• Title/Summary/Keyword: cast-in-place

Search Result 291, Processing Time 0.025 seconds

Mechanical Properties of Cement Material for Energy-Foundation (EF) Structures

  • Park, Yong-Boo;Choi, Hang-Seok;Sohn, Jeong-Rak;Sim, Young-Jong;Lee, Chul-Ho
    • Land and Housing Review
    • /
    • v.3 no.1
    • /
    • pp.83-88
    • /
    • 2012
  • In this study, physical characteristics of cement and/or concrete materials that are typically used for energy-foundation (EF) structures have been studied. The thermal conductivity and structural integrity of the cement-based materials were examined, which are commonly encountered in backfilling a vertical ground heat exchangers, cast-in-place concrete piles and concrete lining in tunnel. For this purpose the thermal conductivity and unconfined compression strength of cement-based materials with various curing conditions were experimentally estimated and compared. Hydration heat generated from massive concrete in the cast-in-place concrete energy pile was observed for 4 weeks to estimate its dissipation time in the underground. The hydration heat may mask the in-situ thermal response test (TRT) result performed in the cast-in-place concrete energy pile. It is concluded that at least two weeks are needed to dissipate the hydration heat in this case. In addition, a series of numerical analysis was performed to compare the effect of thermal property of the concrete material on the cast-in-place pile.

A Study on Development of a Ground-Source Heat Pump System Utilizing Cast-in-place Concrete Pile Foundation of a Building (현장타설형 건물 기초를 이용한 지중열 공조시스템의 성능평가에 관한 연구)

  • Hwang, Suck-Ho;Nam, Yu-Jin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.9
    • /
    • pp.641-647
    • /
    • 2010
  • Ground-source(Geothermal) heat pump(GSHP) systems can achieve a higher coefficient of performance than conventional air-source heat pump(ASHP) systems. However, GSHP systems are not widespread because of their expensive installation costs. The authors have developed a GSHP system that employs the cast-in-place concrete pile foundations of a building as heat exchangers in order to reduce the initial cost. In this system, eight U-tubes are arranged around the surface of a cast-in-place concrete pile foundation. The heat exchange capability of this system, subterranean temperature changes and heat pump performance were investigated in a full-scale experiment. As a result, the average values for heat rejection were 186~201 W/m(per pile, 25 W/m per pair of tubes) while cooling. The average COP of this system was 4.6 while cooling; rendering this system more effective in energy saving terms than the typical ASHP systems.

Performance Prediction of Geothermal Heat Pump(GHP) System Using Cast-in-Place Energy Piles (현장 타설 에너지파일을 적용한 지열 히트펌프 시스템의 성능 예측)

  • Sohn, Byonghu;Jung, Kyung-Sik;Choi, Hangseok
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.1
    • /
    • pp.28-36
    • /
    • 2013
  • The aim of this study is to evaluate the performance of the GHP system with 45 cast-in-place energy piles(CEP) for a commercial building. In order to demonstrate the feasibility of a sustainable performance of the system, transient simulations were conducted over 1-year and 20-year periods, respectively. The 1-year simulation results showed that the maximum and minimum temperatures of brine returning from the CEPs were $23.91^{\circ}C$ and $6.66^{\circ}C$, which were in a range of design target temperatures. In addition, after 20 years' operation, these returning temperatures decreased to $21.24^{\circ}C$ and $3.68^{\circ}C$, and finally reached to stable state. Annual average extraction heat of cast-in-place energy piles was 94.3 MWh and injection heat was 65.7 MWh from the 20 years of simulation results. Finally, it is expected this GHP system can operate with average heating SPF of more than 3.45 for long-term.

Electromagnetic Pulse Shielding Effectiveness and Construction Availability of Cast-In-Place Structures Using Corrugated Metal-Plates

  • Kim, Suk Bong;Yoon, Sangho;Min, Gyung Chan;Ahn, Sungjin;Park, Young Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.1
    • /
    • pp.84-89
    • /
    • 2013
  • This study aims to examine the effectiveness of electromagnetic pulse shielding in cast-in-place protective shelters using corrugated metal-plates, and then reviews their usability for the Republic of Korea Army. The Korea Corps of Engineering has evaluated corrugated metal-plates as a construction material for cast-in-place structures, which have to defend against mechanical impacts as well as electromagnetic pulses. Corrugated metal-plate is known as a superb mechanical protective material, so much so that it has been employed in ammunition magazines and artillery platforms in the armed forces. Moreover, as a metal, such as steel and copper, it is universally recognized as one of the most effective electromagnetic pulse shielding materials. In addition to effectively shielding from electromagnetic pulses and protecting against mechanical impacts, corrugated metal-plates should prove to be an appropriate construction material for the cast-in-place protective shelter in terms of construction availability and economic feasibility. The shielding effectiveness of the suggested structures is examined based on MIL-STD 188-125-1. A few frequency bands need an increase of 15~30dB in shielding effectiveness because of unbidden apertures caused by flaws associated with welding, assembling, and material deformation. However, allowing for the approximately 40dB of shielding provided by soil; the examined structure, which is buried underground, can offset its shortcomings sufficiently.

Field test of the long-term settlement for the post-grouted pile in the deep-thick soft soil

  • Zou, Jin-Feng;Yang, Tao;Deng, Dong-ping
    • Geomechanics and Engineering
    • /
    • v.19 no.2
    • /
    • pp.115-126
    • /
    • 2019
  • The long-term settlement characteristics for the cast-in-place bored pile in the deep-thick soft soil are investigated by post-grouting field tests. Six cast-in-place bored engineering piles and three cast-in-place bored test piles are installed to study the long-term settlement characteristics. Three post-grouting methods (i.e., post-tip-grouting, post-side-grouting, and tip and side post-grouting) are designed and carried out by field tests. Results of the local test show that decreased settlements for the post-side-grouted pile, the post-tip-grouted pile and the tip and side post-grouted pile are 22.2%~25.8%, 30.10%~35.98% and 32.40%~35.50%, respectively, compared with non-grouted piles. The side friction resistance for non-grouted piles, post-side-grouted pile, post-tip-grouted pile and the tip and side post-grouted pile undertakes 89.6~91.3%, 94.6%, 92.4%~93.0%, 95.7% of the total loading, respectively. At last, the parameters back analysis method and numerical calculation are adopted to predict the long-term settlement characteristics of the cast-in-place bored pile in the deep-thick soft soil. Determined Bulk modulus (K) and a creep parameter (Ks) are used for the back analysis of the long-term settlement of the post-grouted pile. The settlement difference between the back analysis and the measurement data is about 1.11%-7.41%. Long-term settlement of the post-grouted piles are predicted by the back analysis method, and the predicted results show that the settlement of the post-grouted pile are less than 6 mm and will be stable in 30 days.

An Experimental Study on In-Plane Shear Strength of the Interface between Half PC Plate and Cast-in-Place Concrete Plate (하프 PC판과 후타설콘크리트 접합면의 면내전단강도에 관한 실험적 연구)

  • 신동원;고만영;이동우;김용부
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10a
    • /
    • pp.513-518
    • /
    • 1998
  • In Half Precast Concrete Method, such as composite slab and composite wall, Interface between half PC plate and cast-in-place concrete is occurred. And this interface endure lastly in-plane shear which is occurred by external force. Therefore, test was executed to study in-plane shear strength of interface between half PC plate and cast-in-place concrete. In this test, Experimental parameters are finishing condition of the interface, cohesion of concrete, existence and nonexistence of re-bar truss, and angle and direction of lattice of re-bar truss. Comparing and analyzing experimental results, conclusions are obtained as follows. (1) In-plane shear strength of wide interface in composite plate is more affected by the roughness of interface than re-bar truss. And cohesion of concrete contribute to increasing in-plane shear strength. Therefore it seems that the interface should be roughen and kept clean to improve in-plane shear strength. (2) It seems that shear friction equation in ACI code can be sagely available for design of in-plane shear of composite plate.

  • PDF

Assessment of Risk Factors for Application of Exterior Insulation Board in Cast-in-place Concrete Form System for Apartment (공동주택용 외단열 동시타설 공법 적용을 위한 리스크 요인 평가)

  • Cui, Jun-Long;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.204-205
    • /
    • 2015
  • Exterior insulation board in cast-in-place concrete form system could reduce construction period and improve quality in apartment construction. However, the method is progressed with insulation and concrete frame works at the same time, then risk is increased in duration control and quality management. Therefore, this paper analyzed risk factors through FMEA method. We found that the key risk factors delaying schedule was insulation material that soaked in the rain and quality defects on the insulation material joint. Based on this research, the risk management approach should be developed for improvement of method activation.

  • PDF

Seismic Behavior of Non Ductile Reinforced Concrete Frame Retrofitted With Cast-In Place Infilled Shear Wall (현장타설 끼움 벽으로 보강된 비내진 상세를 갖는 철근콘크리트 골조의 내진거동)

  • Lee, Hye-Yeon;Kim, Sun-Woo;Han, Byung-Chan;Yun, Hyun-Do;Choi, Chang-Sik
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.453-456
    • /
    • 2004
  • RC frames built prior to the advent of the philosophy of ductile concrete is one type of existing construction susceptible to damage. Strengthening and stiffening of such frames has been accomplished by infilled frames with cast-in-place, reinforced concrete walls. Placement of CIP shear walls within strategic bays of a structure appears to be a logical and economical method to strengthen a reinforced concrete frame and to stiffen a building in order to reduce architectural and mechanical damage. This study investigates the seismic performance of cast-in place infilled shear wall within existing frames. The object of this study is to clarify the seismic capacity and characteristics in the hysteretic behavior of bare frame, CIP infilled shear wall and CIP infilled wall reinforced diagonal bars.

  • PDF

Fracture behavior of Cast-in-place Headed Anchors to Concrete (콘크리트 CIP 앵커시스템의 파괴 거동에 관한 연구)

  • Park, Sung-Gyun;Kim, Ho-Seop;Yoon, Young-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.141-152
    • /
    • 2001
  • This paper presents the evaluation of behavior and the prediction of tensile capacity of anchors that can cause a failure of the concrete on the basis of the design for anchorage. Tests of cast-in-place headed anchors, domestically manufactured and installed in uncracked and unreinforced concrete member are conducted to test the effected of embedment length and edge distance. The failure modes and the load-deformation responses of the anchors are discussed and then the concrete failure data are compared with capacities by the two present methods : the 45 degree cone method of ACI 349, 318 and the concrete capacity design (COD) method. Differences between the results by test and by two prediction methods are analyzed Finite Element Method (FEM).

  • PDF

Pull-out Capacity of Cast-in-place Anchor for Construction of Precast Concrete Segment Arch (프리캐스트 콘크리트 패널 분절 아치 시공을 위한 선설치 앵커의 인발 강도 평가)

  • Ahn, Jin-Hee;Yim, Hong Jae;Bang, Jin Soo;Jeon, Seok Hyeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.2
    • /
    • pp.94-102
    • /
    • 2020
  • Precast concrete segment arch system has an economic and construct ability that combined with advantage of precast concrete and arch behavior. A precast concrete segment arch system with outrigger is consisted of segmented precast panels, a steel outrigger rib, and V-strip to connect precast panels with a steel outrigger rib and cast-in-place anchors in precast panels to connect V-strip should have sufficient pull-out capacity to form its arch shape by site lifting for assembled precast panels and outriggers. However, it is difficult to secure its embedment depth due to the relatively shallow thickness of precast panel. It can be also occurred that flexure deformation of precast panels caused by its pull-out behaviors. In this study, pull-out capacity of cast-in-place anchor was examined for construction of precast concrete segment arch system with outriggers. Therefore, a total of 24 precast panel specimens were fabricated to examine pull-out capacities of cast-in-place anchor in precast panels, and installation depth of anchors, diameter of anchors and wire mesh effects for the precast panel were examined. From this pull-out tests, its pull-out capacities and failure modes were evaluated and the type of the cast-in-place anchor applicable to the precast concrete segment panel arch system with outriggers was determined from comparison of the design specification values.