• Title/Summary/Keyword: bridge construction

Search Result 1,911, Processing Time 0.238 seconds

PCCAP을 이용한 장대 사장교의 버페팅 해석 (Beffeting Analysis of Long Span Cable-stayed Bridge using PCCAP)

  • 유원진;이석용;남효승;이완수
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.202-208
    • /
    • 2003
  • In this study, a time domain analysis is presented for investigation on the buffeting response of cable-stayed bridge during both erection and completion stages. The main span length and width of deck are 520 m and 15.1m, each. Since the ratio of span over width is 34.44, aerodynamic stability of the bridge during erection is expected to dominate the safety of the bridge in construction stage. Several conclusions regarding different construction stages and temporary wind cables are obtained.

  • PDF

영도대교 콘크리트의 강도 특성 (The Strength Properties of Concrete used in Yeongdo Bridge)

  • 이일성;안재철;강병희;김기수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.23-25
    • /
    • 2011
  • The purpose of this study is to suggest documentation with determination of concrete then property, according to demolition and restoration the Youngdo bridge which has valuable meaning to modern technique as an only bascule bridge in Korea.

  • PDF

진동법을 이용한 사장교 시공단계별 케이블 장력관리 (Cable Tension Force Management Using Vibration Method at Cable Stayed Bridge Construction Stages)

  • 박연수;전동호;전양배;강경구
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제9권4호
    • /
    • pp.127-134
    • /
    • 2005
  • 최근 컴퓨터 기술의 발달로 장대교량의 설계 및 시공이 증가하고 있다. 특히 케이블 요소를 갖는 사장교와 현수교는 장대교량을 대표한다 할 수 있을 것이다. 따라서 본 논문에서는 사장교로 시공중인 제2진도대교에 대하여 시공단계별로 전체케이블에 대한 장력을 측정하여 시공오차 등에 따른 장력보정값을 현장에서 즉시 제시하여 시공정밀도를 향상하고자 하였다. 이에 적용된 장력측정방법은 간접법인 가속도센서를 이용한 진동법을 적용하였다. 직접법에 비해 비교적 간편한 간접인 진동법을 통하여 보다 쉽게 장력을 추정할 수 있었으며, 시공의 정밀도를 향상시키기 위하여 전체 케이블을 4가지 시공단계별로 장력변화량을 모니터링하여 케이블 가설시 시공오차에 대한 장력보정값을 현장에서 제시하였다. 또한, 최종장력값을 설계값과 비교한 결과 간접법을 이용한 장력값과 유사한 것을 알 수 있었다. 그리고 온도 변화에 따른 케이블의 장력변화를 추후 유지관리 계측시 관리한계치 설정에 참고자료로 활용할 수 있도록 장력변화를 파악하였다.

Flutter analysis of Stonecutters Bridge

  • Hui, Michael C.H.;Ding, Q.S.;Xu, Y.L.
    • Wind and Structures
    • /
    • 제9권2호
    • /
    • pp.125-146
    • /
    • 2006
  • Stonecutters Bridge of Hong Kong is a cable-stayed bridge with two single-column pylons each 298 m high and an aerodynamic twin deck. The total length of the bridge is 1596 m with a main span of 1018 m. The top 118 m of the tower will comprise structural steel and concrete composite while the bottom part will be of reinforced concrete. The bridge deck at the central span will be of steel whilst the side spans will be of concrete. Stonecutters Bridge has adopted a twin-girder deck design with a wide clear separation of 14.3 m between the two longitudinal girders. Although a number of studies have been conducted to investigate the aerodynamic performance of twin-girder deck, the actual real life application of this type of deck is extremely limited. This therefore triggered the need for conducting the present studies, the main objective of which is to investigate the performance of Stonecutters Bridge against flutter at its in-service stage as well as during construction. Based on the flutter derivatives obtained from the 1:80 scale rigid section model experiment, flutter analysis was carried out using 3-D finite element based single parameter searching method developed by the second author of this paper. A total of 6 finite element models of the bridge covering the in-service stage as well as 5 construction stages were established. The dynamic characteristics of the bridge associated with these stages were computed and applied in the analyses. Apart from the critical wind speeds for the onset of flutter, the dominant modes of vibration participating in the flutter vibration were also identified. The results indicate that the bridge will be stable against flutter at its in-service stage as well as during construction at wind speeds much higher than the verification wind speed of 95 m/s (1-minute mean).

교량용 거더 원격 정밀거치 시스템 개념 설계 (Conceptual Design of Remote Precise Installation System for Bridge Girders)

  • 이상윤;박영수;이상원;정태일;송재준
    • 로봇학회논문지
    • /
    • 제16권3호
    • /
    • pp.199-206
    • /
    • 2021
  • The robot is an effective means to perform repetitive tasks quickly and accurately. It could be more effective in dangerous environments where human is difficult to access. The construction site is a dangerous environment with a high possibility of industrial accidents where heavy work is frequently carried out at a high place. In particular, an accident in the construction site is highly likely to lead to a severe disaster. Of course, various technologies are being developed to monitor the safety of workers in construction sites and prevent accidents, but there is a limit to eliminate the risk of accidents. Therefore, it is necessary to make efforts to replace workers exposed to dangerous environments with equipment or robots that could be controlled remotely in a more active way. In this study, Remote Precise Installation System was proposed to replace the workers exposed to the risk of accident at a high place during the bridge construction. Also, the conceptual design and analytical reviews of this system were carried out. Suppose Remote Precise Installation System is developed according to the derived concept and the target performance. In that case, this system is expected to be applied as a technology that can effectively replace the workers at the bridge construction site.

A method for evaluation of longitudinal joint connections of decked precast concrete girder bridges

  • Smith, Matthew Z.;Li, Yue;Bulleit, William M.
    • Structural Engineering and Mechanics
    • /
    • 제40권3호
    • /
    • pp.297-313
    • /
    • 2011
  • As bridge conditions in the United States continue to deteriorate, rapid bridge replacement procedures are needed. Decked precast prestressed concrete (DPPC) girders are used for rapid bridge construction because the bridge deck is precast with the girders eliminating the need for a cast-in-place slab. One of the concerns with using DPPC girders as a bridge construction option is the durability of the longitudinal joints between girders. The objectives of this paper were to propose a method to use a spring element modeling procedure for representing welded steel connector assemblies between adjacent girders in DPPC girder bridges, perform a preliminary study of bridge performance under multiple loading scenarios and bridge configurations, and discuss model flexibility for accommodating future field data for model verification. The spring elements have potential to represent the contribution of joint grout materials by altering the spring stiffness.

변단면 하로판형교의 계획 및 설계 (The Plan & Design for Through Plate Girder Bridge of Variable Section)

  • 민영택;김성렬;고승영;김영상
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.530-537
    • /
    • 2006
  • Recently, the railroad route plan is trying to minimize the damage of the local resident which is caused by railroad construction. For this reason, reducing the banking height of soil roadbed, lowering the bridge girder height of a solid intersection and a part of cross river, the through bridge type which can achieve a required span length must apply. The representative through bridges of railroad are arch bridges, truss bridges and plate girder bridges, the through plate girder bridge of variable section can apply that the span length of these bridges is about $30{\sim}50m$, namely, middle span length bridge types, and that can satisfy structural capacity and beauty of railroad at the same time. This paper introduces plan and design process of the Su-eo cheon bridge applied by a through plate girder bridge type of the Jinju-Gwangyang double track 6th construction ordered at Korea Rail network Authority in 2005.

  • PDF

A Study on the Probabilistic Risk Analysis for Safety Management in Construction Projects

  • Lee, Dong-Yeol;Kim, Dong-Eun
    • 한국컴퓨터정보학회논문지
    • /
    • 제26권8호
    • /
    • pp.139-147
    • /
    • 2021
  • 건설 분야의 산업재해가 차지하는 비율은 전체 산업의 29%로 고위험군산업에 해당한다. 또한 다양한 공정이 존재하며, 소수의 관리자가 다수의 근로자를 관리하고 감독하는 특성상 위험도 관리가 필수적이다. 따라서 공사의 종류 및 공법에 따라 체계적이고 과학적인 위험도분석 방안을 마련해야 하며, 작업현장의 위험도를 점진적으로 완화하고 개선해야한다. 본 연구에서는 도로 교량공사 공종별 안전사고 발생확률 자료 및 전문가 데이터를 기초로 하고 확률론적 접근 방법인 몬테카를로 시뮬레이션을 활용하여 신뢰도 있는 위험지수를 산정할 수 있는 방안을 제시하고 평가하였다. 리스크 식별은 도로 교량공사를 토공사, 배수공사, 교량공사로 구분하여 전문가 데이터를 바탕으로 발생가능한 안전사고를 분류하였다. 도로 교량공사의 토공사, 배수공사, 교량공사의 세부공종별로 위험지수를 도출하였다.

거더교 상판 콘크리트 타설용 거푸집 개발 및 경제성 분석 (Development of the Purlin Hanging System Form for the Girder Bridge Slab and Economic Analysis)

  • 임지영;김선국;손기영
    • 한국건축시공학회지
    • /
    • 제16권3호
    • /
    • pp.271-278
    • /
    • 2016
  • 국내 철도 및 도로 교량의 대표적 상부구조 형식인 철제 (steel box 또는 H-형강) 거더교와 PSC (Pre-Stressed Concrete) 거더교는 현재 가장 많이 시공되는 교량형식으로 전체 교량의 75%, 시공 금액의 80%를 차지하고 있다. 거더교 상판 콘크리트 타설을 위한 거푸집 공사는 여러 가지 시공의 어려움 때문에 다양한 공법이 개발 및 적용되었다. 그러나 재료 손실 및 인건비 상승으로 인한 원가 상승, 미숙련공에 의한 품질 저하, 복잡한 시공방법으로 인한 공기 증가, 생산성 저하, 고소작업으로 인한 안전사고 발생, 큰 부재로 인한 운송성 저하, 재료 특성으로 인한 유지관리비 증가 등 여러 가지 문제가 부분적으로 해결되지 않았다. 이를 해결하기 위하여 기존 공법을 대체할 수 있는 공법이 필요하다. 따라서 본 연구는 거더교 상판 콘크리트 타설용 시스템 거푸집 (Purlin Hanging System Form)의 개발 연구 및 경제성 분석을 목적으로 한다. 본 연구를 통해 Purlin Hanging System Form이 기존 공법에 비해 60%의 원가절감, 80%의 공기단축 효과가 있음을 확인하였다.

중소규모 교량시설물의 유지관리를 위한 전자매뉴얼 구성 (A Study on the Electronic Manual of Maintenance System for Bridge Facilities on Local Area)

  • 정원명;장경태;강인석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.581-584
    • /
    • 2003
  • 최근 건설분야에서는 시설물의 사용을 극대화하기 위한 유지관리분야에 많은 관심이 집중되고 있는 추세이며, 특히 여러 시설물 중 교량과 같은 경우는 일반인의 사용빈도가 많으므로 시공상의 결함이 발생할 경우, 치명적인 피해는 물론 많은 경제적인 손실이 예상되는 부분이라 할 수 있다. 본 연구에서는 교량 시설물의 안전한 사용과 품질향상을 위해 국내 중소규모 교량에 대한 유지관리 현황 및 교량 관리시스템을 분석하여 새로운 형태의 유지 관리시스템인 BF\_IETM (Bridge Facility\_Interactive Electronic Technical Manual)을 제안하여 그 활용효과를 살펴보았다. $BF\_IETM$은 그 이름에서 알 수 있듯이 일반 IETM의 기능과 역할을 포함하고 있는 것으로, 기존의 종이 기반의 건설기술문서를 컴퓨터를 이용한 전자문서체계로의 전환을 이룸과 동시에 첨단의 정보기술매체를 통한 시설물의 유지관리 업무 활동을 지원할 수 일도록 구성된 시스템이라 할 수 있다.

  • PDF