The aim of this study is to establish an efficient distribution planning for a capacitated multi-stage supply chain. We assume that the demand information during planning horizon is given a deterministic form using a certain forecasting method. Under such a condition, we present a cost effective heuristic method for minimizing chain-wide supply chain inventory cost that is the sum of holding and backorder costs by using look-ahead technique. We cope with the capacity restriction constraints through look-ahead technique that considers not only the current demand information but also future demand information. To evaluate performance of the proposed heuristic method, we compared it with the extant research that utilizes echelon stock concept, under various supply chain settings.
Journal of the Korean Operations Research and Management Science Society
/
v.31
no.2
/
pp.99-112
/
2006
In our model, we keep inventory to satisfy uncertain demands which arrives irregularly. In this situation, we have additional two constraints. First, we need to have certain amount of order consolidation (consolidation constraint) for the orders to replenish the inventory because of production or purchase amount constraint. And also, if we order at a certain date which was set by administrative convenience, we have capacity constraint to order the consolidated order demands (capacity constraint). We show this variant inventory policy is needed in steel industry and note that there will be possible similar case in industry. To deal with this case, we invent a variant replenishment policy and show this policy is superior to other possible polices in the consolidation constraint case by extensive simulation. And we derive a combined solution method for dealing with the capacity constraints in addition to the consolidation constraints. For this, we suggest a combined solution method of integer programming and simulation.
Nowadays, most companies seek after the greatest profit by means of offering the goods which consumers want timely and efficiently and minimizing the cost of inventory and distribution channel which amounts to the great portion of total cost. And according as EC(Electronic Commerce) market has increased rapidly, SCM(Supply Chain Management) for EC become one of the most important facts for companies, therefore this paper suggest SCM scheme which EC, especially B to C, is added to the existing commerce system. This paper uses internet for information integration of distribution channel which is away from one another and applies TOC(Theory of Constraint)'s DBR(Drum-Buffer-Rope) Scheduling for synchronization through the whole supply chain. It is possible to synchronize the whole supply chain by means of making the speed of manufacturing and distribution to be controlled by consumer's order which is received in distribution center, and inventory and loss of sales opportunities are minimized by constant. Buffer Management. If inventories in distribution center is short, then it needs to search CCR(Capacity Constraint Resource) in supply chain and to control the speed of manufacturing and distribution according to the ability of CCR. This paper applies PT(Partial Transshipment) strategy for Delivery from distribution center to store or cyber consumer. the strategy this paper suggests chooses neighbour area from area which each distribution center takes charge, and then makes product ordered by cyber consumer which lives in the chosen area to be delivered according to inventory of distribution center.
Proceedings of the Society of Korea Industrial and System Engineering Conference
/
2002.05a
/
pp.203-208
/
2002
In case of the problems with multiple plants, alternative operation sequence, alternative machine, setup time, and transportation time between plants, we need a robust methodology for the integration of process planning and scheduling in supply chain. The objective of this model is to minimize the tardiness and to maximize the resource utilization. So, we propose a multi-objective model with limited-capacity constraint. To solve this model, we develope an efficient and flexible model using adaptive genetic algorithm(AGA), compared to traditional genetic algorithm(TGA)
Proceedings of the Korean Operations and Management Science Society Conference
/
2005.10a
/
pp.10-26
/
2005
In our model, we keep inventory to satisfy uncertain demands which arrives irregularly. In this situation, we have additional two constraints. First, we need to have certain amount of order consolidation (consolidation constraint) for the orders to replenish the inventory because of production or purchase constraint. And also, if we order at a certain date which was set by administrative convenience, we have amount constraint to order the consolidated order demands (capacity constraint). We showed this variant inventory policy is needed in steel industry and note that there will be possible similar case in industry. To deal with this case, we invented a variant replenishment policy and show this policy is superior to other possible polices in the consolidation constraint case by extensive simulation. And we derive a combined solution method for dealing with the capacity constraints in addition to the consolidation constraints. For this, we suggest a combined solution method of integer programming and simulation.
Proceedings of the Korean Operations and Management Science Society Conference
/
2000.04a
/
pp.754-757
/
2000
인터넷을 이용한 사이버 거래가 빠른 속도로 증가함으로써 기업에게 있어 인터넷 쇼핑몰 구축은 더 이상 선택사항이 아닌 필수 사항이 되었다. 하지만 현재 사이버 거래 수준은 전통적 상거래 수준에 못 미칠뿐더러 거래 항목에 있어서도 매우 제한적인 것이 사실이다. 앞으로 사이버 거래는 계속적으로 증가하리라 전망되지만 제품의 특성 혹은 고객의 기호에 따라 전통적 상거래도 그 영역을 차지하며 함께 양립하여 발전할 것이다. 이에 본 연구에서는 기존의 상거래 시스템에 사이버 거래기능을 추가하는 모델을 제시한다. 먼저 지리적으로 멀리 떨어져 있는 유통망의 정보화를 위하여 인터넷 기술을 이용하고 공급체인(Supply Chain) 전체에 걸친 동기화를 위해 TOC(Theory of Constraint)의 DBR(Drum-Buffer-Rope) 스케줄링을 응용한다. 모든 생산 및 유통의 흐름 속도가 최종 분배 센타에 접수되는 고객의 요구에 따라 이루어지게 함으로써 공급체인 전체에 걸친 동기화를 이룰 수 있고 지속적인 버퍼 관리를 통하여서 재고의 절감은 물론 미출고의 발생도 최소화할 수 있다. 만약 분배 센타에 재고부족 현상이 일어날 경우에는 공급체인 상의 능력제약자원(Capacity Constraint Resource . CCR)을 찾아 개선 활동을 수행하며 공급체인의 흐름 속도를 능력제약자원에 맞추어 조절한다. 분배 센타에서 대리점 혹은 사이버 고객으로의 배송은 부분적 분할납품 Partial Transshipment : PT) 전략을 적용한다. 즉 각 분배 센타가 관리하는 수요지 중 인접한 지역을 부분적 분할납품 전략 적용 수요지로 선택하고 사이버 거래를 통해 생성된 물류가 부분적 분할납품 전략 적용 수요지에 분배되게 함으로써 각 분배 센타의 재고 완충역할을 수행하게 한다. 이에 따라 안전 재고 및 역 배송을 최소화 할 수 있을 뿐 아니라 미 출고로 인한 손실을 최소화하며 고객의 서비스를 일정하게 유지시킬 수 있을 것으로 기대된다.
Journal of Korean Society of Industrial and Systems Engineering
/
v.31
no.4
/
pp.134-139
/
2008
Most approaches for continuous review inventory problem need tables for loss function and cumulative standard normal distribution. Furthermore, it is time-consuming to calculate order quantity (Q) and reorder point (r) iteratively until required values are converged. The purpose of this paper is to develop a direct method to get the solution without any tables. We used approximation approaches for loss function and cumulative standard normal distribution. The proposed method can get the solution directly without any iterative procedure for Q, r and without any tables. The performance of the proposed approach is tested by using numerical examples. The budget constraint of this paper assumes that purchasing costs are paid at the time an order is arrived. This constraint can be easily replaced by capacity constraint or budget constraint in which' purchasing costs are paid at the time an order is placed.
Journal of Korean Society of Industrial and Systems Engineering
/
v.35
no.4
/
pp.126-132
/
2012
This paper deals with a centralized warehouse problem with multi-item and capacity constraint. The objective of this paper is to decide the number and location of centralized warehouses and determineorder quantity (Q), reorder point (r) of each centralized warehouse to minimize holding, setup, penalty, and transportation costs. Each centralized warehouse uses continuous review inventory policy and its budget is limited. A SA (Simulated Annealing) approach is developed and its performance is tested by using some computational experiments.
Proceedings of the Safety Management and Science Conference
/
2000.11a
/
pp.163-163
/
2000
오늘날 기업환경은 고객의 요구에 대응하여 적시에 효율적으로 상품과 서비스를 공급하고 전체비용의 대부분을 차지하는 물류와 재고비용을 줄여 기업의 이윤을 극대화하는 것으로 변화하고 있다. 예전에 기업위주의 시장형성에서 고객위주로 시장이 변화하고 있는 것이다. 이에 따라 기업은 고객의 요구에 능동적으로 대응하기 위하여 리드타임의 단축이 필수적인 요소가 되어가고 있다. 이러한 기업환경에 변화에 따른 대안으로 나온 것이 실시간 제조와 공급사슬망관리(Supply Chain Management : SCM)이다. 본 연구는 실시간 제조를 지원하기 위하여 제조업체와 협력사간의 물류에 있어 Goldratt의 Drunm-Buffer-Rope 스케줄링을 이용하여 물류창고라는 Buffer를 두어 협력사중 재고의 부족현상이 일어날 경우에는 공급체인상의 능력제약자원(Capacity Constraint Resource: CCR)을 찾아 능력제약자원이 되는 협력사에 대하여 생산을 독촉하고 물류창고에서는 부족재고에 대한 불출을 개시하여 재고의 완충을 도모하고자 한다. 제조업체와 협력사간의 정보를 실시간 감시시스템(Real-Time Monitoring System : RTMS)를 응용하여 웹상에서 공유하며, 실시간 거래가 가능토록하는 공급사슬망 구축에 관한 연구와 이를 프로그램 구현을 통해 실제적으로 시험해 보고자 한다.
Journal of Institute of Control, Robotics and Systems
/
v.7
no.10
/
pp.867-873
/
2001
The purpose of this study is to find analytic solution of determining the optimal capacity (lot-size) of multiproduct acyclic multistage production and inventory system to meet the finished product demand under the constraint of finite intermediate storage. Intermediate storage is a practical way to mitigate the material flow imbalance through the line of supply and demand chain. However, the cost of constructing and operating storage facilities is becoming substantial because of increasing land value, environmental and safety concern. Therefore, reasonable decision-making about the capacity of processes and storage units is an important subject for industries. The industrial solution for this subject is to use the classical economic lot sizing method, EOQ/EPQ(Economic Order Quantity/Economic Production Quantity) model, incorporated with practical experience. But EOQ/EPQ model is not suitable for the chemical plant design with highly interlinked processes and storage units because it is developed based on single product and single stage. This study overcomes the limitation of the classical lot sizing method. The superstructure of the plant consists of the network of serially and/or parallelly interlinked non-continuous processes and storage units. The processes transform a set of feedstock materials into another set of products with constant conversion factors. A novel production and inventory analysis method, PSW(Periodic Square Wave) model, is applied to describe the detail material flows among equipments. The objective function of this study is minimizing the total cost composed of setup and inventory holding cost. The advantage of PSW model comes from the fact that the model provides a set of simple analytic solutions in spite of realistic description of the material flows between processes and storage units. the resulting simple analytic solution can greatly enhance the proper and quick investment decision for the preliminary plant design problem confronted with economic situation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.