The aim of this paper is to simply present live load factor calculation methodology formulation with the addition of a simple new future load projection procedure to previously proposed two methods. For this purpose, Oregon Weigh-in-Motion (WIM) data were used to calculate live load factors by using WIM data. These factors were calculated with two different approaches and by presenting new simple modifications in these methods. A very simple future load projection method is presented in this paper. Using four different WIM sites with different average daily truck traffic (ADTT) volume, and all year data, live load factors were obtained. The live load factors, were proposed as a function of ADTT. ADTT values of these sites correspond to three different levels which are approximately ADTT= 5,000, ADTT = 1,500 and ADTT ≤ 500 cases. WIM data for a full year were used from each site in the calibration procedure. Load effects were projected into the future for the different span lengths considering five-year evaluation period and seventy-five-years design life. The live load factor for ADTT=5,000, AASHTO HS20 loading case and five-year evaluation period was obtained as 1.8. In the second approach, the methodology established in the Manual for Bridge Evaluation (MBE) was used to calibrate the live load factors. It was obtained that the calculated live load factors were smaller than those in the MBE specifications, and smaller than those used in the initial calibration which did not convert to the gross vehicle weight (GVW) into truck type 3S2 defined by AASHTO equivalents.
In this paper, design and control is proposed for a four input-series-output-series-connected ZVS full bridge converter for the photovoltaic power conditioning system (PCS). The novel topology for a photovoltaic (PV) DC/DC converter that can dramatically reduce the power rating and increase the efficiency of a PV system by analyzing PV module characteristics is proposed. The control scheme, including an input voltage controller is proposed to achieve equal sharing of the input voltage as well output voltages by a four series connected module. Design methods for ZVS power stage are also introduced. The total PV system is implemented for a 250-kW PV power conditioning system (PCS). This system has only three DC/DC converters with a 25-kW power rating and uses only one-third of the total PV PCS power. The 25-kW prototype PV DC/DC converter is introduced to verify experimentally the proposed topology. In addition, an experimental result shows that the proposed topology exhibits good performance.
This study presents a new interleaved three-level zero-voltage switching (ZVS) converter for high-voltage and high-current applications. Two circuit cells are operated with interleaved pulse-width modulation in the proposed converter to reduce the current ripple at the input and output sides, as well as to decrease the current rating of output inductors for high-load-current applications. Each circuit cell includes one half-bridge converter and one three-level converter at the primary side. At the secondary side, the transformer windings of two converters are connected in series to reduce the size of the output inductor or switching current in the output capacitor. Based on the three-level circuit topology, the voltage stress of power switches is clamped at $V_{in}/2$. Thus, MOSFETs with 500 V voltage rating can be used at 800 V input voltage converters. The output capacitance of the power switch and the leakage inductance (or external inductance) are resonant at the transition interval. Therefore, power switches can be turned on under ZVS. Finally, experiments verify the effectiveness of the proposed converter.
This paper presents a new resonant converter to achieve the soft switching of power devices. Two full-bridge converters are connected in series to clamp the voltage stress of power switches at Vin/2. Thus, power MOSFETs with a 500V voltage rating can be used for 800V input voltage applications. Two flying capacitors are connected on the AC side of the two full-bridge converters to automatically balance the two split input capacitor voltages in every switching cycle. Two resonant tanks are used in the proposed converter to share the load current and to reduce the current stress of the passive and active components. If the switching frequency is less than the series resonant frequency of the resonant tanks, the power MOSFETs can be turned on under zero voltage switching, and the rectifier diodes can be turned off under zero current switching. The switching losses on the power MOSFETs are reduced and the reverse recovery loss is improved. Experiments with a 1.5kW prototype are provided to demonstrate the performance of the proposed converter.
노후화된 PSC Beam 교량은 개선된 보강방안이 필요하다. 본 연구에서는 성능저하가 발생된 노후 PSC Beam 교량을 대상으로 PSC Beam 교량의 보강형을 폐단면 박스형태로 변환하여 이차합성 구조화함으로써, PSC Beam 교량의 강성을 안정적으로 증가시킬 수 있는 박스형 보강방안을 제안하였다. 제안된 보강방안과 기존의 외부프리스트레스 도입공법을 결합하여 보강할 경우, 보강효과를 정량적으로 규명하기 위해 시공단계해석에 따른 시간 의존적 정밀해석을 수행하였다. 성능개선을 위해 제안된 박스형 보강방안 적용 시 보강방법에 따라 전단면 및 휨 보강과 같은 다양한 형태의 보강방안을 제시한 후, 각각의 보강방안에 대해 이차합성 효과에 따른 상향캠버 및 부재응력 특성을 평가하였다. 또한 내하력 평가를 수행하여 내하율을 검토함으로서, 개선된 PSC Beam 교량의 구조 안전성을 정량적으로 평가하였다.
Journal of international Conference on Electrical Machines and Systems
/
제3권4호
/
pp.422-427
/
2014
In this paper, simple LED driver is proposed. The proposed driver has simple construction having series capacitor, bridge rectifier, and adjustable regulator IC. Constant current control is possible with the use of TL431Z. The proposed in this paper, current is greater than the rating of the load, the current controller device measures the increased current in the circuit, and turned-on so that the current will be shared. Thus current control device makes the circuit more reliable, longevity as well as increase the luminous efficacy of the LED light. The simulation and experimental results are presented to show the validity of the proposed circuits.
Residual Deformation Analysis(RDA) is a new method for ratings of the continuous bridges. The RDA makes it possible to expand the inelastic steel girder bridge design method set forth in the American Association of State Highway Officals'(AASHTO) Guide Specifications for Alternate Load Factor Design Procedures for Steel Beam Bridges Using Braced Compact Sections(1986) into an inelastic rating method. It is a method to assess the residual moments and deformations that are set up in a beam that has been loaded into the post-elastic range This method combines classical elastic conjugate beam theory with linear moment-rotation relationships for midspan inelastic positive moment. The limit state is inelastic serviceability limit. which is defined as the ratio of the span to midspan inelastic deflection(C=L/D).
At present, harmonic currents cause serious problems in power conversion system using the semiconductor switching device. Also some of the conversion system provokes harmonic currents against to the main power supply system and causes hindrances for the system. Main power impedance of the traditional LC passive filter method, influences on the filter characteristics and amplifies the harmonics when resonance phenomenon is occurred. And the traditional existing 2 level inverter systems show the limit in capacity of voltage and current in case of occurring sudden load change. So, to solve this problem active filter which uses cascaded H-bridge multi level inverter has been designed and ex-filter system circuits were totally investigated. With multi level active filtering system not only the size of filter but also the size of filter for transformer can be reduced by half and so as to the weight, while the capacity of inverter can be double sized and wave forms can be compensated exactly and precisely. Also by the benefit of the increase in rating capacity, the various currents owing to the load fluctuation can be dealt more steadily. In order to simulate the wave form of harmonics based on the measured data on the AC 25kV high speed Domestic Commercial railway, it was simulated with PSCAD/EMTDC and PSIM. Based on the results of this demonstration, the power supply system and inverter system would be more stable and also promoting its efficiency.
국내 RC 슬래브교의 경우 공용연수가 20년 이상인 교량이 전체의 70% 이상을 차지하며, 노후화된 구조물의 수가 증가함에 따라 구조물의 안전 진단 및 유지관리의 중요성이 증가하는 실정이다. 고속도로 교량의 경우 바닥판 균열은 열화현상의 우선적인 원인이 되며, 교량 내구성 및 사용수명 저하에 밀접한 관계가 있다. 또한 신축이음과 교량받침 등의 부재 손상으로 인한 손상 발생 비율이 약 73%로 주부재보다 높다. 따라서 본 연구에서 교량 부재 손상과 바닥판 열화가 결합된 손상 시나리오를 정의하였다. 설계하중으로는 일교차를 고려한 온도 증감과 차랑햐중을 고려하여 개별 단일 손상 및 이종손상 시나리오 발생 시 바닥판 응력 분포와 최대 응력 발생 지점을 비교 분석하였다. 또한 바닥판 열화의 주요한 원인이 되는 균열의 점검 및 진단이력데이터 기반으로 공용연수 별 손상 시나리오에 대한 손상확산 분석 및 상태등급 예측을 수행하였다. 교량부재 손상이 동반되어 발생하는 이종손상의 경우 단일손상 대비 균열 면적율과 손상확산율이 증가되며, 상태등급 C에 도달하는 시기도 매우 빠를 것으로 예측된다. 따라서 교량부재 손상이 발생하였을 때, 신속한 보수 및 교체가 이루어지지 않으면 바닥판의 손상 발생과 손상 확산으로 인한 2차 피해를 유발하는 원인이 될 수 있다. 따라서 바닥판 응답에 대한 지속적인 관찰과 대응이 필요할 것으로 판단된다.
ALFD방법은 연속합성판형교의 과재하중과 최대하중에 대한 강도검토에 있어서 실제적인 거동을 나타낼 수 있는 탄소성해석법이다. 주어진 하중으로 인한 최대 정, 부모멘트단면에서의 항복은 활하중이 통과한 후에 잔류하는 소성회전을 일으킨다. 또한 제조시의 잔류응력으로 인하여 이론적인 항복모멘트 이하에서도 소성변형을 일으킨다. 이러한 국부항복은 다음에 작용되는 과재하중하에서 탄성화되어 정의 자생모멘트를 유발한다. 본 연구에서는 지점과 최대 정모멘트 단면에서의 단위소성회전각으로 인한 자생모멘트를 공액보법과 3연모멘트법에 의하여 구하였고, 9개의 설계경간을 지점단면을 감소시켜가면서 본 연구에서 개발한 전산프로그램에 의하여 연속관계와 모멘트-비탄성회전각 실험곡선과 일치하는 자생모멘트를 구하였다. 또한 한국도로교시방서에 준하여 비조밀단면을 갖는 3경간 연속합성판형교의 평가를 수행하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.