• Title/Summary/Keyword: cable fire

Search Result 140, Processing Time 0.027 seconds

A Study on Fire Risk Assessment of a EPS room using Fire Simulation (시뮬레이션 분석을 통한 EPS실 화재위험성 평가에 관한 연구)

  • Ham, Eungu;Kim, Dongcheol;Lee, Changwoo
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.4
    • /
    • pp.581-588
    • /
    • 2015
  • This study was conducted by utilizing simulation (FDS6) the fire characteristics of the flammable substances such as cable compartment of a small space in the EPS room type. In the partitioned space of a room EPS supply of oxygen does not facilitate the combustion of the upward-sloping curve, as in a standard fire curve is not observed. Simulation results in a situation where ventilation is limited to the heat release rate and smoke emission characteristics of the fire showed a complex and unstable form a repeating rise and fall. Fire time was longer than the fire load. Change in the smoke emission than the heat release rate is slow, but changes of the overall surface was found to exhibit affinity.

A Study on the Possibility of Electrical Fires due to the Short Circuit and Ground Fault of Power Cable Supported by an Iron Fence (철제펜스로 지지된 동력배선의 단락.지락에 의한 전기화재 발생 개연성 연구)

  • Kim, Jeong-Hun;Park, Byoung-Ki;Song, Jong-Hyeok;Jung, Ki-Chang
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.6
    • /
    • pp.41-45
    • /
    • 2007
  • Short circuit and ground fault account for the primary causes of electrical fires. In this research, real-scale experiments were conducted to assess the possibility of electrical fires due to these causes. The experiment conditions were identical with an actual fire accident, in which the power cable was supported by an iron fence. The purposes of this research are to investigate the short circuit caused by wire cutting, the conductivity of the iron fence depending on its coating conditions, and the ground fault of one wire or two wires in an effort to reconstruct the fire accident. The test results show that, owing to the instant operation of circuit breaker in the moment of short circuit or ground fault, the generated ignition energy is far less than necessary to start an ignition. Therefore it is concluded that electrical fire is highly unlikely if the electric system is protected by a circuit breaker with normal functions.

Comparison between a Light-Scattering and a Light-Extinction Methods for the Study on Soot Yielding Characteristics of an Electric Cable Fire (전선 매연 생성 특성 연구를 위한 광산란법-광소멸법의 비교)

  • Cho, Sang-Moon;Lee, Min-Jung;Kim, Nam-Il
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.6
    • /
    • pp.38-43
    • /
    • 2008
  • Significant portion of the fire accident is caused by some troubles in electric circuits. To prevent the fire induced by those electric trouble, some indications of electric fire need to be suitably detected at the first stage of the fire development. With this background, the characteristics of soot yielding of electric cables have been investigated using a light extinction method. In this study, a light scattering method was compared with the light extinction method. A slot-type premixed-flame combustor was traversed to bum three types of electric cables by compulsion, then the mass decrease rate and the soot densities were measured. According to the experimental results, the light scattering method is preferred to the light extinction method when the soot yield ratio is relatively small. Thus the former method is more suitable to detect the occurrence of an electric fire in a power distributer box.

Structural behavior of cable-stayed bridges after cable failure

  • Kim, Seungjun;Kang, Young Jong
    • Structural Engineering and Mechanics
    • /
    • v.59 no.6
    • /
    • pp.1095-1120
    • /
    • 2016
  • This paper investigates the change of structural characteristics of steel cable-stayed bridges after cable failure. Cables, considered as the intermediate supports of cable-stayed bridges, can break or fail for several reasons, such as fire, direct vehicle clash accident, extreme weather conditions, and fatigue of cable or anchorage. Also, the replacement of cables can cause temporary disconnection. Because of the structural characteristics with various geometric nonlinearities of cable-stayed bridges, cable failure may cause significant change to the structural state and ultimate behavior. Until now, the characteristics of structural behavior after cable failure have rarely been studied. In this study, rational cable failure analysis is suggested to trace the new equilibrium with structural configuration after the cable failure. Also, the sequence of ultimate analysis for the structure that suffers cable failure is suggested, to study the change of ultimate behavior and load carrying capacity under specific live load conditions. Using these analysis methods, the statical behavior after individual cable failure is studied based on the change of structural configuration, and distribution of internal forces. Also, the change of the ultimate behavior and load carrying capacity under specific live load conditions is investigated, using the proposed analysis method. According to the study, significant change of the statical behavior and ultimate capacity occurs although just one cable fails.

An Application of the Water Mist System for Underground Utility Tunnel (지하구 미분무수 소화설비 적용에 관한 연구)

  • 김운형;김종훈;박승민;김태수;민인홍;전동일;김상욱
    • Fire Science and Engineering
    • /
    • v.16 no.1
    • /
    • pp.66-76
    • /
    • 2002
  • This paper includes new nozzle design, basic design factors of water mist system that minimize a thermal damage of cable causing business interruption and applying underground utility tunnel. A underground concrete structure (2.5 m(H)$\times$2.5 m(W)$\times$25 m(D)) is constructed in order to test a nozzle performance. Under the designing fire scenario, critical thermal damage of cable sheath ($400^{\circ}c$) reached within a 2 minutes with unsuppressed fire, but type 1 nozzle (SMD 470 $\mu{m}$) and type 2 nozzle (SMD 650 $\mu{m}$) control cable temperature below $400^{\circ}c$. A system performance and fundamental design factors; K factor, flow rate, spray angle, size distribution, nozzle pressure, spray density are analyzed and proposed for system optimization.

Fusing Time Characteristics Analysis of Cable according to Temperature and Insulator (온도 및 절연체에 따른 케이블의 단선시간 특성 해석)

  • Kim, Ju-Hee;Kang, Sin-Dong;Kim, Jae-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.15-20
    • /
    • 2018
  • This paper describes the fusing time characteristics of Light PVC Sheathed Circular Cord(VCTF) and Tray Frame Retardant(TFR) cables according to increased temperature under over current condition. The experimental equation will be used to determine the validity and reliability of the test results. The over current flowed 3, 5 and 10 times higher than the amount of allowable current using DC power supply with DAQ(Data Acquisition) measurement system. An infrared radiation heater, which was controlled by a variable AC auto transformer, was used to increase the temperature from room temperature to 50, 100 and 150 degrees Celsius. First, two type of cables were analyzed those with different cross-sectional areas with in the same structure and those with different structures with in the same cross-sectional areas. Then, it was determined how fusing time had been influenced according to the cross-sectional areas and different structures, respectively. The cable resistance was increased by joule heating according to increasing temperature. Therefore, the allowable current of cable is decreased. Finally, the fusing time of the cable was decreased due to increased temperatures at current flow, which were 3 times the amount of allowable current. The instantaneous breakdown was observed when current flow was 5 and 10 times over the amount of allowable current. The fusing time is directly affected by the structure of cable insulation.