• Title/Summary/Keyword: biological sludge

Search Result 438, Processing Time 0.028 seconds

Sludge Returned CMAS에 의한 전기부속품제조공장 폐수처리

  • 김남천;이시진
    • Microbiology and Biotechnology Letters
    • /
    • v.25 no.4
    • /
    • pp.427-433
    • /
    • 1997
  • Sludge Returned CMAS process was applied to treat the wastewater from electric accessory manufacturing company while this type of wastewater was usually treated by chemical process. This result show that the removal rate of TCOD was about 70-80% regardless of hydraulic retention time, On the contrary, the removal rate of BOD was abtained in a range of 77-92% depending on hydraulic retention time. In order to remove more than 80% of organic materials with the proposed process, the F/M ratio should be maintained below 0.17. In this case, the calculated value of organic removal rate, Km, was calculated to be 1.26 hr$^{-1}$, and the ratio of cell synthesis/total energy was 0.32 and 0.26 for COD and BOD base, respectively. The yield coefficient was calculated to be 0.242 and the half velocity coefficient was 0.3 hr$^{-1}$. The value of endogenous respiration coefficient was 0.02 hr$^{-1}$. The measured effluent BOD concentration, MLSS concentration in aeration tank, oxygen uptake rate, and sludge production were matched relatively well with the calculated values using above coefficients, In order to optimize the dewatering of sludge, the hydraulic retention time was recommended to be 15. 6 hrs. These results indicate that the wastewater from an eletric accessory manufacturing company can be treated safely with a biological process.

  • PDF

Advanced Wastewater Treatment using Sludge Solubilization by the Cavitation and PGA addition (Cavitation에 의한 슬러지 가용화와 PGA를 이용한 하수고도처리에 관한 연구)

  • KIM, Dongha
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.4
    • /
    • pp.449-454
    • /
    • 2008
  • Some pretreatment methods have been proposed to enhance the biodegradability and to shorten the hydrolysis reaction time. By means of efficient pretreatment the suspended solids (SS) can be made of better accessible for the anaerobic bacteria. There are several ways how this can be accomplished, which include biological, mechanical, thermal, and chemical methods. For the sludge solubilization using the cavitation phenomenon, we have tried to develop a pretreatment process consisted of a reactor and pumps. The objectives of this study were to develop a advanced wastewater treatment consisted of IABR and the cavitation with PGA. The most effective removal for organic matter and nutrients were occured when both cavitation pretreatment and ${\gamma}$-PGA were applied at the IABR process. Only small portion of ${\gamma}$-PGA at a rate of 1.38mg/L, was enough to improve sedimentation ability, SS removal efficiencies, and sludge volume reduction. After the sludge solubilization by the cavitation, SCOD increased to 193% and SS decreased to 36%. The removal ratio of BOD was 94.5%, T-N removal ratio was 85.5% and T-P removal ratio was 84.9%. The combination process of the IABR with the cavitation and PGA addition seems to be very effective alternative wastewater treatment process.

A Comparative Study on the Conditioning and Dewaterability of Digested Sludge from Intermittent Aerobic Digestion (간헐포기 소화슬러지의 개량과 탈수 특성에 관한 비교 연구)

  • Kim, Seong Hong;Choi, Young Gyun;Chung, Tai Hak
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.4
    • /
    • pp.370-375
    • /
    • 2004
  • Synthetic organic polyelectrolytes can be used to condition sludges to enhance their dewaterability. When conditioning biological sludges, the charge on the polymer has a significant impact on the effectiveness of the polymer as a conditioner. The objectives of this investigation were to determine the most effective type and dosage of polymer for conditioning digested sludge prior to dewatering, and to investigate the relationship between dewaterability and particle size. 3 types of digested sludge were used under the different digestion processes like anaerobic digestion, aerobic digestion and intermittent aerobic digestion. CST(capillary suction time), TTF(time-to-filter) and SRF(specific resistance to filtration) were tested as a dewaterability index and the number of particle distribution was analyzed using particle size analyzer. The results indicate that cationic polymer appears to be required for effective conditioning of these 3 types digested sludge and the optimal polymer dosage is about 0.6% of SS. CST and TTF are well correlated with mean particle diameter of which the dimension order is 1.7.

Treatment of Wastewater from Acetaldehyde Plant by Activated Sludge Process (활성슬러지 공정에 의한 Acetaldehyde 제조 공장 폐수의 처리)

  • Suh, Seung-Kyu;Kim, Jung-Ho;Kim, Young-Ho
    • Journal of Environmental Science International
    • /
    • v.6 no.3
    • /
    • pp.259-265
    • /
    • 1997
  • This study was conducted to Investigate the treatment of wastewater from acetaldehyde manufacturing plant by activated sludge process with Micrococcus roseus AW-6, Micrococcus roseus AW-22, Microbacterium lacticum AW-38 and Mlcrobacterium nae- vaniformans AW-41. The $COD_{Mn}$ and $BOD_5$ of the wastewater were 5, 260mg/L and 6, 452mg/L, respectively. pH was 1.85. The main organic component in the wastewater was acetic acrid which was contained 67, 600mg/L. Optimum dilution time for activated sludge process was shown 10 times. The specific substrate removal rate(BL) was 1.95day-1 and the nonbiodegradable matters(Sn) were 23.2mg/L. Saturation constant (Ks) and mainmum specific growth rate(qmax) were 1, 640mg/L and 2.33day-1, respectively. Sludge yield coefficient(Y) and endogenous respiration coefficient(kd) were 0.28mg MLVSS/mgCOD and 0.02day-1, respectively. $COD_{cr}$ removal efficiency was 91% for 1.95day of hydraulic retention time.

  • PDF

Removal of Nitrogen and Phosphorus by Activated Sludge Process Combined with Aluminum Corrosion (알루미늄 부식을 적용한 활성슬러지법에서 질소 및 인 제거)

  • Choi Hyung Il;Cheong Kyung Hoon;Park Sang Il;Paik Ke Jin
    • Journal of Environmental Health Sciences
    • /
    • v.31 no.2 s.83
    • /
    • pp.172-178
    • /
    • 2005
  • A laboratory experiment was performed to investigate simultaneous removal of phosphorus and nitrogen from raw sewage by intermittently aerated activated sludge process packed with aluminum and silver plate. Two continuous experimental process, i.e. an intermittently aerated activated sludge process, and an intermittently aerated activated sludge process with an aluminum and silver plate packed into the reactor were compared. The pitting corrosion of aluminum does not affect the performance of the biological treatment. The amounts of Al eluted from aluminum plate 17 mg to 60.6 mg in this experimental conditions, and Al/P mole ratio were from 3.31 to 11.25. The total nitrogen removal efficiency in Run E were $60.6\%$ at the HRT of 12 hours. The effluent $PO_4-P$ concentration as low as $1.0\;mg/\iota$ could have been obtained during the continuous experiment in Run E at HRT of 12 hours.

Sewage Sludge Treatment with Internal Recirculation and Diverse Pre-treatment Methods Using Combined Digestion Process (혼합 소화공정에서 내부반송과 다양한 전처리를 통한 하수 슬러지 처리)

  • Ha, Jeong Hyub;Choi, Suk Soon;Park, Jong Moon
    • Applied Chemistry for Engineering
    • /
    • v.29 no.5
    • /
    • pp.613-619
    • /
    • 2018
  • In this study, various influent sludge pre-treatment methods and the internal recirculation of thickened sludge from effluents using a liquid/solid separation unit were adopted to investigate their effects on the sludge digestion and methane production in a combined mesophilic anaerobic and thermophilic aerobic sludge digestion process. A lab-scale combined sludge digestion process was operated during 5 phases using different feed sludge pre-treatment strategies. In phase 1, the feed sludge was pre-treated with a thermal-alkaline method. In contrast, in phases 2, 3 and 4, the internal recirculation of thickened sludge from the effluent and thermal-alkaline, thermal, and alkaline pre-treatment (7 days) were applied to the combined process. In phase 5, the raw sludge without any pre-treatment was used to the combined process. With the feed sludge pre-treatment and internal recirculation, the experimental results indicated that the volatile suspended solid (VSS) removal was drastically increased from phases 1 to 4. Also, the methane production rate with the thermal-alkaline pre-treatment and internal recirculation was significantly improved, showing an increment to 285 mL/L/day in phase 2. Meanwhile, the VSS removal and methane production in phase 5 were greatly decreased when the raw sludge without any pre-treatment was applied to the combined process. Considering all together, it was concluded that the combined process with the thickened sludge recirculation and thermal-alkaline pre-treatment can be successfully employed for the highly efficient sewage sludge reduction and methane gas production.

A study on the Treatment of Brewhouse Wastewater using Biological Film Process (생물막법에 의한 양조폐수 처리에 관한 연구)

  • Eun, Jong-Geuk;Lee, Tae-Ho
    • Journal of environmental and Sanitary engineering
    • /
    • v.18 no.3 s.49
    • /
    • pp.59-63
    • /
    • 2003
  • This study was carried out to get efficient of organic material removal and wastage sludge production minimized effects on the treatment of Brewhouse wastewater using aerobic RBC and curtain biological film contact process. As a results of biofilm attachment experiment aggravation of water quality due to excessive biofilm showed after every 13 days of operating times. The concentration of BOD at raw wastewater was 3800${\sim}$5300 mg/L and COD was 2300${\sim}$3100 mg/L. The average BOD of effluent was maintained 18 mg/L and average COD was 26 mg/L. The result of this experiment was wastage sludge did not almost generated.

A study on the Treatment of Slaughterhouse Wastewater using Curtain Biological Film Contact Process. (커어튼형 생물막 접촉공법에 의한 도축장 폐수 처리에 관한 연구)

  • 이태호;은종극
    • Journal of environmental and Sanitary engineering
    • /
    • v.15 no.4
    • /
    • pp.14-19
    • /
    • 2000
  • This study was carried out to get efficient of nutrient removal and wastage sludge production minimized effects on the treatment of slaughterhouse wastewater using aerobic curtain biological film contact process. As a results of biofilm attachment experiment aggravation of water quality due to excessive biofilm showed after every 15 days of operating times. The concentration of BOD and COD in the influent were 2500~3000mg/L and 1700~2100mg/L , respectively. The average BOD and CoD were 9mg/L and 17mg/L , respectively. The result of this experiment was wastage sludge did not almost generated and the removal efficiency of nutrients were kept equilibrium.

  • PDF

Evaluation of Biohydrogen Production Using Various Inoculum Sources (다양한 접종원을 이용한 바이오수소 생산 평가)

  • Geumhee, Kim;Jiho, Lee;Hyoju, Yang;Yun-Yeong, Lee;Yoonyong, Yang;Sungho, Choi;Moonsuk, Hur;Byounghee, Lee;Kyung-Suk, Cho
    • Microbiology and Biotechnology Letters
    • /
    • v.50 no.4
    • /
    • pp.557-562
    • /
    • 2022
  • In this study we evaluated biohydrogen production potential as operational parameters (substrate, salt concentration, and temperature) using eight inoculum sources. While the volumetric biohydrogen production rate was significantly affected by temperature and inoculum sources, substrate and salt concentration did not have a significant effect on the biohydrogen production. Mesophilic temperature (37℃) was also found more appropriate for the hydrogen production than thermophilic temperature (50℃). Rate, while the eight inoculum sources, anaerobic digestion sludge exhibited the fastest biohydrogen production. The maximum production rate from anaerobic digestion sludge was 2,729 and 1,385 ml-H2·l-1·d-1 at mesophilic and thermophilic temperature, respectively.