• 제목/요약/키워드: blasting rock

Search Result 439, Processing Time 0.031 seconds

A Case Study on the Application of Self Supporting Air Tube (자립형 에어튜브의 현장적용에 관한 사례연구)

  • Lee, Shin;Kang, Dea-Woo
    • Tunnel and Underground Space
    • /
    • v.17 no.4
    • /
    • pp.248-254
    • /
    • 2007
  • Already, the air deck blasting method has been used to take many advantages of blasting. In the existing air deck blasting method, air deck is made usually on column charge. But in the case study, we analyzed about the effect of self supporting air tube which made air deck in column charge. As results of this case study, it was shown that blasting vibration was decreased about $20{\sim}26%$ and quantity of explosive was decreased about $10{\sim}20%$. Also, fragmentation was shown to be smaller than it of common blasting method.

A Study on the Characteristics of Blasting Vibration by Superposition Modeling (중첩 모델링을 통한 발파진동의 특성에 관한 연구)

  • Kang, Choo-Won;Kim, Seung-Hyun;Park, Hyun-Sik
    • Tunnel and Underground Space
    • /
    • v.16 no.4 s.63
    • /
    • pp.326-333
    • /
    • 2006
  • In this study, the vibration waveform of the single hole which is not interfered from the different blasting holes is separated, the each dominant frequency which is determinated through the Fast Fourier Transform(FFT) is measured. Also the separation waveform executed a superposition modeling which changes to delay time from 1ms to 80 ms in 1ms interval and controls the number of blasting holes from 2 holes to 15 holes in order to investigate the effect of PPV according to the duration time of the vibration and the number of blasting holes. As a result of analysis, the longer the duration time of the vibration, the longer the delay time which is not interfered from the different blasting holes and the effect regarding the number of blasting holes from inside identical delay time did not appear a lot.

A Case Study of Combining NDC Blasting Method and Wide Space Blasting Method to Increase Blast Efficiency (NDC 및 Wide Space 혼합공법을 통한 발파효율 개선 사례연구)

  • No, Sang-Lim;Noh, Seung-Hwan;Lee, Sang-Pil;Lee, Hoon-Yeon;Lee, Tai-Ro
    • Tunnel and Underground Space
    • /
    • v.16 no.5 s.64
    • /
    • pp.387-393
    • /
    • 2006
  • This paper introduces the combination of two blasting methods applied to reduce blast-vibration and increase blast efficiency. NDC (New Deck Charge) blasting method using air deck effect with separation tube made of paper was effective to reduce blast-vibration, while blast efficiency was decreased a little in the bottom of a blasthole. Wide Space blasting method has an advantage to control the fragmentation and to increase blast efficiency over conventional blasting methods. In this study new blasting method combining NDC blasting method and Wide Space blasting method was applied to the field, it was confirmed to reduce blast-vibration and increase blast efficiency. It is expected to make useful blasting method to cover the public complaints and to shorten construction time by accumulating blasting data using new method with various conditions.

Case History of Vibration-controlled Reckmass Breakage Method by Rock Splitter (할암기를 이용한 무진동 암반 파쇄공법의 현장 적응 사례)

  • 최영천
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.71-78
    • /
    • 2004
  • Explosive blasting, hydaulic power unit and rock splitter are typically utilized for rockmass breakage and cutting in reconstruction of building structures and other construction site. Hydraulic rock cutting method, that can be utilized any weather conditions, has been applied mainly by experience for controling damages caused by vibration, noise and rock cuttings, and reducing damage claim by protecting adjacent structures. However, it is required to understand the characteristics of rockmass to improve operation efficiency. Although every cutting method has its own advantage, but it should be applied by considering site circumstance and rockmass properties in details to maximize the operation efficiency and economic feasibility.

Development and evaluation of new drilling and blasting method for excavaton of rock mass with one free surface (일자유면 암반 굴착을 위한 신바파공법의 개발 및 평가)

  • 임재웅;윤영재;서정복
    • Tunnel and Underground Space
    • /
    • v.4 no.3
    • /
    • pp.237-249
    • /
    • 1994
  • A new type of cut method, called SK-cut, was developed in order to overcome the shortcomings of the conventional V-cut and Burn-cut blasting methods. Total 190 times of test blasts were performed for the evaluation of the efficiency of new blasting method. V-cut, Burn cut and SK-cut were compared by applying them to the excavation of main gallery and construction tunnel of underground oil storage cavern. Test results showed that excavation efficiency of the new method was increased by 5.9~9.8% and that specific charge was reduced to 71~92%.

  • PDF

Experience of the Application of a Rock Cracking Method Using Steam Pressure to Tunnel Excavation (증기압을 이용한 파암공법의 현장 적용성 연구)

  • Kim, Duk-young;Kim, Sun-Woong
    • Explosives and Blasting
    • /
    • v.35 no.2
    • /
    • pp.1-8
    • /
    • 2017
  • In this study, the characteristics of a new rock cracking method using steam pressure are briefly presented. The rock cracking method was originally developed as a means to decrease the ground vibrations from underground rock excavations. The validation tests were also conducted by applying the method to an actual rock tunnel under construction. The ground vibrations were measured in the vicinity of the test site. The measured vibration results were compared with the values predicted by an attenuation equation, which had been proposed by a company in Japan. Also, a simple cost assessment for the method was conducted to demonstrate its cost effectiveness in underground tunnel excavations.

Prediction of Rock Fragmentation and Design of Blasting Pattern based on 3-D Spatial Distribution of Rock Factor (발파암 계수의 3차원 공간 분포에 기초한 암석 파쇄도 예측 및 발파 패턴 설계)

  • Shim Hyun-Jin;Seo Jong-Seok;Ryu Dong-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.4 s.57
    • /
    • pp.264-274
    • /
    • 2005
  • The optimum blasting pattern to excavate a quarry efficiently and economically can be determined based on the minimum production cost which is generally estimated according to rock fragmentation. Therefore it is a critical problem to predict fragment size distribution of blasted rocks over an entire quarry. By comparing various prediction models, it can be ascertained that the result obtained from Kuz-Ram model relatively coincides with that of field measurements. Kuz-Ram model uses the concept of rock factor to signify conditions of rock mass such as block size, rock jointing, strength and others. For the evaluation of total production cost, it is imperative to estimate 3-D spatial distribution of rock factor for the entire quarry. In this study, a sequential indicator simulation technique is adopted for estimation of spatial distribution of rock factor due to its higher reproducibility of spatial variability and distribution models than Kriging methods. Further, this can reduce the uncertainty of predictor using distribution information of sample data The entire quarry is classified into three types of rock mass and optimum blasting pattern is proposed for each type based on 3-D spatial distribution of rock factor. In addition, plane maps of rock factor distribution for each ground levels is provided to estimate production costs for each process and to make a plan for an optimum blasting pattern.

Effects of Input Parameters in Numerical Modelling of Dynamic Ground Motion under Blasting Impact (발파하중을 받는 지반의 동적 거동 수치 모델링에서 입력변수의 영향)

  • Ryu, Chang-Ha;Choi, Byung-Hee;Jang, Hyung-Su;Kang, Myoung-Soo
    • Tunnel and Underground Space
    • /
    • v.25 no.3
    • /
    • pp.255-263
    • /
    • 2015
  • Explosive blasting is a very useful tool for mining and civil engineering applications. It, however, may cause severe environmental hazards on adjacent structures due to blasting impact. Blast engineers try to make optimum blast design to provide efficient performance and to minimize the environmental impact as well. It requires a pre-assessment of the impacts resulting from the blasting operation in design stage. One of the common procedures is to evaluate the proposed blast pattern through a series of test blasting in the field. Another approach is to evaluate the possible environmental effects using the numerical methods. There are a number of input parameters to be prepared for the numerical analysis. Some of them are well understood, while some are not. This paper presents some results of sensitivity analysis of the basic input parameters in numerical modelling of blasting problems so as to provide sound understanding of the parameters and some guidelines for input preparation.

Application of Digital Image Correlation Method for Measurement of Rock Pillar Displacement and Vibration Due to Underground Mine Blasting (지하 광산발파에 따른 암반광주의 변위 및 진동 측정을 위한 이미지 영상 상관법 적용연구)

  • Ko, Young-Hun;Seo, Seung-Hwan;Lim, Hyun-Sung;Jin, Tai-Lie;Chung, Moon-Kyung
    • Explosives and Blasting
    • /
    • v.37 no.4
    • /
    • pp.1-9
    • /
    • 2019
  • In this study the applicability of a Digital Image Correlation (DIC) method was investigated by measuring the displacement and vibration of rock pillar due to underground mining blasting. When combined with a high speed photography technology, the DIC method provides an excellent photographic image processing ability that can be used to convert the evolving full-field surface properties of structures to 2D or 3D set of coordinate values. The measured coordinate sets are then used to calculate the displacement, strain, and velocity of the target structure. This technique is widely used in science and engineering, and continuously finds its new application areas. In this study, the DIC system and the conventional seismograph were compared for their ability to measure the displacement and vibration produced by blasting. In the field test both methods showed similar results. Thus, it is concluded that the DIC method is feasible to measure the ground displacements and vibrations from blasting.

Vibration Prediction and Charge Estimation in Hard Rock Blasting Site (경암층 발파현장에서 진동예측 및 장약량산정)

  • Park, Yeon-Soo;Park, Sun-Joon;Choi, Sun-Min;Mun, Soo-Bong;Mun, Byeong-Ok;Jeong, Gyung-Yul;Jeong, Tae-Hyeong;Hwang, Seung-Ill;Kim, Min-Jung;Park, Sang-Chul;Kim, Jung-Ju;Lee, Byeong-Geun
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.19 no.3
    • /
    • pp.313-319
    • /
    • 2009
  • The blasting has a lot of economic efficiency and speediness but it can damage to a neighbor structure, a domestic animal and a cultured fish due to the blasting vibration, then the public grievance is increased. Therefore, we need to manage the blasting vibration efficiently. The prediction of the correct vibration velocity is not easy because there are lots of different kinds of the scale of blasting vibration and it has a number of a variable effect. So we figure the optimum line through the least-squares regression by using the vibration data measured in hard rock blasting and compared with the design vibration prediction equation. As a result, we confirm that the vibration estimated in this paper is bigger than the design vibration prediction equation in the same charge and distance. If there is a Gaussian normal distribution data on the left-right side of the least squares regression, then we can estimate the vibration prediction equation on reliability 50%(${\beta}=0$), 90%(${\beta}=1.28$), 95%(${\beta}=1.64$). 99.9%(${\beta}=3.09$). As a result, it appears to be suitable that the reliability is 99% at the transverse component, the reliability 95% is at the vertical component, the reliability 90% is at the longitudinal component and the reliability is 95% at the peak vector sum component.