A Study on the Policies to improve the Escalating Regulations of Construction Price - With a Focus on Results of a Delphi Survey - (물가 변동에 따른 건설공사비 조정 제도의 개선 방안 - 델파이(Delphi) 설문 조사 결과를 중심으로 -)

  • Choi Min-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.203-211
    • /
    • 2004
  • This study is the results to survey on the problems and improvable Policies for current escalation system in construction contracts, through a Delphi survey to experts. From the survey results, it is desirable to decide the fluctuation rate of construction cost, which is the requirement of escalation clause, on the basis of inflation rate or construction cost index. The desirable price fluctuation rate is proposed as a $3\%$ level. However, it is difficult for construction companies to cope with the sudden increase of material price in advance, arising from short-term shock factors such as exchange rate and international raw material's price. Accordingly escalation system for specified materials, as an exceptional mode, should be introduced. As a method to calculate the fluctuation rate, ARCA(adjustment rate for the categories of articles) is more desirable than ARI(adjustment rate for an index), because the ARCA can be more reflected the characteristics of each construction work.To rationalize the ARI method, it is needed to announce the wage index, material index and machinery expense index via detailed classification by construction types. Also, it is desirable to prescribe the bidding date as a starting date of the price change, rather than contact signing date. considering the price change can happen since the biddiilg stage.

Constructability Assessment Model for International Construction Projects Using Structural Equation (구조방정식을 활용한 해외건설 프로젝트 시공성 평가 모델)

  • Lee, Yong Wook;Lee, Sang-Ku;Jang, Woosik;Han, Seung-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.941-951
    • /
    • 2015
  • In the recent years, Korean construction companies have been awarded 680 billion USD in the oversea projects which lead to a successful quantitative growth. However, due to the lack of capability in the core technology and project management compared to the leading companies, in addition to low-price bidding, massive deficit projects have caused problems to the companies. In order to overcome the limitations of the lack of capabilities, the term constructability has been researched recently by developed countries to apply in the practical use. The concept of constructability must be applied for Korean companies to compete in the EPC construction projects. The term constructability is defined as the factor that affect the overall construction process of a project which is defined by the ease of construction and to secure the project quality. Therefore, this study aims to develop a constructability assessment model using the structural equation to assess the factors that affect the constructability in the design and construction stage. The purpose of using the structural equation is to analyze the direct and indirect correlation between each factor that affects the international construction projects. Total of 8 latent variables and 34 measured variables are derived through literature review, corporate reports, experts' interview and surveys. The result of the model suggests the constructability factors that are to be managed the most efficiently to reduce cost, time and improve the quality as well as a countermeasure strategy to successfully execute the target international construction projects.

A Study on Cause-and-Effect Hierarchy of Profit Factors for the Feasibility Evaluation of Overseas Construction Projects (해외건설공사의 타당성 평가를 위한 수익성 영향인자의 인과관계 계층구조 구축에 관한 연구)

  • Sun Seung-Min;Kim Han-Him;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.373-378
    • /
    • 2003
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market following the outbreak of Iraq war. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposures through contract negotiation and its adjustment. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors from real overseas construction projects and structuring their cause-and-effect relationships. The profitability causal hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.

  • PDF

A Study for Enhancing the Criterion of the Software Cost Estimation (소프트웨어 개발비 대가기준 개선에 관한 연구)

  • Kwon, Ki-Tae;Byun, Boon-Hee
    • The KIPS Transactions:PartD
    • /
    • v.13D no.6 s.109
    • /
    • pp.815-822
    • /
    • 2006
  • It is very important that they accurately predict the software development cost in the early stage of a software development. Because cost estimations are required when bidding for a contract or determining whether a project is feasible in terms of a cost-benefit analysis. The criterions of the software cost estimation was set up to calculate software development cost more exactly, which is applied to made up a budget of the software business or to calculate a suitable cost to start the business in our country. However, as the software technology and environment are changing very rapidly, it need to enhance the criterion of the cost estimation continuously. Therefore, we tried to apply technology of software and a variety of factors of environment changes in present. Most of all, we proposed an introduction and readjustment of the adjustment factor applying 14 general system characteristics to improve the accuracy of the cost estimation and the schedule adjustment factor that is required by practicians. For evaluating the accuracy in terms of the real data, we have used MMRE & PRED. In result, we proved that the accuracy was clearly improved by applying the scale factor and readjusted VAF with 14 general system characteristics. Moreover, we evaluated the accuracy of the schedule adjustment factor.

A Study on Weight Estimation and Calculation of the Pipe Rack Structures for FPSO EPC Projects (FPSO Topsides Pipe Rack 견적 중량 추산 방법 연구)

  • Lee, Soo-Ho;Ahn, Hyun-Sik;Kim, Han-sung;Heo, Yoon;Bae, Jae-Ryu;Kim, Ki-Su;Ham, Seung-Ho;Lee, Sung-Min;Roh, Myung-Il
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.5
    • /
    • pp.362-370
    • /
    • 2016
  • The weight estimation and calculation of FPSO topsides is first performed at the bidding stage of projects. At this time, it is difficult to estimate and calculate accurately the weight because most of items of FPSO are not apparently defined. Especially, in the case of the pipe rack module, its portion of the total weight and the range of weight variation are large due to special features of piping and electric equipment in the module. Thus, it is very important to estimate and calculate accurately its weight in the task of the weight estimation and calculation of FPSO topsides. In this study, the past data for the weight of the pipe rack module were collected and analyzed, the WBS (Work Breakdown Structure) for the pipe rack module was constructed, and primary variables and secondary variables for developing a weight estimation and calculation model were selected. That is, after analyzing the past data, the volume was selected as the primary variable and the regression analysis was performed based on the variable. Then, several secondary variables were selected and incorporated into a weight estimation and calculation model. At this time, the weight per discipline was assumed from ratios of the total weight. Finally, the weight of the pipe rack module was estimated and calculated by using the developed model. As a result, the deviation from the model was better than that (-20 % ~ 60 %) of other studies about the weight estimation and calculation of FPSO topsides. Thus, the validity and applicability of the weight estimation and calculation of the pipe rack could be checked.

The hierarchical structures of cause-and-effect relationships on the profit factors in overseas construction projects (해외건설공사 수익성 영향인자의 계층구조 및 사레적용에 관한 연구)

  • Han, Seung-Heon;Sun, Seung-Min;Park, Sang-Hyuk;Jung, Do-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.64-76
    • /
    • 2006
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposure through contract negotiation and its adjustment. This research discusses the trend of environment in international construction markets. Then, it identifies the key factors that affect the profitability significantly through the structured surveys from 59 actual overseas projects, and it analyzes the key factors by using statistical methods. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors using the result of statistical analysis, literature review and structuring their cause-and-effect relationships. The profitability casual hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative and quantitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.

Deriving Key Risk Sub-Clauses for EPC/Turnkey Contract Conditions for Overseas Construction Projects - Based on FIDIC Conditions of Contract for EPC/Turnkey Projects, second edition 2017 - (해외건설공사 EPC/Turnkey 계약조건 핵심 리스크 세부조항 도출 - FIDIC Silver Book 2017년 개정판 기준으로 -)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.101-110
    • /
    • 2022
  • Recently, the global construction market is expected to grow at an annual average of 4.8% by 2025 and the risk of overseas construction is also expected to increase accordingly. In particular, domestic construction companies intensively participated in the EPC(Engineering, Procurement, Construction)/Turnkey project, but as a result of failing to respond to contractual risks, they have suffered losses of trillions of won in overseas business since 2013. Nevertheless, there have been not many studies on the derivation of EPC/Turnkey's contractual key risk sub-clauses. Therefore, in this study, the key risk sub-clauses were studied for the conditions of the 2017 Silver Book contract issued by the International Consulting Engineering Federation(FIDIC). To this end, 30 experts with more than 10 years of experience in international construction contracts were formed as a panel to conduct a Delphi survey on 170 sub-clauses of 21 clauses of FIDIC Silver Book to derive 62 main risk sub-clauses. In addition, the RPN(Risk Priority Number) was finally calculated using the FMEA(Failure Mode and Effect Analysis) technique, and 25 key risk sub-clauses within the Critical Risk range were derived. Through the results of this study, the practical point of view is able to refer to the contract provisions to be carefully reviewed at the bidding and contract signing stage in overseas construction projects. From an academic point of view, it provides direction and basic knowledge of how to study the contract fields used in overseas construction EPC/Turnkey projects.

Deriving Key Risk Sub-Clauses of FIDIC Conditions of Standard Subcontract -Based on FIDIC Conditions of Subcontract for Construction, edition 2011- (FIDIC 표준하도급 계약조건 핵심 리스크 세부조항 도출)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.439-448
    • /
    • 2022
  • Recently, domestic small and medium-sized subcontractors participating in the overseas construction market are suffering from the continuous loss and damage due to the insufficient recognition of the importance of risk Sub-Clauses among conditions of subcontracts. Therefore, the need to derive risk Sub-Clauses for conditions of the subcontract has been raised, but until now, previous studies have been conducted focusing on deriving risk Sub-Clauses for standard conditions of contract for construction between the Employer and the Contractor. In this study, 52 risk Sub-Clauses were derived on the basis of the influence size of the Sub-Clauses through the Delphi technique targeting 94 Sub-Clauses of conditions of standard subcontract for construction edition 2011, issued by the International Federation of Consulting Engineers (FIDIC) and In addition, 33 key risk Sub-Clauses were finally derived through the PI Risk Matrix by Probability and Impact. The results of this study provide will useful information on key risk Sub-Clauses that need to be reviewed in advance to minimize contractual risks at the stage of bidding and signing contracts for overseas subcontract construction projects.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

A Study on the Present Situation, Management Analysis, and Future Prospect of the Ornamental Tree Cultivation with respect to Environmental Improvement (환경개선(環境改善)을 위한 녹화수목재배(綠化樹木裁培)의 현황(現況) 및 경영분석(經營分析)과 전망(展望))

  • Park, Tai Sik;Kim, Tae Wook
    • Journal of Korean Society of Forest Science
    • /
    • v.34 no.1
    • /
    • pp.31-46
    • /
    • 1977
  • The study was made to give some helpful information for policy-making on ornamental tree cultivation by doing a survey on general situations, management analysis, and future prospects of the ornamental tree growing. The study was carried out through literature studies related to the subject, questionaire surveys, and on-the-spot investigation. The questionaire surveys could be divided into two parts: pre-questionaire survey and main-questionaire survey. In the pre-questionaire survey, the researchers intended to identify the total number of ornamental tree growers, cultivation areas in size and their locations. The questionaires were sent to each town and county administration authorities, forest cooperatives, and related organizations through-out the nation. The main-questionaires were prepared for detailed study and the questionaires were sent to 200 tree growers selected by option by taking considerations of the number of tree growers and the size of cultivating areas in regions. The main findings and some information obtained in the survey were as follows: 1. The total land for ornamental tree growing was amounted to 1,873.02 hectares and the number of cultivators was totaled to 2,717. 2. The main occupations of the ornamental tree growers were found in horticulture (41.9%), agronomy (25.9%), officialdom (11.3%), animal husbandry (6.5%), business circle(4.8%), and forestry (3.2%) in sequence. 3. The ornamental trees were cultivated mostly upperland (54.8), forest land (19.4%), rice paddy (11.3%) and others. 4. The educational training of the tree growers seemed quite high. The results of the survey indicated that a large number of tree growers was occupied by college graduates (38.7%), and then high school graduates (34.7%), middle school graduates (12.9%) in order. 5. The tree farming was undertaken as a side-job (41.9%) rather than main-job (23.4%), but a few of respondents rated as subsidiary-job (18.6%). 6. The management status classified by the rate of hired labors used was likely to belong to three categories: independant enterprise management (41.9%); half independant management (31.5%); and self-management (32.4%). 7. The majority of the tree growers sold their products to the consumers through middle-man channel (48.4%), or directly to the house-holder and detailers (13.7%), but a few of the respondents answered that they disposed of their products by bidding (11.2%) or by direct selling to the contractors (4.8%). 8. The channel cf marketing seemed somewhat complicated. The results of the survey were as: (1) producers ${\rightarrow}$consumers (22.6%) (2) producers ${\rightarrow}$field middle-men${\rightarrow}$consumers (33.1%) (3) producers ${\rightarrow}$field middle-men${\rightarrow}$first stage brokers${\rightarrow}$consumers (15.3%) (4) producers ${\rightarrow}$field middle-men${\rightarrow}$second stage middle-men${\rightarrow}$brokers${\rightarrow}$consumers (5.7%) (5) producers${\rightarrow}$field middle-men${\rightarrow}$third stage middle-men${\rightarrow}$second stage middlemen${\rightarrow}$brokers${\rightarrow}$consumers (4.8%) 9. It was responded that the margin for each stage of middle-men or brokers was assumed to be 30-50%(33.1%), 20-30%(32.3%), 50-100%(9.7%), and 100-200%(2.4%) in sequence. 10. The difference between the delivery price of consumers and field selling price of the producers seemed quite large. Majority of producers responded that they received half a price compared to the consumer's prices. 11. About two thirds of the respondents opposed to the measure of "Law on Preservation and Utilization of Agricultural Land" in which says that all the ornamental trees grown on flat agricultural lands less than 8 degrees in slope must be transplanted within three years to other places more than 8 degrees in slope. 12. The tree growers said that they have paid rather high land taxes than they ought to pay (38.7%), but come responded that land tax seemed to be appropriate (15.3%), and half of the respondents answered "not known". 13. The measures for the standardization of ornamental trees by size were backed up by a large number of respondents (57.3%), but one third of the respondents showed negative answer (29.8%). 14. About half of the respondents favored the systematic marketing through organization such as forest cooperatives (54%), but quite a few respondents opposed to organizing the systematic marketing channel (36.3%). 15. The necessary measures for permission in ornamental tree cultivation was rejected by a large number of respondents (49.2%) than those of favored (43.6%).

  • PDF