일과의 열교환 효율을 비교하기 위하여 30m 깊이의 수직밀폐형 지중열교환기를 별도로 시공하였다. 병렬 U형 현장타설 에너지파일에 대해서는 냉난방 부하를 인공적으로 주입하는 열교환 성능 평가시험을 수행하여 열교환 성능(heat exchange rate)을 평가하였다. 마지막으로 현장타설 에너지파일의 적용성 평가를 위해 산정된 상대 열교환 효율(relative heat exchange efficiency) 및 열교환 성능을 선행 연구 결과와 비교하였으며, 본 연구에서 시공된 현장타설 에너지파일은 안정적이고 효율적인 열성능을 보이는 것으로 나타났다.

A simple approach for quality evaluation of non-slender, cast-in-place piles

  • Zhang, Ray Ruichong
    • Smart Structures and Systems
    • /
    • 제4권1호
    • /
    • pp.1-17
    • /
    • 2008
  • This study proposes a conceptual framework of in-situ vibration tests and analyses for quality appraisal of non-slender, cast-in-place piles with irregular cross-section configuration. It evaluates a frequency index from vibration recordings to a series of impulse loadings that is related to total soil-resistance forces around a pile, so as to assess if the pile achieves the design requirement in terms of bearing capacity. In particular, in-situ pile-vibration tests in sequential are carried out, in which dropping a weight from different heights generates series impulse loadings with low-to-high amplitudes. The high-amplitude impulse is designed in way that the load will generate equivalent static load that is equal to or larger than the designed bearing capacity of the pile. This study then uses empirical mode decomposition and Hilbert spectral analysis for processing the nonstationary, short-period recordings, so as to single out with accuracy the frequency index. Comparison of the frequency indices identified from the recordings to the series loadings with the design-based one would tell if the total soil resistance force remains linear or nonlinear and subsequently for the quality appraisal of the pile. As an example, this study investigates six data sets collected from the in-situ tests of two piles in Taipu water pump project, Jiangshu Province of China. It concludes that the two piles have the actual axial load capacity higher than the designed bearing capacity. The true bearing capacity of the piles under investigation can be estimated with accuracy if the amplitude of impact loadings is further increased and the analyses are calibrated with the static testing results.

풍화암에 근입된 현장타설말뚝의 저항계수 산정 (Resistance Factors for Drilled Shafts Embedded in Weathered Rock)

  • 윤홍준;정성준;김명모
    • 한국지반공학회논문집
    • /
    • 제23권8호
    • /
    • pp.107-116
    • /
    • 2007
  • 하중저항계수설계법(LRFD)은 세계적으로 지반공학적 설계의 실무에서 사용이 증가하고 있으며 머지않아 현재의 허용응력설계법(ASD)을 완전히 대체할 것으로 예상된다. 하중저항계수설계법은 신뢰도해석(Reliability analysis)을 바탕으로 파괴확률을 정량화하여 상부구조물과 하부구조물을 일관된 신뢰도 수준으로 설계할 수 있게 하는 장점을 가지고 있다. 현재 암반에 근입된 현장타설말뚝의 저항계수는 단지 무결암 상태일 경우에 대하여 AASHTO에 의해 제시되어 있다. 그러나 국내의 경우, 말뚝이 근입되는 대부분의 기반암은 심하게 풍화되어 있다. 따라서 본 연구에서는 풍화암(흔히 IGM)에 대한 저항계수를 산정하고자 하였다. 이를 위해 국내 풍화암에 근입된 현장타설말뚝의 저항계수를 산정하기 위하여 신뢰도 해석을 수행하였다. 4개 현장에서 수행된 21본의 재하시험자료가 분석에 사용되었으며, 말뚝지지력을 계산하는 방법에 따라 저항계수는 $0.1{\sim}0.6$의 범위 내에서 산정되었다.

Shaft resistance of bored cast-in-place concrete piles in oil sand - Case study

  • Barr, L.;Wong, R.C.K.
    • Geomechanics and Engineering
    • /
    • 제5권2호
    • /
    • pp.119-142
    • /
    • 2013
  • Pile load tests using Osterberg cells (O-cell) were conducted on cast-in-place concrete piles founded in oil sand fill and in situ oil sand at an industrial plant site in Fort McMurray, Alberta, Canada. Interpreted pile test results show that very high pile shaft resistance (with the Bjerrum-Burland or Beta coefficient of 2.5-4.5) against oil sand could be mobilized at small relative displacements of 2-3% of shaft diameter. Finite element simulations based on linear elastic and elasto-plastic models for oil sand materials were used to analyze the pile load test measurements. Two constitutive models yield comparable top-down load versus pile head displacement curves, but very different behaviour in mobilization of pile shaft and end bearing resistances. The elasto-plastic model produces more consistent matching in both pile shaft and end bearing resistances whereas the linear elastic under- and over-predicts the shaft and end bearing resistances, respectively. The mobilization of high shaft resistance in oil sand under pile load is attributed to the very dense and interlocked structure of oil sand which results in high matrix stiffness, high friction angle, and high shear dilation.

현장타설말뚝형 에너지 파일의 시공형태별 지중 열교환량에 관한 연구 (The Effect of Construction Methods on Geothermal Exchange Rates of Cast-in-place Energy Piles)

  • 박용부;남유진;심영종;손정락
    • 토지주택연구
    • /
    • 제3권2호
    • /
    • pp.169-175
    • /
    • 2012
  • 최근, 지열 냉난방 시스템의 초기 공사비를 절감하기 위해 연구되고 있는 에너지 파일의 열교환량을 산정하기 위해 2종류(부속연결형, 슬링키형)의 현장타설말뚝형(PRD, 시공심도 4.5m, 직경 1,200mm) 에너지 파일을 시험시공하고 수치 시뮬레이션에 의해 효율을 상호 비교하였다. 상호 비교결과에 의하면 지중 교환량은 운전시작과 함께 채열에 의한 지중온도의 저하에 의해 점점 감소하였고 부속연결형의 평균 열원수의 온도차는 난방운전에서 $0.37^{\circ}C$, 냉방운전에서 $0.34^{\circ}C$로 나타났다. 또, 부속연결형의 난방운전시 열교환량 231.4W/m보다 냉방운전의 방열량은 252.2W/m로서 9% 높았고 슬링키형은 난방 기간 평균 열교환량이 168.0W/m로 부속연결형에 비해 약 27% 낮은 열교환량을 얻었다.

기초 연암부 벽면거칠기 시험과 하중전이 시험 결과의 비교 및 단위주면마찰력의 산정에 대한 연구 (A Comparison of Roughness Measurement and Load Transfer Test for the Calculation of Unit Skin Friction of Pile Foundation in Soft Rocks)

  • 홍석우;황근배
    • 한국지반공학회논문집
    • /
    • 제39권6호
    • /
    • pp.21-30
    • /
    • 2023
  • 현장타설말뚝의 연암 근입부의 단위주면마찰력을 산정하는 방법 중 암반 벽면거칠기에 의한 산정 방법이 있다. 현장타설말뚝의 굴착 시공 시 암반 굴착공에 거칠기 장치를 설치하고 벽면 거칠기 모양을 측정하고 그 결과를 이용하여 주면마찰력을 산정하는 것이다. 본 연구에서는 암반벽면의 거칠기를 직접 측정한 결과와 하중전이 시험결과를 비교분석하여 거칠기시험에 의한 단위주면마찰력을 말뚝의 발생 변위에 대응하는 단위 주면마찰력으로 변환할 수 있도록 저감계수 Rf = -0.14n + 1.48(여기서, n은 하중전이시험에서 도출된 발생변위 δ를 말뚝직경 D로 나눈 변위비)을 제안하였다.