• Title/Summary/Keyword: building fire safety

Search Result 644, Processing Time 0.027 seconds

A Study on the Evacuation of People used the evacuation model on Fire in Shopping Mall (피난 모델을 이용한 대형할인매장의 화재시 피난에 관한 연구)

  • 이수경;이상준
    • Fire Science and Engineering
    • /
    • v.14 no.4
    • /
    • pp.17-22
    • /
    • 2000
  • For life safety design of shopping mall, we selected a shopping mall, and calculated the evacuation time of means of egress. It is calculated by two kind of evacuation method. One is the computer simulation model, EXODUS. The other is Japan's method. Study way is a model structure study, selecting real shopping mall and setting scenario, calculating the evacuating time. result of study, evaluation time is very high. Therefore we confirmed that the building of means of egress is not fit to evacuation more the capacity of setting population.

  • PDF

A Study on Appropriateness of Performance Criteria of Smoke Control System for Underground Spaces (I) (지하공간에 대한 제연설비 성능기준의 적정성 고찰(I))

  • Ahn, Chan-Sol;Kim, Heung-Youl;Yoo, Yong-Ho;Jeon, Gyu-Yeop
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.103-106
    • /
    • 2008
  • This study is intended to evaluate the characteristics of smoke spreading and the appropriateness of evacuation time extended by operation of smoke control system during fire within the underground space of the building structured in compliance with the smoke control system performance criteria from the local fire safety standard, which has been currently applied to the buildings in Korea. Using the heat release per unit weight of the combustibles, a numerical analysis both in case of smoke control system in operation and the system not in operation was carried out at the several different shopping malls. From the viewpoint of securing the evacuation time, the results were compared in an attempt to assess the appropriateness of the fire safety criteria.

  • PDF

Fire Safety Current Status Investigation of Office Building for Urban Safety Estimaiton (도시 안전 평가를 위한 오피스 빌딩의 화재 안전 현황조사)

  • Chae, Han-Sik;Yoo, Yong-Ho;Kim, Hyeung-Youl;Choi, Young-Wha;Yoon, Myong-O
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.500-505
    • /
    • 2009
  • 도시에 대한 근대적 의미의 도시화는 1960년대부터 본격적으로 시작되었지만 세계 수준과 비교하였을 때 평균수준에도 미치지 못하였다. 이후 급격한 도시의 인구 증가율로 인해 높은 도시화 비율을 나타내었지만 인구 대이동으로 인하여 이농향도 현상이 발생하였다. 또한 도시의 고도화 복잡화 되면서 교통난과 환경문제가 발생하였으며 화재 사고등이 빈번히 발생함으로써 엄청난 피해 규모가 나타났다. 따라서 본 연구에서는 도시의 안전 평가를 위하여 도심지의 건축물을 대상으로 오피스 빌딩을 선정하여 화재 안전 현황에 대하여 조사 분석하였다.

  • PDF

Collapse Initiation and Mechanisms for a Generic Multi-storey Steel Frame Subjected to Uniform and Travelling Fires

  • Rackauskaite, Egle;Kotsovinos, Panagiotis;Lange, David;Rein, Guillermo
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.4
    • /
    • pp.265-283
    • /
    • 2021
  • To ensure that fire induced collapse of a building is prevented it is important to understand the sequence of events that can lead to this event. In this paper, the initiation of collapse mechanisms of generic a multi-storey steel frame subjected to vertical and horizontal travelling fires are analysed computationally by tracking the formation of plastic hinges in the frame and generation of fire induced loads. Both uniform and travelling fires are considered. In total 58 different cases are analysed using finite element software LS-DYNA. For the frame examined with a simple and generic structural arrangement and higher applied fire protection to the columns, the results indicate that collapse mechanisms for singe floor and multiple floor fires can be each split into two main groups. For single floor fires (taking place in the upper floors of the frame (Group S1)), collapse is initiated by the pull-in of external columns when heated beams in end bays go into catenary action. For single floor fires occurring on the lower floors(Group S2), failure is initiated (i.e. ultimate strain of the material is exceeded) after the local beam collapse. Failure in both groups for single floor fires is governed by the generation of high loads due to restrained thermal expansion and the loss of material strength. For multiple floor fires with a low number of fire floors (1 to 3) - Group M1, failure is dominated by the loss of material strength and collapse is mainly initiated by the pull-in of external columns. For the cases with a larger number of fire floors (5 to 10) - Group M2, failure is dominated by thermal expansion and collapse is mainly initiated by swaying of the frame to the side of fire origin. The results show that for the investigated frame initiation of collapse mechanisms are affected by the fire type, the number of fire floors, and the location of the fire floor. The findings of this study could be of use to designers of buildings when developing fire protection strategies for steel framed buildings where the potential for a multifloor fire exists.

A Study on Improvement of Connection Method of Underground Parking Lot SP Equipment Water Supply Pipe for Effective Fire Activities (효과적인 소방활동을 위한 지하주차장 스프링클러설비 송수배관 연결방식의 개선에 관한 연구)

  • Son, Gae-Seong;Choi, Ji-Hun;Choi, Don-Mook
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.161-169
    • /
    • 2015
  • A fire sprinkler system is very important to extinguish fire in the building. The sprinkler system initiates sprinkler discharge if the detection system identifies a developing fire and opens the pre-action valve. However, pre-action fire sprinkler systems mainly installed in the underground parking lot at the apartment complex do not properly operate at fire if the connection type of fire sprinkler systems does not properly installed and operated. This study identified the relationship between fire dispersion & damage and the connection type of water supply in the sprinkler system from many fire cases at the apartment complex in South Korea. In addition, this study also identified the water supply differences and characteristics between South Korea and foreign countries. The main purpose of this study is also to improve the water connection types in the sprinkler system that can reduce the potential failures of pre-action valve operation through electrical signal system. The study also suggests the improvement plan for water connection types in pre-action fire sprinkler system that can minimize potential failure of pre-action fire sprinkler system. The suggestions for revising the fire safe standard in South Korea includes letting the water supply pipe of sprinkler system water inlet connect to the second side of pre-action valve and the water flow device that can minimize potential failure of sprinkler system.

Design and Fabrication of a Fire-damper using a Micro-Controller (마이크로컨트롤러를 이용한 소방용 댐퍼의 설계 및 제작)

  • Hwang, In-Gab;Han, Jae-Gil
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.55 no.2
    • /
    • pp.89-93
    • /
    • 2006
  • Recently as a people recognize a safety more about a high and large buildings the importance of a fire-damper which supplies fresh air into the building in case of fire increases greatly. Therefore, in this paper a fire-damper using a micro-controller is designed and fabricated. In the design of fire-damper a pressure sensor is modeled as a capacitor and the p-spice is used as a circuit simulator PIC16F72 is used as a micro-controller to drive a pressure sensor and to display a pressure value from the pressure sensor and to drive a motor to open and close a damper. A photo-coupler is used to protect a motor from a overcurrent.

A Study on the evacuation safety for disaster of weak person during building fire (건축물 화재 시 재해약자의 피난안전성에 관한 연구)

  • Seo, Dong-Goo;Kim, Dong-Eun;Eun, Eun-Kyung;Kwon, Young-Jin
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.74-81
    • /
    • 2009
  • 최근 국내의 대규모 건축물은 기존의 사양적인 피난안전계획은 미흡한 실정이다. 실질적인 방재대책 및 구체적인 피난안전계획에 관한 연구가 필요하다. 하지만 국내의 경우 성능설계 등이 현재 법제화가 이루어 졌으나 구체적인 방법론이 미비한 실정이다. 특히 재해약자의 피난특성을 고려한 피난안전계획은 이루어지지 않고 일반적인 피난성능만을 고려한 설계가 계획되고 있다. 따라서 재해약자 중 고령자를 중심으로 국외의 피난대책을 고찰하고, 이에 대한 한국의 개선방안을 도출하였다.

  • PDF

An Improvement of Fire Safety Code for Rack-Type Warehouse in Korea (국내 랙크식 창고의 방화관련 규정 개선에 관한 연구)

  • Kim, Woon-Hyung;Lee, Young-Jae
    • Fire Science and Engineering
    • /
    • v.28 no.6
    • /
    • pp.69-75
    • /
    • 2014
  • Recently Amore pacific rack-type warehouse fire broke out and argue an urgent improvement of fire protection design code including automatic sprinkler and detection design. Various type of commodities have their unique fire characteristics from fire spread rate and heat lease rate and fire hazard depends on storage height, rack arrangement, aisle width, fire load etc. With increasing ceiling height for more storage space prevent effective water spray of sprinkler head, also delays detection time causes failure of early suppression. To achieve fire protection code performance of this occupancy, Major code articles relating to a classification of commodity, sprinkler system installation, detection and fire fighting are reviewed and suggested based on fire case analysis, code review between country and field survey.

A Study on Seismic Design Method Considering Physical Properties of Piping Material (배관 재료의 물성을 고려한 내진설계 방법에 관한 연구)

  • Bang, Dae-Suk;Lee, Jae-Ou
    • Fire Science and Engineering
    • /
    • v.32 no.2
    • /
    • pp.38-47
    • /
    • 2018
  • In this study, we compare the engineering seismic design method considering the physical properties of piping materials and the specification-oriented design method according to the seismic design standards of fire fighting equipment. In the case of the seismic design method considering the physical properties of piping materials, the safety of the piping will be analyzed through the combined value of the torsional stress and the bending stress generated in the piping. However, in the case of the design-centered design method, instead of the safety of the piping material, it calculates the moving force of the pipe and interprets whether or not the shaking prevention strut can bear. Fire extinguishing equipment piping is possible through safety analysis of stress and displacement of piping material because piping safety can not be secured via unstable force generated in a certain section with one connected structure is there. Therefore, it is necessary to apply analytical method considering seismic performance of building structure and material properties of piping for seismic design of safe fire extinguishing system piping.

CCDP Evaluation of the Eire Areas in NPP Applying CEAST Model (II) (화재모델 CFAST를 이용한 원전 화재구역의 CCDP평가(II))

  • Lee Yoon-Hwan;Yang Joon-Eon;Kim Jong-Hoon;Kim Woon-Byung
    • Fire Science and Engineering
    • /
    • v.19 no.3 s.59
    • /
    • pp.20-27
    • /
    • 2005
  • This paper evaluates the fire safety level of eight pump rooms in the nuclear power plant using a fire model, CFAST We estimate the Conditional Core Damage Probability (CCDP) of each room based on the analyzed results of CFAST Eight rooms located on the primary auxiliary building of the nuclear power plant are high pressure safety injection pump room A/B, low pressure safety injection pump room Am. containment sprdy pump room A/B, and motor-driven auxiliary feed water pump room A/B. The upper layer gas temperature of each room is estimated and the integrity of cable is reviewed. Based on the results, the integrity of the cable located at the upper part of compartment is maintained without thermal damage. The Conditional Core Damage Probability Is reduced to half of the old values. Accordingly, the fire safety assessment for eight pump rooms using the fire model will be capable of reducing the uncertainty and to develop a more realistic model.