철도교량형식의 경간에 따른 형고 비교 (Comparison of Girder Height by Span in Various Types of Railway Bridge)

  • 이태규;김혜욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.262-267
    • /
    • 2008
  • The type used mainly in present our country in the superstructure of the railway bridge including the high speed railway is classified by the box girder and the I-type girder, greatly. The box girder is mainly used by the high speed railway bridge, and the I-type girder is used mostly by general railway bridge style. In this study, according to current railway bridge design code, we execute design by the span length of each considered bridge form. Also we analyze the suitable girder height by the span length and calculate the construction costs. The comparative analysis of the structural efficiency is produced by the span length. From this study, it is exposed that the girder height by the span length is the biggest in box girder. Also it is evaluated that the construction costs of the box girder is higher than that of the I-type girder although there is a difference between more or less according to adopted construction method.

  • PDF

교량공사 제3자 피해 손실에 의한 리스크 분석 연구 (A Study on Bridge Construction Risk Analysis for Third-Party Damage)

  • 안성진;남경용
    • 한국건축시공학회지
    • /
    • 제20권2호
    • /
    • pp.137-145
    • /
    • 2020
  • 최근 교량은 장대화, 신공법의 도입에 따른 위험요인의 증가로 교량공사에서의 철저한 안전 및 리스크 관리 체계가 필요하다. 공사 현장 주변에 있는 발주자 건설공사 관련자 및 공사와 관련이 없는 제 3자의 기존 재산에 손해를 발생시킬 수 있어 제3자 피해 손실로 인한 리스크가 명확히 분석되어야 함에도 불구하고 연구가 미비한 실정이다. 본 연구는 교량건설 사업에 대한 국내 주요 보험사의 과거 보험료 지급 실적을 토대로 실제 교량 건설에서 제3자 피해 손실로 인한 손실에 대한 교량건설 특성에 따른 리스크 요인을 분석하고, 정량화된 예측 손실 모델을 개발하고자 하였다. 정량적 교량건설 손실모형 개발을 위해 사고 건당 보험지급액을 총공사비로 나눈 손실비율을 종속변수로 선정하였고, 상부구조, 하부구조, 홍수 및 도급순위가 교량건설 중 제3자 피해에 의한 손실비율에 영향을 미치는 지표로 나타났다. 도출된 결과는 건설프로젝트에 대한 손실 평가 모델 개발에 기존의 프로젝트 내부에서 발생한 손실과 더불어 제3자 피해손실을 고려함으로써 더불어 균형 있는 리스크 평가에 필수적인 지침으로 활용할 수 있다.

CALS oriented design/fabrication information system for steel bridges

  • Isohata, Hiroshi;Fukuda, Masahiko;Watanabe, Sueo
    • Steel and Composite Structures
    • /
    • 제3권1호
    • /
    • pp.13-32
    • /
    • 2003
  • In this paper design and fabrication information system for steel bridge construction is studied and proposed according to the progress of Construction CALS/EC in the construction industry in Japan. The data exchange in this system bases on the text file as well as CAD data with simplified drawings. The concept of this system is discussed following the analysis on the issues of the conventional system. The application of the product model is also discussed including effects and issues on the inspection system. This paper is based on the study carried out by Special Committee on Construction CALS of JASBC to which author belong.

교량기초를 위한 석회암 공동지반의 지반보강 설계 및 시공 (A design and construction for reinforcement of bridge foundations on the limestone cavities)

  • 박종호;최용기;한현희;김태훈;박용원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.205-212
    • /
    • 2002
  • Carbonate rocks such as limestone are susceptible to solution and show numerous solution cavities. For the construction of the structures such as bridge foundations and tunnel on the limestone cavities, the geological unconformities developed in the bed rocks, cavity systems and the filling types of solution deposits should be surveyed and analyzed. And also, the stability of structures on the limestone cavities must be taken into consideration in the view of the geotechnical engineering. As a result of analysis of the foundation settlement, an economic and effective reinforcement method is to be proposed and the construction by the proposed method is to be accompanied with verification of reinforcement effect. This paper is a case study of design and construction for the reinforcement of bridge foundations on the limestone cavity covered with thick bedded colluvial soils.

  • PDF

Seismic performance of prefabricated bridge columns with combination of continuous mild reinforcements and partially unbonded tendons

  • Koem, Chandara;Shim, Chang-Su;Park, Sung-Jun
    • Smart Structures and Systems
    • /
    • 제17권4호
    • /
    • pp.541-557
    • /
    • 2016
  • Prefabricated bridge substructures provide new possibility for designers in terms of efficiency of creativity, fast construction, geometry control and cost. Even though prefabricated bridge columns are widely adopted as a substructure system in the bridge construction project recently, lack of deeper understanding of the seismic behavior of prefabricated bridge substructures cause much concern on their performance in high seismic zones. In this paper, experimental research works are presented to verify enhanced design concepts of prefabricated bridge piers. Integration of precast segments was done with continuity of axial prestressing tendons and mild reinforcing bars throughout the construction joints. Cyclic tests were conducted to investigate the effects of the design parameters on seismic performance. An analytical method for moment-curvature analysis of prefabricated bridge columns is conducted in this study. The method is validated through comparison with experimental results and the fiber model analysis. A parametric study is conducted to observe the seismic behavior of prefabricated bridge columns using the analytical study based on strain compatibility method. The effects of continuity of axial steel and tendon, and initial prestressing level on the load-displacement response characteristics, i.e., the strain of axial mild steels and posttensioned tendon at fracture and concrete crushing strain at the extreme compression fiber are investigated. The analytical study shows the layout of axial mild steels and posttensioned tendons in this experiment is the optimized arrangement for seismic performance.

Traffic-induced vibrations at the wet joint during the widening of concrete bridges and non-interruption traffic control strategies

  • Junyong Zhou;Zunian Zhou;Liwen Zhang;Junping Zhang;Xuefei Shi
    • Computers and Concrete
    • /
    • 제32권4호
    • /
    • pp.411-423
    • /
    • 2023
  • The rapid development of road transport has increased the number of bridges that require widening. A critical issue in the construction of bridge widening is the influence of vibrations of the old bridge on the casting of wet joint concrete between the old and new bridges owing to the running traffic. Typically, the bridge is closed to traffic during the pouring of wet joint concrete, which negatively affects the existing transportation network. In this study, a newly developed microscopic traffic load modeling approach and the vehicle-bridge interaction theory are incorporated to develop a refined numerical framework for the analysis of random traffic-bridge coupled dynamics. This framework was used to investigate traffic-induced vibrations at the wet joint of a widened bridge. Based on an experimental study on the vibration resistance of wet joint concrete, traffic control strategies were proposed to ensure the construction performance of cast-in-site wet joint concrete under random traffic without interruption. The results show that the vibration displacement and frequency of the old bridge, estimated by the proposed framework, were comparable with those obtained from field measurements. Based on the target peak particle velocity and vibration amplitude of the wet joint concrete, it was found that traffic control measures, such as limiting vehicle gross weight and limiting traffic volume by closing an additional traffic lane, could ensure the construction performance of the wet joint concrete.

사례기반추론 기법을 이용한 교량 공사비 추론 모형 구축 (Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method)

  • 김민지;문현석;강인석
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.42-52
    • /
    • 2013
  • 본 연구는 기존의 선형적인 공사비 예측방법의 한계를 극복하고 사례기반추론 (Case Based Reasoning, CBR)기법을 통해 기획단계의 실적정보를 활용하여 신뢰도 높은 공사비 예측 모델을 제시하는 것이 목적이다. 이를 위하여 사례기반추론 기법과 유전자알고리즘 (Genetic Algorithm, GA)의 선택연산을 복합적으로 활용한 스프레드시트 기반의 교량공사비 추론모델을 제시하였다. 추론모델의 검증을 위하여 국내 교량공사 시공사례 4건을 적용하였으며, 적용 결과 평균 8.69%의 오차율로 나타나 교량공사비의 예측 정확도가 타 분석방법과 비교하여 상대적으로 높은 것으로 파악하였다. 연구에서 제시된 교량공사비 예측모델은 초기 설계단계에서 상세제원에 대한 정보를 획득할 수 없을 경우에, 교량의 대표적 제원정보 만으로 공사비 선택범위를 최소화된 오차율로 예측할 수 있으므로, 개선된 보정 방법으로서 교량공사의 합리적인 개략공사비 산정에 활용될 수 있을 것으로 판단된다.

북한 건설환경을 고려한 초고성능 콘크리트 프리캐스트 교량의 구조성능 및 경제성 평가 (Evaluation on the Structural Performance and Economics of Ultra-high Performance Concrete Precast Bridges Considering the Construction Environment in North Korea)

  • 김경철;고경택;손민수;류금성;강재윤
    • 한국건설순환자원학회논문집
    • /
    • 제9권2호
    • /
    • pp.208-215
    • /
    • 2021
  • 본 연구에서는 북한 건설환경을 고려한 초고성능 콘크리트 프리캐스트 교량 시스템을 개발하고자 한다. 맞춤형 교량 시스템은 최근에 개발된 압축강도 120MPa 이상, 직접인장강도 7MPa 이상을 갖는 초고성능 콘크리트를 적용하여 설계, 제작 및 구조성능평가를 통하여 북한의 적용 가능성을 분석하였다. 설계를 위해 북한의 자동차짐(30, 40, 55)을 남한의 KL-510 하중과 비교한 결과, 하중이 증가함에 따라 단면이 증가하는 것으로 나타났다. 또한, 구조성능평가를 위하여 지간장 30m 교량 실험체를 초고성능 콘크리트를 이용하여 제작하였다. 휨 실험을 통하여 하중 분석을 수행한 결과, 설계하중 대비 측정하중은 초기균열하중상태에서 약 167%의 단면성능과 극한한계상태에서 약 134% 이상의 내하력을 확보하여 본 실험에서 요구하는 성능을 만족하였다. 이러한 결과는 기존의 강합성 거더교로 제작하는 장지간 교량 대비 약 11%의 상부공사비가 감소하는 것으로 분석되었다. 그러므로, 본 연구를 통하여 개발된 60m 이상 장지간 맞춤형 교량 시스템을 활용한다면 충분한 가격 경쟁력을 확보 할 수 있을 것으로 기대된다.

선형 적응적 가중 응답면기법에 의한 현수교의 위험도 분석 (Risk Analysis of Suspension Bridge by a Linear Adaptive Weighted Response Surface Method)

  • 조태준;김이현;조효남
    • 한국강구조학회 논문집
    • /
    • 제20권1호
    • /
    • pp.93-104
    • /
    • 2008
  • 국내 시공 중인 현수교의 시공단계에 대한 신뢰성 해석을 통한 위험성 평가를 실시하였다. 본 논문의 주요 연구목표는 (1) 현수교주케이블 소선의 파단에 대한 신뢰성 해석, (2) 보강형 거더 가설 28단계에 대한 위험단계 결정, (3) 보강형 거더 가설중 시공관리에 대한 한계상태의 신뢰성 평가이다. 기존의 현수교에 대한 연구와 설계는 주로 경험적인 데이터에 의존해 왔으나 최근 조사된 자료에 의하면 교량의 완공 전에 발생하는 사고의 원인의 80%는 인간의 오류, 계획, 설계, 재료 및 하중의 불확실성과 관련되어 있다. 교량의 완성계에 대해서는 많은 연구가 수행되어왔으나 시공중의 불확실성에 대해서는 시방서나 지침 등으로 정리되어 있지 않은 부분이 많다. 개선된 선형 적 용적 응답면기법을 사용하여 예제교량의 시공단계에 대한 위험성 평가를 하였다.

모듈러 공법 기반 강교 공급사슬 관리를 위한 시뮬레이션 모형 개발 (Development of a Simulation Model for Supply Chain Management of Modular Construction based Steel Bridge)

  • 이재일;정은지;김시남;정근채
    • 한국건설관리학회논문집
    • /
    • 제23권2호
    • /
    • pp.3-15
    • /
    • 2022
  • 본 연구에서는 모듈러 공법 기반 강교 건설공사에 대해 공급사슬 관리를 위한 시뮬레이션 모형을 개발한다. 이를 위해, 우선 강교 건설에 대한 공장 제작/현장 시공 체계 자료를 수집한 후, 이를 바탕으로 공급사슬, 개체, 자원, 공정 등을 정의하였다. 이후, Arena 소프트웨어를 이용하여 데이터, 플로차트, 애니메이션 모듈을 작성함으로써 강교 공급사슬 시뮬레이션 모형을 개발하였다. 마지막으로, 개발된 모형의 논리성 검증과 유효성 확인을 위한 애니메이션 검증, 극한 조건 검증, 평균값 확인, 리틀의 법칙 확인, 사례 실적값 확인 등의 방법론을 이용하여 모형의 타당성을 검토하였다. 검토 결과, 개발된 시뮬레이션 모형은 논리적 오류 없이 강교 공급사슬의 공정과 특성을 적합하게 표현하며, 분석 대상 공급사슬에 대한 정확한 성능평가척도 예측치를 제공하였다. 향후, 본 연구에서 개발된 시뮬레이션 모형은 강교 공급사슬 체계를 최적으로 운영하기 위한 관리기법을 개발함에 있어 성능 평가 플랫폼으로서의 역할을 충실히 수행할 수 있을 것이다.