• Title/Summary/Keyword: building

Search Result 31,242, Processing Time 0.056 seconds

Effect of the building envelope on heating and cooling load in super tall building considering the meteorological changes with height (높이별 기상변화를 고려한 초고층 건축물의 외피종류별 냉난방 부하특성 분석)

  • Choi, Jong-Kyu;Kim, Yang-Soo;Song, Doo-Sam
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.337-344
    • /
    • 2012
  • Today, the number of super tall buildings are under construction or being planed in Middle East and Asian Countries. For example the burj Khalifa, the tallest building in the world, is completed in 2008 and the height of that is about 800m. Also, Lotte World Tower is under construction in Korea. External environmental conditions such as wind speed, air temperature, humidity and solar radiation around the super tall building differs according to the building height due to the vertical micro climate change. However, the meteorological information used for AC design of building is obtained typically from standard surface meterological station data(~2m above the ground). In this paper the effect of the building envelope on heating and cooling load in super tall building considering the meteorological changes with height was analyzed with simulation method. As results of this research, the guideline to select the building envelop alternatives for super tall building will be suggested in this paper.

  • PDF

Development of High-level Method for Representing Explicit Verb Phrases of Building Code Sentences for the Automated Building Permit System of Korea (서술부의 함수체계화를 통한 인허가관련 건축법규의 자동검토 응용방안)

  • Park, Seokyung;Lee, Jin-Kook;Kim, Inhan
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.313-324
    • /
    • 2016
  • As building information modeling (BIM) is expanding its influence in various fields of architecture, engineering, construction and facility management (AEC-FM) industry, BIM-based automated code compliance checking has become possible prospects. For the automated code compliance checking, requirements in building code need to be processed into explicit representation that enables automated reasoning. This paper aims to develop high-level methods that translate verb phrases into explicit representation. The high-level methods represent conditions, properties, and related actions of the building objects and clarify the core content of the constraints. The authors analyze building permit requirements in Korea Building Code and establish a standardized process of deriving the high-level methods. As a result, 60 kinds of the high-level methods were derived. In addition, method classification, analysis, and application are introduced. This study will contribute to the representation of explicit building code sentences and establishment of the automated building permit system of Korea.

Generation of the Orthoimage with the Correction of Building Occlusion

  • Yoo, Hwan-Hee;Sohn, Duk-Jae;Park, Hong-Gi
    • Korean Journal of Geomatics
    • /
    • v.1 no.1
    • /
    • pp.7-13
    • /
    • 2001
  • Geospatial Information Systems (GIS) have been employed to systematically manage and design land use in urban areas. This has increased the need for more accurate vector and raster data. In Korea, l/l,000-scale digital maps are used as vector data for the facility management in urban areas. This has increased the need for large scale orthoimages. Orthoimages generated from aerial imagery can provide accurate information, making possible the more effective city management. However, there is a large problem in using the orthoimages, i.e., currently available conventional orthoimages have not been generated based on Digital Elevation Model (DEM) that takes into account the building heights. So this causes the displacements of building image in large scale orthoimages. The present study is an attempt to generate the large scale orthoimages based on building DEM. The semiautomatic building extraction method can detect building outlines by mouse clicking on either building roofs or corners. Building DEM, based on the outline and calculated building height, was used to produce the large scale orthoimages with the corrected building occlusion.

  • PDF

The Energy Saving Effect and Economic Assessment of Office Building according to the Building Envelope Remodeling (사무소 건물의 외피 리모델링에 따른 에너지절감효과 및 경제성 분석)

  • Choi, Seon woo;Kim, Ji Yeon;Park, Hyo soon;Kim, Jun Tae
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.85-92
    • /
    • 2012
  • The Korean government has introduced building regulations with improved energy conservation measures, including higher insulation levels for building envelope. However, there are many existing buildings that tend to consume more energy for heating and cooling than new buildings, as they were built under the former regulations with relatively higher U-values of walls and glazing. In order to improve energy efficiency in existing buildings, green remodelling of building envelope and building services are required. For existing buildings, building services improvements have been achieved through energy service company(ESCO), but much attention has not been paid to building envelope improvements with various reasons, such as uncertainty of energy saving effect design issues and costs. The aim of this study is to evaluate the impact of building envelope improvements in a typical commercial building on its heating and cooling energy loads. The results show that the improvement of glazing with lower U-values has the highest energy saving effects, followed by wall, roof and floor, under the condition of same level of insulation improvements. However, high insulated glazing increased LCC because of higher initial investment costs.

A Study on the Control of the Floor Vibration in a Research Building (연구소(硏究所) 건물(建物)의 슬래브 진동(振動) 성능개선(性能改善) 연구(硏究))

  • Baik, In-Whee;Kang, Ho-Sub;Sohn, Young-Kyoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.75-82
    • /
    • 2007
  • A vibration in the building occurs by influences of the facility equipment and the structural system. As the building recently becomes higher and bigger, the vibration in the floor slab is issued. Specially, the vibration with $4{\sim}8Hz$ frequency is harder to control than any other range of frequency. This vibration easily affects human sensibility and often makes the resonance phenomenon by corresponding with the floor slab's natural frequency when people and heavy equipments move. Moreover, the permission regulations for the vibration of the building are established by building's purposes. However, it is not subdivided in detail and sometimes ambiguous to each client. Even though the vibration could cause negative influences in a research building, there is not the vibration criterion for a research building. Therefore, it is necessary to set up its own vibration criterion with the client before building and to keep checking this vibration criterion under the construction. This study proposes the reasonable control methods and the vibration criterion for floor slab's vibration which are adapted to the R4-project. The R4-project is a research building and a high-rise building also. Accordingly, this study could help to the next similar project in the design and the construction phase.

A Study on the Improvement of Building Administration by Local Government (지방자치단체 건축행정 개선방안에 관한 연구)

  • Kim, Min-Ji;Ryu, Su-Yeon;Cho, Young-Jin;Yu, Kwang-Heum
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.33 no.12
    • /
    • pp.3-11
    • /
    • 2017
  • The non-mandatory guidance and illogical ordinance of local government generate complicated and vague regulations and procedures. These cause inconvenience in building administration, and give rise to unnecessary social and administrative expenses. The purpose of this study is to suggest the improvement of building administration by local government from an institutional point of view through the literature review and the specialist survey focusing on the problems arising from the building ordinances and non-mandatory guidance. The results of this study are as follows; In the first place, the connection between law and ordinance should be improved in a systematic, definitude manner and high-degree of completion. Second, the monitoring management system should be arranged in order to excavate and improve the non-mandatory guidance. Third, the effort should go into improving ability and disposition of building official. Fourth, it is necessary to materialize and clarify the regulatory contents and adjust them to fit the legal system. Lastly, it is important to reinforce incentives and procedures of verification in order to manage building ordinances of legal government's own free will. In order to improve of building administration by local government, it is necessary to make the structure of sustainable improvement and discuss not only institutional aspect but also elements of building administration in later study.

Structural Design of High-Rise Building in Toranomon-Azabudai Project (A Block)

  • Kazumasa, Okabe;Kai, Toyama;Takuya, Furuta;Jyunichi, Yamashita;Hiroki, Mukai;Takahiro, Goseki;Shingo, Masuda;Dai, Shimazaki;Yusuke, Miyagi;Yuji, Ozawa
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.157-170
    • /
    • 2022
  • This paper explains about structural planning and structural design of the high-rise building in Toranomon-Azabudai Project (A Block) which is now under construction. The building is about 330 meters high, has 4.2 aspect ratio, and the outline of the building has shallow curve. We adopted seismic response control structure. The building is a steel rigid frame structure with braces, and it has enough stiffness to obtain its primary natural period to be less than about seven seconds, in consideration of wind response, seismic response and inhabitability for the wind shaking. In terms of business continuity plan, the building has a high seismic performance; value of story drift angle shall be 1/150 or less and members of the building remain almost undamaged while or after a large earthquake. Active mass dumper shall be installed at the top of the building to improve inhabitability while strong wind is blowing.

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

A Study on the Comparative Analysis of Building Life Cycle Carbon Emission Assessment in Korea and China (한국과 중국의 건축물 전과정 탄소배출량 평가 비교분석에 관한 연구)

  • Zheng, Peng-Fei;Tae, Sung-Ho;Lim, Hyo-Jin;Kim, Hyeon-Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.155-156
    • /
    • 2023
  • This study aims to analyze the factors that cause differences in the evaluation results of the life cycle carbon emissions assessment of buildings in both Korea and China as part of the methodology research of building life cycle assessment for Chinese buildings to promote building life cycle assessment in China. Specifically, it examines the building LCA standards of Korea and the standard for building carbon emission calculation in China as mentioned in the green building certification systems of both countries. Based on the investigation of the two standards, the life cycle carbon emissions of the evaluation target building were evaluated using the building life cycle assessment methods of both countries, and the influencing factors that cause differences in the life cycle carbon emission assessment results of the two countries were analyzed.

  • PDF

Effect of a through-building gap on wind-induced loading and dynamic responses of a tall building

  • To, Alex P.;Lam, K.M.;Wong, S.Y.;Xie, Z.N.
    • Wind and Structures
    • /
    • v.15 no.6
    • /
    • pp.531-553
    • /
    • 2012
  • Many tall buildings possess through-building gaps at middle levels of the building elevation. Some of these floors are used as sky gardens, or refuge floors, through which wind can flow with limited blockage. It has been reported in the literature that through-building gaps can be effective in reducing across-wind excitation of tall buildings. This paper systematically examines the effectiveness of two configurations of a through-building gap, at the mid-height of a tall building, in reducing the wind-induced dynamic responses of the building. The two configurations differ in the pattern of through-building opening on the gap floor, one with opening through the central portion of the floor and the other with opening on the perimeter of the floor around a central core. Wind forces and moments on the building models were measured with a high-frequency force balance from which dynamic building responses were computed. The results show that both configurations of a through-building gap are effective in reducing the across-wind excitation with the one with opening around the perimeter of the floor being significantly more effective. Wind pressures were measured on the building faces with electronic pressure scanners to help understand the generation of wind excitation loading. The data suggest that the through-building gap reduces the fluctuating across-wind forces through a disturbance of the coherence and phase-alignment of vortex excitation.