• Title/Summary/Keyword: bridges construction

Search Result 1,072, Processing Time 0.023 seconds

A Case Study on the Design and Construction of the Pile Bent System (단일현장타설말뚝을 이용한 교량기초의 설계 및 시공 사례)

  • Cho, Sung-Han;Kim, Hyung-Wook;Kim, Zu-Cheol
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.357-367
    • /
    • 2010
  • In this study, several design and construction cases of the pile bent system for bridges were introduced. The lateral displacement of the pile bent system is larger than the displacement of pile cap system, due to the smaller bending stiffness and the longer unsupported length. So, the analysis of the lateral pile displacement is main factor for the design of pile bent system and superstructure. For the accurate estimation of the pile displacement, an iterative analysis method was developed. The superstructure was analyzed regarding the pile foundation as $6{\times}6$ spring and the substructure was analysed using non-linear load transfer curves (p-y, t-z, q-z curve). And, to verify this analysis method, the estimated displacements are compared with the results of lateral load test. This analysis method is expected to be a viable alternative approach for the design of bridge foundation hereafter.

  • PDF

Optimal Design of I-type Girders in 2-Span Continuous Steel Bridges by LRFD (LRFD에 의한 연속보 주부재의 조밀 및 비조밀 단면 최적화 설계)

  • Gook, Joong-Sik;Shin, Yung-Seok
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.3 s.46
    • /
    • pp.329-337
    • /
    • 2000
  • The Load and Resistance Factor Design(LRFD) Specification defines two sets of limiting width-to-thickness ratios. On the basis of these limiting values, steel sections are subdivided into three categories: compact, noncompact, and slender sections. In this paper, I-Type girders of a 2 span continuous steel bridge are divided into compact and non-compact sections and analyzed. In the design process, an optimization formulation was adopted and ADS, a Fortran program for Automated Design Synthesis, was used. In this study, we studied about change of the section between compact and non-compact using optimization formulation.

  • PDF

Crack Width Control and Flexural Behavior of Continuous Composite Beams (연속합성보의 균열폭 제어와 휨거동 평가)

  • Shim, Chang Su;Kim, Hyun Ho;Yun, Kwang Jung
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.2 s.75
    • /
    • pp.195-206
    • /
    • 2005
  • Experimental research was performed on the 6m-6m two-span, continuous composite beams. Background research for the crack width control of continuous composite bridges in the Eurocode-4 is reviewed and equationsfor the calculation of crack width considering tension stiffening are presented. The behavior of the continuous composite beams was investigated using the initial and stabilized cracking process of the concrete slab in tension. Test results showed that the current requirement of minimum reinforcement for ductility in Korea Highway Bridge Design Codes could be reduced. The flexural stiffness of cracked continuous composite beams can be evaluated by the uncracked section analysis until the stabilized cracking stage. An empirical equation for the relationship between the stress of tensile reinforcements and crack width was obtained from the test results.

Seismic base isolation for highway steel bridges using shape memory alloys (형상기억합금을 이용한 고속도로 강교량의 면진)

  • Choi, Eun Soo;Jeon, Jun Chang
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.1 s.68
    • /
    • pp.145-153
    • /
    • 2004
  • Conventional lead-rubber bearings may be unstable in case of strong ground motions. To address this problem, this paper proposed a new concept of isolation device wherein shape memory alloy wires were incorporated in an elastomeric bearing. A three-span continuous steel bridge was used for seismic analyses to compare the performance of lead-rubber and proposed bearings. The proposed bearings showed almost the same performance as the lead-rubber bearings. In particular, the proposed bearings limited relative displacement effectively with strong ground motions and recovered its original undeformed shape.

Initial Shape Analysis of Suspension Bridge System under Dead Load (고정하중을 받는 현수교 시스템의 초기형상 결정법)

  • Kim, Min;Kim, Moon-Young
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.6
    • /
    • pp.511-521
    • /
    • 2010
  • This paper presents a simplified analysis method of determining the initial shape of suspension bridges, including the horizontal tension force of the main cable and the locations of each hanging point, considering the force equilibrium condition of each hanging point. This method is effective because it requires less effort than the methods used in other studies, for which complicated non-linear analysis was used, to comparatively determine the exact initial shape. The accuracy and validity of the present method are demonstrated by comparing the results of this study with those of previous researchers' numerical examples, including 2D and 3D models.

Time Domain Modal Identification Method by using Measured Signals and its Sensitivity to Measurement Noise (측정치를 이용한 시간영역 모우드 특성 규명 기법 및 잡음에 대한 민감도 분석)

  • Choi, Hyung Jin;Lee, Hak Eun
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.1 s.44
    • /
    • pp.83-91
    • /
    • 2000
  • The first Procedure to identify structural system by using measured data is transformation of data to frequency domain and try to recognize modal characteristics in graphical condition. Those methods are doubted about the reliability to the civil structures, especially bridges which has coupled and close modal characteristics. In this paper, feasibility of time domain modal Identification methods were examined and applied double least square method to overcome bias characteristics of the identification methods. To show the advantage of proposed method, simulation were carried out for mass-spring model. And to examine the usage of the method in realistic case, sensitivity of the methods to noise was performed.

  • PDF

A Study on the Identification Method for Flutter Derivatives of Bridge Girders using Displacement Time History Data (변위 시계열 데이터를 이용한 교량거더의 Flutter 계수 추정기법에 관한 연구)

  • Lee, Jae Hyung;Min, Won;Lee, Yong Jae
    • Journal of Korean Society of Steel Construction
    • /
    • v.13 no.5
    • /
    • pp.525-533
    • /
    • 2001
  • The wind resistant design of long-span bridges has urged a special attention to the prevention of the flutter occurrence Therefore calculation of flutter derivatives is indispensable to this prediction. A used system identification method must identify all the flutter derivatives from noisy experimental data In this paper MITD(Modified Ibrahim Tim Domain) method and AKF (Adaptive Kalman Filter) method are applied to extract flutter derivatives from section-model tests. The robustness and reliability of proposal SI methods under a high signal-to-noise ratio is demonstrated through numerical simulation for windtunnel test.

  • PDF

THE CONSTRUCTION METHOD OF IN-CERAM ALUMINA 3 UNIT BRIDGE USING CELAY SYSTEM (Celay System을 이용한 In-Ceram Alumina 3 Unit Bridge제작법)

  • Jo, Byung-Woan
    • Journal of the Korean Academy of Esthetic Dentistry
    • /
    • v.5 no.1
    • /
    • pp.34-43
    • /
    • 1996
  • In nowdays many dental CAD/CAM system were developed. Among those only Cerec and Celay were used globally as clinical application. Celay is a machinable ceramic system that is capable of milling inlays, onlays, and veneers from prefabricated industrial ceramic blocks(Vita Celay Blanks). The advatages of Celay are to simplify the manufactures and to save the processing time. For esthetics In-Ceram Alumina bridges were introduced into maxillary anterior restoration. They have a high strength, a high translucency and an excellent marginal adapation. But the laboratory processes are very difficult and complicated. So the construction of In-Ceram Alumina bridge combined with celay system was desgined. The patient is a 28 year old age male. The chief complain is missing of maxillary left central incisor. He wants to restore anterior bridge for esthetically. The Alumina bridge framework was constructed easily by celay system. Glass ilfiltration was occurred. After that, vitadura-${\alpha}$porcelain build up was occurred by conventional method. The translucency of In-Ceram Alumina 3 unit bridge revealed to be superior to that of porcelain fused to metal bridge. So we report it with clincal case and literature reviews.

  • PDF

Interdisciplinary Procedure for Scour Estimation at Inchon 2nd Bridge Piers (인천 제2연육교 세굴문제 해결을 위한 학제간 공동연구 방안)

  • Yeo, Woon-Kwang;Kim, Jeong-Hwan;Lee, Yang-Ku;Kim, Tae-In;Kim, Jong-In;Kwak, Ki-Seok;Lee, Jong-Kook;Kwak, Moon-Soo;Kim, Moon-Mo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.71-80
    • /
    • 2005
  • More than 100 bridges have been annually collapsed or seriously damaged by scouring in Korea. It is extremely hard to understand the complicated scour mechanism and estimate the scour depth with accuracy in fields, however since scouring is a very complex manifestation of sediment transport unable to describe with a simple mathematical tool. In order to obtain the reasonable solution to bridge scouring, therefore, the interdisciplinary co-operation is strongly recommended. In this study the special task force team for the scour problems around Incheon 2nd bridge piers is made, in which all kinds of scour oriented researches such as oceangraphic survey, hydraulic model test, numerical simulation, scour rate test, real-time scour monitoring, etc will be carried out. This paper provides this interdisciplinary procedure in details.

  • PDF

Study on the enhancement of data quality from shallow water seismic reflection survey (천해저 지반조사를 위한 수면 탄성파 반사법 탐사자료의 분해능 향상 연구)

  • Kim, Jung-Yul;Kim, Yoo-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.799-806
    • /
    • 2004
  • Recently, as the forerunner in establishing the Northeast Asia's logistics base, a lot of marine engineering works such as new ports and container terminals, extension of old ports, new bridges, land reclamation etc. have been progressed. Parallel to it, there is also an increasing demand for improving the safety of construction. In this situation, high resolution seismic reflection profiling can be well used, attempting to classify rocks and sediments under water, if possible, to delineate the distribution of grain sizes in sediments not only for calculating the cost of removing sediments from harbour's channels, but also for estimating the bearing capacities for bridge or port construction. However, the results from the corresponding reflection survey that has been in operation in our country can not be effectively used for engineering purposes mostly due to the insufficient resolution. Thus. in this paper, two innovative strategies are introduced to enhance resolution. The one deals with a newly designed exploration barge that will help reduce several kinds of noises encountered electrically or operationally. The other is associated with an establishment of optimum measuring system comprising e.g. a specially devised hydrophone with a combination of 7 piezoelectric elements. Field experiments performed at Busan harbour are illustrated. The quality of acquired data was thereby fundamentally improved in comparison with that obtained at the same time in a conventional way.

  • PDF