• 제목/요약/키워드: cable tunnel

검색결과 200건 처리시간 0.026초

싱가포르 케이블터널 프로젝트 NS2현장 SCL 터널에서의 숏크리트 라이닝의 변형거동 특성 (Numerical Analysis for Shotcrete Lining at SCL Tunnel in NS2 Transmission Cable Tunnel Project in Singapore)

  • ;김영근
    • 터널과지하공간
    • /
    • 제27권4호
    • /
    • pp.185-194
    • /
    • 2017
  • 본 논문은 싱가포르 케이블 터널NS2 현장 SCL(NATM)터널구간에서 숏크리트 라이닝의 역학적 변형거동을 평가하기 위하여, 터널 막장관찰(Face Mapping)자료에 근거한 암반분류결과와 현장계측을 통한 내공변위결과를 바탕으로 NATM 터널의 공학적 거동 특성을 분석하고자 하였다. 또한 본 현장의 수직구, Adit 터널 및 Enlargement 터널의 NATM 터널 전체를 3차원 모델링하였으며, 시공중 암반분류값에 근거한 암반하중을 산정하여 3차원 유한요소해석을 실시하였으며, 해석결과를 현장계측결과와 비교 검토하였다.

Galloping analysis of stranded electricity conductors in skew winds

  • Macdonald, J.H.G.;Griffiths, P.J.;Curry, B.P.
    • Wind and Structures
    • /
    • 제11권4호
    • /
    • pp.303-321
    • /
    • 2008
  • When first commissioned, the 1.6 km span 275kV Severn Crossing Conductor experienced large amplitude vibrations in certain wind conditions, but without ice or rain, leading to flashover between the conductor phases. Wind tunnel tests undertaken at the time identified a major factor was the lift generated in the critical Reynolds number range in skew winds. Despite this insight, and although a practical solution was found by wrapping the cable to change the aerodynamic profile, there remained some uncertainty as to the detailed excitation mechanism. Recent work to address the problem of dry inclined cable galloping on cable-stayed bridges has led to a generalised quasi-steady galloping formulation, including effects of the 3D geometry and changes in the static force coefficients in the critical Reynolds number range. This generalised formulation has been applied to the case of the Severn Crossing Conductor, using data of the static drag and lift coefficients on a section of the stranded cable, from the original wind tunnel tests. Time history analysis has then been used to calculate the amplitudes of steady state vibrations for comparison with the full scale observations. Good agreement has been obtained between the analysis and the site observations, giving increased confidence in the applicability of the generalised galloping formulation and providing insight into the mechanism of galloping of yawed and stranded cables. Application to other cable geometries is also discussed.

현장 조립 시험시공을 통한 쉴드터널 강연선 체결 기술의 적용성 평가 (Applicability estimation for cable assembling method of shield tunnel using field test construction)

  • 김동민;마상준;이영섭
    • 한국터널지하공간학회 논문집
    • /
    • 제17권1호
    • /
    • pp.11-23
    • /
    • 2015
  • 본 연구에서는 쉴드터널의 볼트 체결 방식의 문제점을 개선하기 위해 강연선 긴장력을 이용한 새로운 세그먼트 체결 기술을 개발하였다. 현장 조립 시험시공을 통해 세그먼트 전단키가 세그먼트 틸팅 공정에서 가이드 역할을 하여 볼트 체결 방식보다 조립 시간이 더 단축되는 것을 확인하였다. 그리고 세그먼트 조립 공정의 소요공기 측정결과 볼트 체결 방식은 1개의 세그먼트 공급에서 체결까지 420초가 소요되었고, 강연선 체결 방식은 400초가 소요되었는데, 강연선 자동화 장치를 이용할 경우 기존 볼트 체결 방식에 비해 60초의 소요공기 감소효과가 있는 것으로 나타났다. 또한, BIM을 활용한 쉴드TBM 연동 강연선 자동화 시스템 모델링은 쉴드TBM 설계, 굴진 계획, 공법 프로세스 파악, 시공 관리 등에서 효과적으로 활용될 수 있을 것으로 판단된다.

Galloping of steepled main cables in long-span suspension bridges during construction

  • An, Yonghui;Wang, Chaoqun;Li, Shengli;Wang, Dongwei
    • Wind and Structures
    • /
    • 제23권6호
    • /
    • pp.595-613
    • /
    • 2016
  • Large amplitude oscillation of steepled main cables usually presents during construction of a long-span bridge. To study this phenomenon, six typical main cables with different cross sections during construction are investigated. Two main foci have been conducted. Firstly, aerodynamic coefficients of a main cable are obtained and compared through simulation and wind tunnel test: (1) to ensure the simulation accuracy, influences of the numerical model's grid size, and the jaggy edges of main cable's cross section on main cable's aerodynamic coefficients are investigated; (2) aerodynamic coefficients of main cables at different wind attack angles are obtained based on the wind tunnel test in which the experimental model is made by rigid plastic using the 3D Printing Technology; (3) then numerical results are compared with wind tunnel test results, and they are in good agreement. Secondly, aerodynamic coefficients of the six main cables at different wind attack angles are obtained through numerical simulation. Then Den Hartog criterion is used to analyze the transverse galloping of main cables during construction. Results show all the six main cables may undergo galloping, which may be an important reason for the large amplitude oscillation of steepled main cables during construction. The flow structures around the main cables indicate that the characteristic of the airflow trajectory over a steepled main cable may play an important role in the galloping generation. Engineers should take some effective measures to control this harmful phenomenon due to the big possibility of the onset of galloping during the construction period.

전력구트라프내간접수냉방식에서의 송전용량 변화에 관한 연구 (A Study on the Variation of the Transmission Capacity by External water Cooled System with Trough in Tunnel)

  • 박만흥;조규식;김재근;서정윤
    • 대한전기학회논문지
    • /
    • 제41권5호
    • /
    • pp.445-458
    • /
    • 1992
  • As one of the forced cooling method of the underground power transmission system, external water cooled system with trough in tunnel was investigated. This study is performed on thermal analysis for a standard condition to determine the cable transmission current of the underground power transmission system about the cooling facility. A parametric study was performed for the inlet water temperatures, flow rates, the inlet air velocities, flow rates and the cooling spans. This study shows that the cable transmission current varies within the allowable limitation in compliance with the variation of inlet water temperatures and flow rates. It exhibits little variations for the most intervals in compliance with the variation of inlet air temperatures and flows. But, the cable transmission current fast reduces for a specified interval and consequently affects the underground transmission system. As a result, when the actual forced cooling system is designed, the design conditions of inlet air have to be considered as the most important parameters in determination of the cable transmission current.

단층파쇄대 규모 및 조우 조건에 따른 전력구 쉴드 TBM 터널의 거동 특성 분석 (The study on the effect of fracture zone and its orientation on the behavior of shield TBM cable tunnel)

  • 조원섭;송기일;김경열
    • 한국터널지하공간학회 논문집
    • /
    • 제16권4호
    • /
    • pp.403-415
    • /
    • 2014
  • 최근, 기후변화에 따른 하절기 기온 상승으로 인하여 전력사용량이 급증하고 있다. 이에 따라 발전시설이 새로 준공되고 있으며, 생산된 전기를 도심지로 송전할 초고압 송전선로 시설의 필요성이 증가하고 있다. 쉴드 TBM을 이용한 기계화 터널 굴착공법은 기존의 재래식 공법에 비해 지반 침하와 지반에 전달되는 진동을 최소화 할 수 있는 장점이 있다. 도심지에서의 전력구터널 굴착을 위한 쉴드 TBM 공법이 증가함에도 불구하고, 전력구 쉴드 TBM 터널의 거동 분석에 관한 연구는 미비한 실정이다. 본 연구에서는 파쇄대를 포함하는 복합지반에서 파쇄대 너비, 각도에 따른 전력구 쉴드 TBM 터널의 거동 특성을 분석하고, 인터페이스 요소를 적용한 파쇄대와 연속체로 모델링한 파쇄대의 거동 특성을 비교하고자 한다. 쉴드 TBM을 이용한 터널 굴착은 3D FEM을 이용하여 시뮬레이션 하였다. 파쇄대의 방향과 크기의 변화에 따라 세그먼트 라이닝에 작용되는 축력, 전단력, 휨 모멘트를 검토하고 지표면에서의 연직변위를 분석하였다. FEM 해석으로 얻어진 결과와 안정성 분석에 기초하여, 전방의 파쇄대를 예측하여 터널 구조물의 안정성을 확보할 수 있다.

화재피해 통신구의 안전진단 (A Safety Evaluation of Cable Tunnel Exposed to Fire)

  • 김지상;김형우;김효환
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1994년도 봄 학술발표회 논문집
    • /
    • pp.221-226
    • /
    • 1994
  • A safety evaluation of cable tunnel, which is a concrete box structure with telecommunication facilities in it, exposed to fire is given. The immediate field observation was performed to find out any sign of sudden structural failure. In some region, where the fire intensity was heavy, the spalling of concrete cover in upper slab occurred. Next, more careful investigation was done with proper non-desturctive testing methods and structural analysis taking into account the changes in material properties due to fire. It seems that there is no severe damage on concrete, reinforcements and over all structural system.

  • PDF

통신구 터널발파작업으로 인한 진동.소음이 지상주택에 미치는 영향 평가 (On the influence survey to building by the cable Tunnel blasting works.)

  • 허진;김상백
    • 화약ㆍ발파
    • /
    • 제11권1호
    • /
    • pp.5-33
    • /
    • 1993
  • On the cable Tunnel works. Cautious blasting works were so effective and carried out. The vibration record were under 0.4cm / sec and blasting noise are under 75dB Which it was measured at the ground of Tailor House. As a result cautious blasting works under above allowable value, are not Influenced the structure of house and living. On the architechtural survey, there were some hair crack on the wall but this was not crack from recently blasting work.

  • PDF