Sludge Returned CMAS process was applied to treat the wastewater from electric accessory manufacturing company while this type of wastewater was usually treated by chemical process. This result show that the removal rate of TCOD was about 70-80% regardless of hydraulic retention time, On the contrary, the removal rate of BOD was abtained in a range of 77-92% depending on hydraulic retention time. In order to remove more than 80% of organic materials with the proposed process, the F/M ratio should be maintained below 0.17. In this case, the calculated value of organic removal rate, Km, was calculated to be 1.26 hr$^{-1}$, and the ratio of cell synthesis/total energy was 0.32 and 0.26 for COD and BOD base, respectively. The yield coefficient was calculated to be 0.242 and the half velocity coefficient was 0.3 hr$^{-1}$. The value of endogenous respiration coefficient was 0.02 hr$^{-1}$. The measured effluent BOD concentration, MLSS concentration in aeration tank, oxygen uptake rate, and sludge production were matched relatively well with the calculated values using above coefficients, In order to optimize the dewatering of sludge, the hydraulic retention time was recommended to be 15. 6 hrs. These results indicate that the wastewater from an eletric accessory manufacturing company can be treated safely with a biological process.
Some pretreatment methods have been proposed to enhance the biodegradability and to shorten the hydrolysis reaction time. By means of efficient pretreatment the suspended solids (SS) can be made of better accessible for the anaerobic bacteria. There are several ways how this can be accomplished, which include biological, mechanical, thermal, and chemical methods. For the sludge solubilization using the cavitation phenomenon, we have tried to develop a pretreatment process consisted of a reactor and pumps. The objectives of this study were to develop a advanced wastewater treatment consisted of IABR and the cavitation with PGA. The most effective removal for organic matter and nutrients were occured when both cavitation pretreatment and ${\gamma}$-PGA were applied at the IABR process. Only small portion of ${\gamma}$-PGA at a rate of 1.38mg/L, was enough to improve sedimentation ability, SS removal efficiencies, and sludge volume reduction. After the sludge solubilization by the cavitation, SCOD increased to 193% and SS decreased to 36%. The removal ratio of BOD was 94.5%, T-N removal ratio was 85.5% and T-P removal ratio was 84.9%. The combination process of the IABR with the cavitation and PGA addition seems to be very effective alternative wastewater treatment process.
Synthetic organic polyelectrolytes can be used to condition sludges to enhance their dewaterability. When conditioning biological sludges, the charge on the polymer has a significant impact on the effectiveness of the polymer as a conditioner. The objectives of this investigation were to determine the most effective type and dosage of polymer for conditioning digested sludge prior to dewatering, and to investigate the relationship between dewaterability and particle size. 3 types of digested sludge were used under the different digestion processes like anaerobic digestion, aerobic digestion and intermittent aerobic digestion. CST(capillary suction time), TTF(time-to-filter) and SRF(specific resistance to filtration) were tested as a dewaterability index and the number of particle distribution was analyzed using particle size analyzer. The results indicate that cationic polymer appears to be required for effective conditioning of these 3 types digested sludge and the optimal polymer dosage is about 0.6% of SS. CST and TTF are well correlated with mean particle diameter of which the dimension order is 1.7.
This study was conducted to Investigate the treatment of wastewater from acetaldehyde manufacturing plant by activated sludge process with Micrococcus roseus AW-6, Micrococcus roseus AW-22, Microbacterium lacticum AW-38 and Mlcrobacterium nae- vaniformans AW-41. The $COD_{Mn}$ and $BOD_5$ of the wastewater were 5, 260mg/L and 6, 452mg/L, respectively. pH was 1.85. The main organic component in the wastewater was acetic acrid which was contained 67, 600mg/L. Optimum dilution time for activated sludge process was shown 10 times. The specific substrate removal rate(BL) was 1.95day-1 and the nonbiodegradable matters(Sn) were 23.2mg/L. Saturation constant (Ks) and mainmum specific growth rate(qmax) were 1, 640mg/L and 2.33day-1, respectively. Sludge yield coefficient(Y) and endogenous respiration coefficient(kd) were 0.28mg MLVSS/mgCOD and 0.02day-1, respectively. $COD_{cr}$ removal efficiency was 91% for 1.95day of hydraulic retention time.
Choi Hyung Il;Cheong Kyung Hoon;Park Sang Il;Paik Ke Jin
Journal of Environmental Health Sciences
/
v.31
no.2
s.83
/
pp.172-178
/
2005
A laboratory experiment was performed to investigate simultaneous removal of phosphorus and nitrogen from raw sewage by intermittently aerated activated sludge process packed with aluminum and silver plate. Two continuous experimental process, i.e. an intermittently aerated activated sludge process, and an intermittently aerated activated sludge process with an aluminum and silver plate packed into the reactor were compared. The pitting corrosion of aluminum does not affect the performance of the biological treatment. The amounts of Al eluted from aluminum plate 17 mg to 60.6 mg in this experimental conditions, and Al/P mole ratio were from 3.31 to 11.25. The total nitrogen removal efficiency in Run E were $60.6\%$ at the HRT of 12 hours. The effluent $PO_4-P$ concentration as low as $1.0\;mg/\iota$ could have been obtained during the continuous experiment in Run E at HRT of 12 hours.
In this study, various influent sludge pre-treatment methods and the internal recirculation of thickened sludge from effluents using a liquid/solid separation unit were adopted to investigate their effects on the sludge digestion and methane production in a combined mesophilic anaerobic and thermophilic aerobic sludge digestion process. A lab-scale combined sludge digestion process was operated during 5 phases using different feed sludge pre-treatment strategies. In phase 1, the feed sludge was pre-treated with a thermal-alkaline method. In contrast, in phases 2, 3 and 4, the internal recirculation of thickened sludge from the effluent and thermal-alkaline, thermal, and alkaline pre-treatment (7 days) were applied to the combined process. In phase 5, the raw sludge without any pre-treatment was used to the combined process. With the feed sludge pre-treatment and internal recirculation, the experimental results indicated that the volatile suspended solid (VSS) removal was drastically increased from phases 1 to 4. Also, the methane production rate with the thermal-alkaline pre-treatment and internal recirculation was significantly improved, showing an increment to 285 mL/L/day in phase 2. Meanwhile, the VSS removal and methane production in phase 5 were greatly decreased when the raw sludge without any pre-treatment was applied to the combined process. Considering all together, it was concluded that the combined process with the thickened sludge recirculation and thermal-alkaline pre-treatment can be successfully employed for the highly efficient sewage sludge reduction and methane gas production.
This study was carried out to get efficient of organic material removal and wastage sludge production minimized effects on the treatment of Brewhouse wastewater using aerobic RBC and curtain biological film contact process. As a results of biofilm attachment experiment aggravation of water quality due to excessive biofilm showed after every 13 days of operating times. The concentration of BOD at raw wastewater was 3800${\sim}$5300 mg/L and COD was 2300${\sim}$3100 mg/L. The average BOD of effluent was maintained 18 mg/L and average COD was 26 mg/L. The result of this experiment was wastage sludge did not almost generated.
This study was carried out to get efficient of nutrient removal and wastage sludge production minimized effects on the treatment of slaughterhouse wastewater using aerobic curtain biological film contact process. As a results of biofilm attachment experiment aggravation of water quality due to excessive biofilm showed after every 15 days of operating times. The concentration of BOD and COD in the influent were 2500~3000mg/L and 1700~2100mg/L , respectively. The average BOD and CoD were 9mg/L and 17mg/L , respectively. The result of this experiment was wastage sludge did not almost generated and the removal efficiency of nutrients were kept equilibrium.
Geumhee, Kim;Jiho, Lee;Hyoju, Yang;Yun-Yeong, Lee;Yoonyong, Yang;Sungho, Choi;Moonsuk, Hur;Byounghee, Lee;Kyung-Suk, Cho
Microbiology and Biotechnology Letters
/
v.50
no.4
/
pp.557-562
/
2022
In this study we evaluated biohydrogen production potential as operational parameters (substrate, salt concentration, and temperature) using eight inoculum sources. While the volumetric biohydrogen production rate was significantly affected by temperature and inoculum sources, substrate and salt concentration did not have a significant effect on the biohydrogen production. Mesophilic temperature (37℃) was also found more appropriate for the hydrogen production than thermophilic temperature (50℃). Rate, while the eight inoculum sources, anaerobic digestion sludge exhibited the fastest biohydrogen production. The maximum production rate from anaerobic digestion sludge was 2,729 and 1,385 ml-H2·l-1·d-1 at mesophilic and thermophilic temperature, respectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.