The Multi-Physics (MP) instrument is one of 20 neutron spectrometers planned in the China Spallation Neutron Source (CSNS). This paper presents a shielding calculation for the MP instrument using Monte Carlo codes MCNPX and FLUKA. First, the neutrons that escape from the CSNS decoupled water moderator and are delivered to the beam line of the MP instrument are calculated to use as the source term of the shielding calculation. Then, to validate the calculation method based on multiple variance reduction techniques, a cross check between MCNPX and FLUKA codes is performed by comparing the calculation results of the dose rate distribution on a simplified beam line model. Finally, a complete geometry model of the MP instrument is set up, and the primary parameters for the shielding design are obtained according to the calculated dose rate map considering different worst-case scenarios.
Osman, Aznoora;Wahab, Nadia Abdul;Fauzi, Haryati Ahmad;Ibrahim, Norfiza;Ilyas, Siti Sarah Md;Seman, Azmi Abu
International Journal of Computer Science & Network Security
/
v.22
no.11
/
pp.163-171
/
2022
A conceptual model represents an understanding of a system that is going to be developed, which in this research, a driving simulation software to study driver behavior at signalised intersections. Therefore, video observation was conducted to examine driver compliance behaviour within the dilemma zone at signalised intersection, pertaining to driver's distance from the stop line during yellow light interval. The video was analysed using Thematic Analysis and the data extracted from it was analysed using Chi-Square Independent Test. The Thematic Analysis revealed two major themes which were traffic situation and driver compliance behaviour. Traffic situation is defined as traffic surrounding the driver, such as no car in front and behind, car in front, and car behind. Meanwhile, the Chi-Square Test result indicates that within the dilemma zone, there was a significant relationship between driver compliance behaviour and driver's distance from the stop line during yellow light interval. The closer the drivers were to the stop line, the more likely they were going to comply. In contrast, drivers showed higher noncompliant behavior when further away from stop line. This finding could help us in the development of conceptual model of driving simulation with purpose of studying driver behavior.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.17
no.1
s.104
/
pp.1-7
/
2006
New phase shifters with higher phase shift values are presented using defected ground structures(DGSs). The varactor diodes are mounted on DGSs of termination loads to control the large phase variation of the DGS at resonance. Two types of phase shifters are implemented with a branch-line and a coupled line hybrid. The experimental results of the proposed phase shifters show $135\%$ and $221\%$ increases in maximum phase shills, respectively, compared with those of conventional ones.
Journal of the Korean Operations Research and Management Science Society
/
v.23
no.2
/
pp.83-101
/
1998
Assembly U-lines are increasingly accepted in industry, especially just-in-time production systems, for the efficient utilization of workforce. In this paper, we present an integer programming formulation and a branch-and-bound method for balancing the U-line with the objective of minimizing the number of workstations with a fixed cycle time. In the mathematical model, we provide the method that can reduce the number of variables and constraints. The proposed branch-and-bound method searches the optimal solution based on a depth-first-search. To efficiently search for the optimal solutions to the problems, an assignment rule is used in the method. Bounding strategies and dominance rules are also utilized. Some problems require a large amount of computation time to find the optimal solutions. For this reason. some heuristic fathoming rules are also proposed. Extensive experiments with test-bed problems in the literature are carried out to show the performance of the proposed method. The computational results show that our method is promising in solution quality.
Journal of Advanced Marine Engineering and Technology
/
v.33
no.4
/
pp.562-568
/
2009
In this paper, using the periodic ground structure (PGS), highly miniaturized branch-line coupler and impedance transformer were realized on Si radio frequency integrated circuit (RFIC). The branch-line couple exhibited good RF performance from 41.75 to 50 GHz, and its size was $0.46{\times}0.55mm^2$, which is 37 % of conventional one. The impedance transformer exhibited good RF performance from 1 to 40GHz, and its size was $0.01mm^2$, which is 6.99 % of conventional one.
Journal of the Institute of Electronics Engineers of Korea TC
/
v.47
no.6
/
pp.22-25
/
2010
This paper presents the modified design that can reject the harmonic signals in the branch-line coupler. After adding open stubs at the center of quarter-wavelength lines of the traditional design, all network parameters can be determined by network equivalence, in order to maintain the conventional function at the operating frequency and suppress its harmonic terms to de chosen. Experimental results show the second and third harmonic suppressions to be -37.5 and -42.7dBs, while maintaining conventional performance at the fundamental frequency.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.3
/
pp.451-456
/
2007
This paper presents a problem that reconfigure distribution power system using branch exchange method. Optimal reconfiguration problem calculates line loss, voltage condition about system states of all situations that become different according to line On/off status, and search for optimum composition of these. However, result is difficult to be calculated fast. Because radiated operation condition of system is satisfied using many connection and sectionalize switches in the distribution power system. Therefore, in this paper, optimization method for reducing system total loss and satisfying operating condition of radial and constraints condition of voltage is proposed using the fastest branch exchange. And optimal solution at branch exchange algorithm can be wrong estimated to local optimal solution according to initial operating state. Considering this particular, an initial operating point algorithm is added and this paper showed that optimal solution arrives at global optimal solution.
As the same concept with GIB, GIL(Gas Insulated Line) has been established and run for the first time in New Jersey, America, in 1972. At the beginning, the installation condition of GIL was complicated and the construction cost was excessive, so it was not economical, but the construction cost was substantially reduced with the use of insulation material which is the mixture of $SF_6$ and $N_2$ Gas in Germany, in 1990s. And also comparing to cable, GIL has lots of advantages, such as being capable of the high voltage transmission, being applied to reclosing and lowering the strength of electromagnetic force, Due to these advantages, GIL is recently accepted in many countries.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.31
no.4
/
pp.261-266
/
2018
When the clamp meter approaches the electric path where current is flowing, leakage current can be measured at a distance from the electric current because the induced current increases as the magnitude of the current increases and approaches nearer to the electric path. Therefore, measurements were carried out from a distance to avoid this effect. In addition, the measured values differ depending on the location of the power line that penetrates the ZCT of the clamp meter, thus measurements were performed at a location where this effect was minimized. The fraction of compliant branch circuits, whose leakage current was lower than 1.00 mA, was found to be 69.0% out of the total of 439 branch circuits, while the percentage of compliant branch circuits having an insulation resistance higher than $0.20M{\Omega}$ was found to be 93.2%. The reason why the percentage of compliant branch circuits with low leakage current was low might be due to the inclusion of capacitive leakage current in the total measured leakage current.
Naeini, Ehsan Mostaghimi;Vaseghi, Behrouz;Mahdavian, Mehdi
Journal of Electrical Engineering and Technology
/
v.12
no.2
/
pp.533-540
/
2017
Distance relay identifies the type and location of fault by measuring the transmission line impedance. However any other factors that cause miss calculating the measured impedance, makes the relay detect the fault in incorrect location or do not detect the fault at all. One of the important factors which directly changes the measured impedance by the relay is series capacitive compensation (SCC). Another factor that changes the calculated impedance by distance relay is fault resistance. This paper provides a method based on the combination of distance and differential protection. At first, faulty transmission line is detected according to the current data of buses. After that the fault location is calculated using the proposed algorithm on the transmission line. This algorithm is based on active power calculation of the buses. Fault resistance is calculated from the active powers and its effect will be deducted from calculated impedance by the algorithm. This method measures the voltage across SCC by phasor measurement units (PMUs) and transmits them to the relay location via communication channels. The transmitted signals are utilized to modify the voltage signal which is measured by the relay. Different operating modes of SCC and as well as different faults such as phase-to-phase and phase-to-ground faults are examined by simulations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.