• 제목/요약/키워드: bridge underneath clearance

검색결과 2건 처리시간 0.016초

현장 및 실내조사를 통한 일반국도교량의 화재위험요소 분석 (Investigation of Potential Fire Hazard Resources of Bridges on National Routes by Field and Web-based Satellite)

  • 김용재;김승원;안호준;공정식;박철우
    • 한국도로학회논문집
    • /
    • 제19권6호
    • /
    • pp.105-115
    • /
    • 2017
  • PURPOSES : The occurrence of unexpected disasters, including fire events, increases as the road network becomes complicated and traffic volume increases. When a fire event occurs on and under bridges, the damage extensively influences direct damage to structures, vehicles, and human life and secondary socioeconomic issues owing to traffic blockage. This study investigated potential fire-hazard risks on bridges of the Korean national route road. METHODS : The investigation was conducted using field investigation and analysis with satellite pictures and road views from commercial websites and the Bridge Management System (BMS). From the filed investigation, various potential fire resources were identified. The satellite pictures and road views were helpful in measuring and recognizing conditions underneath bridges, stowage areas, etc. RESULTS : There are various potential fire resources underneath bridges such as piled agricultural products, parked petroleum tanks, construction equipment, and attached high-voltage cables. A total of 94.6% of bridges have underneath clearances of less than 15 m. A bridge underneath volume that can stow a potential fire hazard resource was $7,332m^3$ on average, and most bridges have about $4,000m^3$ of space. Based on the BMS data, the amounts of PSC and steel girders were 29% and 25%, respectively. CONCLUSIONS : It was found that the amount of stowed potential fire hazard resources was proportional to the underneath space of bridges. Most bridges have less than 15 m of vertical clearance that can be considered as a critical value for a bridge fire. The fire risk investigation results should be helpful for developing bridge fire-protection tools.

Shear lag effects on wide U-section pre-stressed concrete light rail bridges

  • Boules, Philopateer F.;Mehanny, Sameh S.F.;Bakhoum, Mourad M.
    • Structural Engineering and Mechanics
    • /
    • 제68권1호
    • /
    • pp.67-80
    • /
    • 2018
  • Recently, U-section decks have been more and more used in metro and light rail bridges as an innovative concept in bridge deck design and a successful alternative to conventional box girders because of their potential advantages. U-section may be viewed as a single vent box girder eliminating the top slab connecting the webs, with the moving vehicles travelling on the lower deck. U-section bridges thus solve many problems like limited vertical clearance underneath the bridge lowest point, besides providing built-in noise barriers. Beam theory in mechanics assumes that plane section remains plane after bending, but it was found that shearing forces produce shear deformations and the plane section does not remain plane. This phenomenon leads to distortion of the cross section. For a box or a U section, this distortion makes the central part of the slab lagging behind those parts closer to the webs and this is known as shear lag effect. A sample real-world double-track U-section metro bridge is modelled in this paper using a commercial finite element analysis program and is analysed under various loading conditions and for different geometric variations. The three-dimensional finite element analysis is used to demonstrate variations in the transverse bending moments in the deck as well as variations in the longitudinal normal stresses induced in the cross section along the U-girder's span thus capturing warping and shear lag effects which are then compared to the stresses calculated using conventional beam theory. This comparison is performed not only to locate the distortion, warping and shear lag effects typically induced in U-section bridges but also to assess the main parameters influencing them the most.