• Title/Summary/Keyword: bridges construction

Search Result 1,072, Processing Time 0.03 seconds

Design and consturction of single drilled shaft foundation (단일 현장타설말뚝 기초의 설계 및 시공)

  • Jeon, Kyung-Soo;Kim, Kyung-Suk;Kim, Jeong-Yeul
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.86-100
    • /
    • 2006
  • The single drilled shaft foundation has been used in the other countries, but has not used in South Korea at all This foundation is very effective and economic method in South Korea which is easy to meet a good rock mass within 50m depth from the ground We have many experiences to construct 1.52 5m drilled shaft foundations and ability to construct 30m drilled shaft foundation without special efforts The soil behavior is nonlinear, but it can be proposed in linear in practical purpose on bridges. The elastic modulus of soil can be rationally obtained by the method of Road Bridge Design Manual in South Korea using the Schmertmann(1970)'s proposal, and the elastic modulus of rock can be obtained by the field test. In seismic design the column and drilled shaft must be restricted to the elastic design because the behavior of this foundation is flexible and the arrangement of the rebars makes the various defect In this paper the design criteria is compared with FHWA design criteria, and the design criteria is proposed in consistent with Road Bridge Design Manual in South Korea. The single drilled shaft foundation of a test bridge was constructed in the Iksan-Jangsoo highway, and we checked its stability, workability and economy

  • PDF

Study on the Key Technologies for Performance and Operation of the High-Speed EMU (동력분산형 고속철도 차량성능 및 운용 기반기술 연구)

  • Song, Dahl-H.;Min, Kyung-H.
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1227-1232
    • /
    • 2008
  • High-speed train of push-pull type called as G7 train has been developed and chosen as the model of KTX-II which will be operated on Honam Line nexr year. However, the EMU-type high-speed train appeared to be the recent trend that foreign markets have shown. Also, in the near future, a great number of new train sets are needed to accommodate the increased passengers in our country. Thus, development of the high-speed EMU was decided, planned, and started. In the development, included were almost all fundamental key technologies such as noise and vibration reduction in a passenger cabin, running characteristics, aerodynamic analysis, crashworthiness evaluation, EMI/EMC analysis, design of the cooling system for the propulsion control system, enhanced performance of transformer and switching converters, synchronous traction motor with permanent magnets, new design of front nose and ergonomic interiors, application of advanced information technology(IT) and smart sensors and the cost reduction of construction of railway bridges, etc. Each key technologies are carried out as sub-project independently but under the supervision of a project. The project will develop the high advanced level of technologies and provide necessary know-why's and support the team in charge of the development of the high-speed EMU, Hyundai Rotem Co. Ltd. The high-speed EMU will be successfully developed with the support of the project.

  • PDF

The Development of Visual Inspection System for National Road Facility Maintenance Management (국도 시설물 유지관리를 위한 현장점검시스템 개발)

  • 주기범;김태학;박상근
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.72-77
    • /
    • 2003
  • Visual inspection works are very important part of facility maintenance and management life cycle as a step of creating base data for decision making and maintenance and repair. But currently, visual inspection works have been performed unefficiently and unreliably as works on hand, duplication of works, decisions of defect state, unutilization of inspection history, lack of professional and so on. In this research, we developed visual inspection system that processes inspection work efficiently and provides reliability of inspection output, as a target of bridges, tunnels, underground roadway on national road. We defined problems through visual inspection work analysis, examined the solutions and reflected to functional design of system. We will plan to utilize this system in HMCS(Highway Maintenance and Construction Service).

  • PDF

A Study on Propose of Maritime Audit Personnel Education & Training System (기술논문 - 해상교통안전진단인력 교육훈련 방안 제안)

  • Jang, Woon-Jae;Cho, Ik-Soon;Jeong, Jae-Yong;Kim, Chel-Seung;Park, Young-Soo
    • Journal of Korea Ship Safrty Technology Authority
    • /
    • s.32
    • /
    • pp.57-71
    • /
    • 2012
  • Recently, the navigation risk is increasing significantly with growing of vessels' volume and propelling marine facilities, water bridges and port development etc. At this point of time, the Ministry of Land, Transport, and Maritime Affairs introduced the Maritime Safety Audit(MSA) in amendment of the Korea Marine Traffic Law. audit results were survey for the last two years. As a result, appropriate certificate appears 11% among audit report, is an urgent need for improved quality of audit reports. This study is aimed to propose about Audit Personnel Education & Training System. To these solve, this paper analyzed the tendency of Audit Personnel Training. And also the opinions of user and experts were investigated and analyzed using Questionnaire survey methods. As a result, this paper was suggested, the construction of Audit Personnel Training System and the curriculum and training contents for 5-days of basic course, 2-days of expert course, 3-days of Qualification Maintain course.

  • PDF

Review of effects of friction coefficient of moving bearing on Stability of CWR (가동단 마찰계수가 장대레일 축력 안정성에 미치는 영향 검토)

  • Ryu Jae-Nam;Choi Young-Joon;Yang Sin-Chu
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.812-817
    • /
    • 2004
  • Recently drastic improvement of railway technology has been accompanied by the construction of very high-speed tracks. It should be noticed that Continuously Welded Rail(CWR) has played significant role in technical development of railway and that installation of CWR is now being scheduled on existing lines as well as newly-built lines. In general, interaction between CWR and bridge deck takes place on bridge section and additional axial force and displacement is to be developed owing to temperature and braking/acceleration forces. This interaction is known to be mainly governed by span organizations and arrangements of foot bearings. In common practice, movable bearing is stationed and designed on the assumption that it is not able to transfer the horizontal force of upper decks. However, it is well known that horizontal resistance is developed in movable bearings due to friction and that friction coefficient of movable bearing is ranged from 0.03 to 0.20 depending on the material of bearings and magnitude of reactions. Therefore, it is easily reasoned out that friction of movable bearing can influence the mutual behavior of CWR and bridge decks. Suggested in this study is to investigate the validity and efficiency of friction effect of movable bearings in controlling the axial force and displacement of CWR on continuous railway bridges.

  • PDF

A study on the Assessment of Standard Wages for Constructing Luminaries for Landscope Lighting (경관조명기구의 설치에 대한 기준노임 산정에 관한 연구)

  • Yoo, Dong-Gil;Lee, Bok-Hee;Lee, Sok-Yeon
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.169-172
    • /
    • 2008
  • Recently, landscape lighting is more and more installing in many places such as park, cultural heritages, large-scale structures, bridges, apartment, and so on. However, there is no the government-set official estimation for standard wages constructing luminaries for landscape lighting. The cost of construction is estimated based on the standard wages of related-similar installations such as internal lighting fixtures or the designer's subjective decision. Sometimes, it is overestimated or underestimated. In this paper, the fundamental process for estimating the standard wages constructing luminaries for landscape lighting is studied. The estimation method of standard wages constructing lighting fixtures was examined on the basis of the type and capacities of luminaries, installation places, type and shapes of installation auxiliary materials, worker's skill, and etc. As a result, some results obtained in this work were significantly, different with the standard wages for internal electric wiring published by Korea Electric Association. In the future, to improve the accuracy of the estimation of the standard wages for constructing luminaries for landscope lighting, detailed factors related to the installation condition and dimensions and types of luminaries should be considered.

  • PDF

A Study on the Roadkill Prevention System Based on the Web Services (웹 서비스 기반 로드킬 방지 시스템에 대한 연구)

  • Noh, Yong-Deok;Jeong, Eun-Sung;Lee, Jeong-Sik;Kim, Kyoung-Hee
    • The KIPS Transactions:PartD
    • /
    • v.15D no.6
    • /
    • pp.873-878
    • /
    • 2008
  • The wild animal warning post and the echo-bridge on the road are widely used as a popular roadkill prevention system. The warning post shows a one way warning message to drivers and is not effective to prevent animals from being killed. In the case of echo-bridge, the construction cost is very high such that we could not build sufficient number of the echo bridges on the road. Therefore, we have proposed a new roadkill prevention system which is designed and implemented to warn both of drivers and animals. This system is composed with sensor, speaker, web server, and navigation system and the software is designed to use web services on the web under the. Net environment.

A FRF-based algorithm for damage detection using experimentally collected data

  • Garcia-Palencia, Antonio;Santini-Bell, Erin;Gul, Mustafa;Catbas, Necati
    • Structural Monitoring and Maintenance
    • /
    • v.2 no.4
    • /
    • pp.399-418
    • /
    • 2015
  • Automated damage detection through Structural Health Monitoring (SHM) techniques has become an active area of research in the bridge engineering community but widespread implementation on in-service infrastructure still presents some challenges. In the meantime, visual inspection remains as the most common method for condition assessment even though collected information is highly subjective and certain types of damage can be overlooked by the inspector. In this article, a Frequency Response Functions-based model updating algorithm is evaluated using experimentally collected data from the University of Central Florida (UCF)-Benchmark Structure. A protocol for measurement selection and a regularization technique are presented in this work in order to provide the most well-conditioned model updating scenario for the target structure. The proposed technique is composed of two main stages. First, the initial finite element model (FEM) is calibrated through model updating so that it captures the dynamic signature of the UCF Benchmark Structure in its healthy condition. Second, based upon collected data from the damaged condition, the updating process is repeated on the baseline (healthy) FEM. The difference between the updated parameters from subsequent stages revealed both location and extent of damage in a "blind" scenario, without any previous information about type and location of damage.

Design criteria of wind barriers for traffic -Part 1: wind barrier performance

  • Kwon, Soon-Duck;Kim, Dong Hyawn;Lee, Seung Ho;Song, Ho Sung
    • Wind and Structures
    • /
    • v.14 no.1
    • /
    • pp.55-70
    • /
    • 2011
  • This study investigates the design criteria required for wind barriers to protect vehicles running on an expressway under a high side wind. At the first stage of this study, the lateral deviations of vehicles in crosswinds were computed from the commercial software, CarSim and TruckSim, and the critical wind speeds for a car accident were then evaluated from a predefined car accident index. The critical wind speeds for driving stability were found to be 35 m/s for a small passenger car, yet 30 m/s for a truck and a bus. From the wind tunnel tests, the minimum height of a wind barrier required to reduce the wind speed by 50% was found to be 12.5% of the road width. In the case of parallel bridges, the placement of two edge wind barriers plus one wind barrier at center was recommended for a separation distance larger than 20 m (four lanes) and 10 m (six lanes) respectively, otherwise two wind barriers were recommended.

A study on the moving picture transmission method between the accident sites and control center (사고현장과 사령실간 화상전송기술에 관한 연구)

  • 장석각;조봉관
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.484-489
    • /
    • 2002
  • Whenever the accidents occur in the railway areas, their prompt recovery is very important. The individual way has been used to resolve these accidents by direct visiting the site and reporting to others who cares for these cases. As a result, we are planning to operate the MTS (Moving picture Transmission System) for a timely information's transmission to the related peoples in the central control center by transforming the picture information on the accident-site to the digital information. The proposed system is not a transmission system using exclusive lines, but utilizing the existing railway computer network. We construct a network server device so that a dispatcher can easily connect with the server through the railway intranet. In some railway environments such as disturbed field situations and geographical condition(in tunnels and bridges, etc) building up the wired network is difficult. Solving this problem, we reviewed the wireless network. Finally we proposed the mixed wireless network that is able to cover the wired network. We then installed and tested the wired network and wireless network respectively in wayside of a railway field. Through the testing, we identified many detailed matters for some network construction approaches to the control room and many field device-connecting schemes. This research will contribute to minimize the number of staff dispatched to a disturbed field, decrease the accident recovery time and improve the quality of service to the passenger.

  • PDF